Yeong-Dae Kim
Orcid: 0000-0003-4783-6430
According to our database1,
Yeong-Dae Kim
authored at least 51 papers
between 1993 and 2020.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
On csauthors.net:
Bibliography
2020
Int. Trans. Oper. Res., 2020
2019
Production planning in a two-level supply chain for production-time-dependent products with dynamic demands.
Comput. Ind. Eng., 2019
2017
Minimizing total tardiness in a two-machine flowshop scheduling problem with availability constraint on the first machine.
Comput. Ind. Eng., 2017
2016
Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times.
Comput. Oper. Res., 2016
Design and operation of a two-level supply chain for production-time-dependent products using Lagrangian relaxation.
Comput. Ind. Eng., 2016
2015
A branch and bound algorithm to minimize total tardiness of jobs in a two identical-parallel-machine scheduling problem with a machine availability constraint.
J. Oper. Res. Soc., 2015
Comput. Ind. Eng., 2015
2014
Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times.
Comput. Oper. Res., 2014
Multiple-criterion shortest path algorithms for global path planning of unmanned combat vehicles.
Comput. Ind. Eng., 2014
2013
Ann. Oper. Res., 2013
2012
Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance.
Comput. Oper. Res., 2012
Comput. Ind. Eng., 2012
2011
Heuristic algorithms for assigning and scheduling flight missions in a military aviation unit.
Comput. Ind. Eng., 2011
2010
Hierarchical Production Planning for Semiconductor Wafer Fabrication Based on Linear Programming and Discrete-Event Simulation.
IEEE Trans Autom. Sci. Eng., 2010
Eur. J. Oper. Res., 2010
2009
A branch-and-bound algorithm for a two-machine flowshop scheduling problem with limited waiting time constraints.
J. Oper. Res. Soc., 2009
Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint.
J. Heuristics, 2009
Eur. J. Oper. Res., 2009
2008
A measure of bullwhip effect in supply chains with a mixed autoregressive-moving average demand process.
Eur. J. Oper. Res., 2008
A branch and bound algorithm for an identical parallel machine scheduling problem with a job splitting property.
Comput. Oper. Res., 2008
Comput. Ind. Eng., 2008
Multi-product lot merging/splitting algorithms for a semiconductor wafer fabrication.
Proceedings of the 2008 Winter Simulation Conference, Global Gateway to Discovery, 2008
2007
J. Oper. Res. Soc., 2007
Eur. J. Oper. Res., 2007
Comput. Oper. Res., 2007
2005
J. Oper. Res. Soc., 2005
2004
Reallocation of paths of ABR services in a multistage interconnection network (MIN)-type ATM switch network.
Eur. J. Oper. Res., 2004
2003
IEEE Trans. Comput. Aided Des. Integr. Circuits Syst., 2003
A dispatching rule-based approach to production scheduling in a printed circuit board manufacturing system.
J. Oper. Res. Soc., 2003
2002
J. Oper. Res. Soc., 2002
J. Oper. Res. Soc., 2002
2001
Tool requirements planning in a flexible manufacturing system with an automatic tool transporter.
IEEE Trans. Robotics Autom., 2001
Production scheduling in a semiconductor wafer fabrication facility producing multiple product types with distinct due dates.
IEEE Trans. Robotics Autom., 2001
J. Oper. Res. Soc., 2001
Two-stage heuristic algorithms for part input sequencing in flexible manufacturing systems.
Eur. J. Oper. Res., 2001
2000
J. Oper. Res. Soc., 2000
A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints.
Eur. J. Oper. Res., 2000
1999
Heuristics for a tool provisioning problem in a flexible manufacturing system with an automatic tool transporter.
IEEE Trans. Robotics Autom., 1999
J. Oper. Res. Soc., 1999
J. Oper. Res. Soc., 1999
A branch and bound algorithm for locating input and output points of departments on the block layout.
J. Oper. Res. Soc., 1999
1998
J. Oper. Res. Soc., 1998
Comput. Oper. Res., 1998
1996
Simulated annealing and genetic algorithms for scheduling products with multi-level product structure.
Comput. Oper. Res., 1996
1995
A backward approach in list scheduling algorithms for multi-machine tardiness problems.
Comput. Oper. Res., 1995
1993
A new branch and bound algorithm for minimizing mean tardiness in two-machine flowshops.
Comput. Oper. Res., 1993