Yi-Chi Wang
Orcid: 0000-0003-0861-7526
According to our database1,
Yi-Chi Wang
authored at least 18 papers
between 2005 and 2024.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
On csauthors.net:
Bibliography
2024
Climate Downscaling: A Deep-Learning Based Super-resolution Model of Precipitation Data with Attention Block and Skip Connections.
CoRR, 2024
2020
A fuzzy nonlinear programming approach for planning energy-efficient wafer fabrication factories.
Appl. Soft Comput., 2020
2019
An incremental learning and integer-nonlinear programming approach to mining users' unknown preferences for ubiquitous hotel recommendation.
J. Ambient Intell. Humaniz. Comput., 2019
2017
Predictive distant operation and virtual control of computer numerical control machines.
J. Intell. Manuf., 2017
2016
A simulation analysis of part launching and order collection decisions for a flexible manufacturing system.
Simul. Model. Pract. Theory, 2016
2014
An Agent-Based Fuzzy Collaborative Intelligence Approach for Precise and Accurate Semiconductor Yield Forecasting.
IEEE Trans. Fuzzy Syst., 2014
J. Appl. Math., 2014
2013
A Fuzzy Rule for Improving the Performance of Multiobjective Job Dispatching in a Wafer Fabrication Factory.
J. Appl. Math., 2013
A post-classifying fuzzy-neural and data-fusion rule for job scheduling in a wafer fab - a simulation study.
Int. J. Manuf. Res., 2013
2012
Applied Neural Intelligence to Modeling, Control, and Management of Human Systems and Environments.
Appl. Comput. Intell. Soft Comput., 2012
2011
Intell. Data Anal., 2011
2010
A computational simulation approach for optimising process parameters in cutting operations.
Int. J. Comput. Integr. Manuf., 2010
2009
A fuzzy set approach for evaluating and enhancing the mid-term competitiveness of a semiconductor factory.
Fuzzy Sets Syst., 2009
Fuzzy-neural approaches with example post-classification for estimating job cycle time in a wafer fab.
Appl. Soft Comput., 2009
2008
Evaluating flexibility on order quantity and delivery lead time for a supply chain system.
Int. J. Syst. Sci., 2008
A hybrid intelligent approach for output projection in a semiconductor fabrication plant.
Intell. Data Anal., 2008
A sensitivity analysis of solving joint replenishment problems using the RAND method under inaccurate holding cost estimates and demand forecasts.
Comput. Ind. Eng., 2008
2005
Eng. Appl. Artif. Intell., 2005