Zied Hajej

Orcid: 0000-0001-6604-0193

According to our database1, Zied Hajej authored at least 24 papers between 2009 and 2024.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2024
Joint optimization of a production/maintenance plan for serial machines with variable quality rate.
Proceedings of the 10th International Conference on Control, 2024

2023
Integrated Production, Maintenance, and Quality Strategy for Production Systems subject to Several Assignable Causes of Process Variation.
Proceedings of the 20th International Multi-Conference on Systems, Signals & Devices, 2023

2021
Online Activation and Deactivation of a Petri Net Supervisor.
Symmetry, 2021

2020
Joint optimization of capacity, production and maintenance planning of leased machines.
J. Intell. Manuf., 2020

Maintenance on leasing sales strategies for manufacturing/remanufacturing system with increasing failure rate and carbon emission.
Int. J. Prod. Res., 2020

An optimal integrated production and maintenance strategy for a multi-wind turbines system.
Int. J. Prod. Res., 2020

An optimal integrated lot sizing and maintenance strategy for multi-machines system with energy consumption.
Int. J. Prod. Res., 2020

Integrated maintenance/spare parts management for manufacturing system according to variable production rate impacting the system degradation.
Concurr. Eng. Res. Appl., 2020

Integrated Production, Maintenance and Control Chart of Supply Chain Management Under Quality Constraint.
Proceedings of the IEEE International Conference on Industrial Engineering and Engineering Management, 2020

2018
Quality issue in forecasting problem of production and maintenance policy for production unit.
Int. J. Prod. Res., 2018

An Optimal Integrated Maintenance to production with Carbon Emission for a Closed-loop System.
Proceedings of the 5th International Conference on Control, 2018

2017
Improved preventive maintenance in the framework of forecasting problem under subcontractor constraint.
Int. J. Prod. Res., 2017

FPA method for optimal production planning under availability/degradation machine and subcontracting constraint.
Int. J. Prod. Res., 2017

2015
Impact of the Corrective Maintenance Cost on Manufacturing Remanufacturing System Performance.
Proceedings of the Modelling, Computation and Optimization in Information Systems and Management Sciences - Proceedings of the 3rd International Conference on Modelling, Computation and Optimization in Information Systems and Management Sciences, 2015

Solving the Production and Maintenance Optimization Problem by a Global Approach.
Proceedings of the Modelling, Computation and Optimization in Information Systems and Management Sciences - Proceedings of the 3rd International Conference on Modelling, Computation and Optimization in Information Systems and Management Sciences, 2015

An optimal integrated maintenance for multi parallel workstations under returned products.
Proceedings of the 2015 IEEE International Conference on Industrial Engineering and Engineering Management, 2015

An optimal integrated maintenance strategy with switching policy under subcontracting constraint.
Proceedings of the 27th International Conference on Microelectronics, 2015

2014
Joint optimisation of maintenance and production policies with subcontracting and product returns.
J. Intell. Manuf., 2014

Integrated transportation and maintenance problem.
Proceedings of 11th IEEE International Conference on Networking, Sensing and Control, 2014

Maintenance optimisation for delivery means in the supply chain.
Proceedings of the International Conference on Advanced Logistics and Transport, 2014

2013
Optimal Production Planning for a Manufacturing System: An Approach Based on PA.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

An Optimal Production Planning and Maintenance Policy for a Multiple-Product and Single Machine under Failure Rate Dependency.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

2012
Impact of delivery time on optimal production/delivery/maintenance planning.
Proceedings of the 2012 IEEE International Conference on Automation Science and Engineering, 2012

2009
An optimal production/maintenance planning under stochastic random demand, service level and failure rate.
Proceedings of the IEEE Conference on Automation Science and Engineering, 2009


  Loading...