Z. Pelin Bayindir

Orcid: 0000-0002-8473-1382

According to our database1, Z. Pelin Bayindir authored at least 15 papers between 2005 and 2021.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2021
A comparison of pure manufacturing and hybrid manufacturing-remanufacturing systems under carbon tax policy.
Eur. J. Oper. Res., 2021

2020
Closing the loop in supply chains: Economic and environmental effects.
Comput. Ind. Eng., 2020

2019
Exact and heuristic approaches for joint maintenance and spare parts planning.
Comput. Ind. Eng., 2019

A Comparison of Forward and Closed-Loop Supply Chains.
Proceedings of the Operations Research Proceedings 2019, 2019

2017
Heuristics for multi-item two-echelon spare parts inventory control subject to aggregate and individual service measures.
Eur. J. Oper. Res., 2017

Value of disruption information in an EOQ environment.
Eur. J. Oper. Res., 2017

2016
Remedial actions for disassembly lines with stochastic task times.
Comput. Ind. Eng., 2016

2013
A Two-Sided Cumulative Sum Chart for First-Order Integer-Valued Autoregressive Processes of Poisson Counts.
Qual. Reliab. Eng. Int., 2013

2012
Multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouse under compound Poisson demand.
J. Oper. Res. Soc., 2012

Two-Stage Versus Single-Stage Inventory Models with or without Repair Ability.
Proceedings of the Operations Research Proceedings 2012, 2012

2010
An exact solution procedure for multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouse.
Oper. Res. Lett., 2010

2007
A deterministic inventory/production model with general inventory cost rate function and piecewise linear concave production costs.
Eur. J. Oper. Res., 2007

Assessing the benefits of remanufacturing option under one-way substitution and capacity constraint.
Comput. Oper. Res., 2007

2006
The joint replenishment problem with variable production costs.
Eur. J. Oper. Res., 2006

2005
Assessing the benefits of remanufacturing option under one-way substitution.
J. Oper. Res. Soc., 2005


  Loading...