Yuan-Shyi Peter Chiu
According to our database1,
Yuan-Shyi Peter Chiu
authored at least 20 papers
between 2007 and 2020.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
On csauthors.net:
Bibliography
2020
Proceedings of the Advances in Physical, Social & Occupational Ergonomics, 2020
2017
A discrete electromagnetism-like mechanism for parallel machine scheduling under a grade of service provision.
Int. J. Prod. Res., 2017
2015
Formulating grip strength and key pinch strength prediction models for Taiwanese: a comparison between stepwise regression and artificial neural networks.
J. Ambient Intell. Humaniz. Comput., 2015
2013
Expert Syst. Appl., 2013
Expert Syst. Appl., 2013
2012
Note on "replenishment run time problem with machine breakdown and failure in rework".
Expert Syst. Appl., 2012
Combining an alternative multi-delivery policy into economic production lot size problem with partial rework.
Expert Syst. Appl., 2012
Expert Syst. Appl., 2012
Notes on the mathematical modeling approach used to determine the replenishment policy for the EMQ model with rework and multiple shipments.
Appl. Math. Lett., 2012
2011
Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments.
Math. Comput. Model., 2011
Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown.
Comput. Ind. Eng., 2011
Computational Optimization of Manufacturing Batch Size and Shipment for an Integrated EPQ Model with Scrap.
Am. J. Comput. Math., 2011
2010
A note on "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns".
Eur. J. Oper. Res., 2010
Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown.
Comput. Math. Appl., 2010
Remarks on the optimization process of a manufacturing system with stochastic breakdown and rework.
Appl. Math. Lett., 2010
2009
A hybrid approach based on Hotelling statistics for automated visual inspection of display blemishes in LCD panels.
Expert Syst. Appl., 2009
Automated Industrial Inspection of Light-emitting Diodes Using Computer Vision.
Proceedings of the 2009 International Conference on Image Processing, 2009
2008
A note on optimal replenishment policy for imperfect quality EMQ model with rework and backlogging.
Comput. Math. Appl., 2008
2007
Math. Comput. Model., 2007
Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns.
Eur. J. Oper. Res., 2007