Yoshitaka Tanimizu

According to our database1, Yoshitaka Tanimizu authored at least 13 papers between 1998 and 2024.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2024
Basic Research on Laborer State Prediction Towards the Realization of Human Digital Twin.
Proceedings of the Advances in Production Management Systems. Production Management Systems for Volatile, Uncertain, Complex, and Ambiguous Environments, 2024

2021
Supply Chain Optimization Through Cooperative Negotiation by Using Backward Scheduling.
Proceedings of the Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, 2021

2015
Production Cost Analysis and Production Planning for Plant Factories Considering Markets.
Proceedings of the Advances in Production Management Systems: Innovative Production Management Towards Sustainable Growth, 2015

2014
Negotiation Strategy for Economical Reuse in Closed-Loop Supply Chains.
Proceedings of the Advances in Production Management Systems. Innovative and Knowledge-Based Production Management in a Global-Local World, 2014

2013
Flexible Multi-Layered Dynamic Supply Chain Models with Cooperative Negotiation.
Int. J. Autom. Technol., 2013

Modeling and Simulation of Closed-Loop Supply Chains Considering Economic Efficiency.
Proceedings of the Advances in Production Management Systems. Sustainable Production and Service Supply Chains, 2013

2012
Multi-Objective Production and Transportation Scheduling Considering Carbon Dioxide Emissions Reductions in Dynamic Supply Chains.
Int. J. Autom. Technol., 2012

2010
Multi agent architecture for dynamic incremental process planning in the flexible manufacturing system.
J. Intell. Manuf., 2010

2009
A Study on Real-Time Scheduling for Holonic Manufacturing Systems - Determination of Utility Values Based on Multi-agent Reinforcement Learning.
Proceedings of the Holonic and Multi-Agent Systems for Manufacturing, 2009

2007
A Study on Real-Time Scheduling for Holonic Manufacturing Systems - Simulation for Estimation of Future Status by Individual Holons.
Proceedings of the Holonic and Multi-Agent Systems for Manufacturing, 2007

2002
A study on Real-Time Scheduling Methods in Holonic Manufacturing systems.
Proceedings of the Knowledge and Skill Chains in Engineering and Manufacturing, 2002

1999
Object-oriented simulation of real-time scheduling in holonic manufacturing systems.
Proceedings of the Global Production Management, 1999

1998
A Study on Object-Oriented Model Repository for Manufacturing System Modeling.
Proceedings of the Globalization of Manufacturing in the Digital Communications Era of the 21<sup>st</sup> Century: Innovation, 1998


  Loading...