Yuan-Shyi Peter Chiu

According to our database1, Yuan-Shyi Peter Chiu authored at least 20 papers between 2007 and 2020.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2020
The Effects of Chemical Protective Clothing on Manual Dexterity.
Proceedings of the Advances in Physical, Social & Occupational Ergonomics, 2020

2017
A discrete electromagnetism-like mechanism for parallel machine scheduling under a grade of service provision.
Int. J. Prod. Res., 2017

2015
Formulating grip strength and key pinch strength prediction models for Taiwanese: a comparison between stepwise regression and artificial neural networks.
J. Ambient Intell. Humaniz. Comput., 2015

2013
Intra-supply chain system with multiple sales locations and quality assurance.
Expert Syst. Appl., 2013

An innovative blemish detection system for curved LED lenses.
Expert Syst. Appl., 2013

2012
Note on "replenishment run time problem with machine breakdown and failure in rework".
Expert Syst. Appl., 2012

Combining an alternative multi-delivery policy into economic production lot size problem with partial rework.
Expert Syst. Appl., 2012

Replenishment run time problem with machine breakdown and failure in rework.
Expert Syst. Appl., 2012

Notes on the mathematical modeling approach used to determine the replenishment policy for the EMQ model with rework and multiple shipments.
Appl. Math. Lett., 2012

2011
Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments.
Math. Comput. Model., 2011

Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown.
Comput. Ind. Eng., 2011

Computational Optimization of Manufacturing Batch Size and Shipment for an Integrated EPQ Model with Scrap.
Am. J. Comput. Math., 2011

2010
A note on "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns".
Eur. J. Oper. Res., 2010

Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown.
Comput. Math. Appl., 2010

Remarks on the optimization process of a manufacturing system with stochastic breakdown and rework.
Appl. Math. Lett., 2010

2009
A hybrid approach based on Hotelling statistics for automated visual inspection of display blemishes in LCD panels.
Expert Syst. Appl., 2009

Automated Industrial Inspection of Light-emitting Diodes Using Computer Vision.
Proceedings of the 2009 International Conference on Image Processing, 2009

2008
A note on optimal replenishment policy for imperfect quality EMQ model with rework and backlogging.
Comput. Math. Appl., 2008

2007
Optimal production lot sizing with rework, scrap rate, and service level constraint.
Math. Comput. Model., 2007

Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns.
Eur. J. Oper. Res., 2007


  Loading...