Xiaoqiang Cai
Orcid: 0000-0001-9829-5246
According to our database1,
Xiaoqiang Cai
authored at least 71 papers
between 1997 and 2024.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
On csauthors.net:
Bibliography
2024
Int. Trans. Oper. Res., November, 2024
Int. J. Prod. Res., April, 2024
Oper. Res. Lett., 2024
Manuf. Serv. Oper. Manag., 2024
Inf. Sci., 2024
Two-stage approximation allocation approach for real-time parking reservations considering stochastic requests and reusable resources.
Adv. Eng. Informatics, 2024
2023
Asia Pac. J. Oper. Res., June, 2023
2022
Transp. Sci., 2022
Swarm Evol. Comput., 2022
Cost and emission allocation for joint replenishment systems subject to carbon constraints.
Comput. Ind. Eng., 2022
Evaluation on Integrating Relocation and User Flexibility in Large-Scale One-Way Electric Carsharing Systems.
Proceedings of the Intelligent Systems and Applications, 2022
2021
SIAM J. Control. Optim., 2021
Altruistic profit allocation rules for joint replenishment with carbon cap-and-trade policy.
Eur. J. Oper. Res., 2021
Two-stage matching-and-scheduling algorithm for real-time private parking-sharing programs.
Comput. Oper. Res., 2021
Appl. Soft Comput., 2021
Optimal unrestricted dynamic stochastic scheduling with partial losses of work due to breakdowns.
Ann. Oper. Res., 2021
2020
Heterogeneous suppliers' contract design in assembly systems with asymmetric information.
Eur. J. Oper. Res., 2020
Optimal Purchasing Policy for Fresh Products from Multiple Supply Sources with Considerations of Random Delivery Times, Risk, and Information.
Decis. Sci., 2020
2019
Proceedings of the Intelligent Systems and Applications, 2019
2018
CoRR, 2018
2017
Coordinating a decentralized hybrid push-pull assembly system with unreliable supply and uncertain demand.
Ann. Oper. Res., 2017
2016
Cost allocation for less-than-truckload collaboration among perishable product retailers.
OR Spectr., 2016
Trade credit insurance, capital constraint, and the behavior of manufacturers and banks.
Ann. Oper. Res., 2016
Heuristic approach on dynamic lot-sizing model for durable products with end-of-use constraints.
Ann. Oper. Res., 2016
2015
Comput. Oper. Res., 2015
2014
Optimal acquisition and production policy in a hybrid manufacturing/remanufacturing system with core acquisition at different quality levels.
Eur. J. Oper. Res., 2014
Two-phase branch and bound algorithm for robotic cells rescheduling considering limited disturbance.
Comput. Oper. Res., 2014
Proceedings of the Algorithms and Architectures for Parallel Processing, 2014
2013
Eur. J. Oper. Res., 2013
A dynamic branch and bound approach for robotic rescheduling with randomly arriving jobs.
Proceedings of 10th IEEE International Conference on Networking, Sensing and Control, 2013
2012
Coordination of Outsourced Operations at a Third-Party Facility Subject to Booking, Overtime, and Tardiness Costs.
Oper. Res., 2012
2011
IEEE Trans. Syst. Man Cybern. Part A, 2011
J. Sched., 2011
Algorithms for estimating missing elements of incomplete intuitionistic preference relations.
Int. J. Intell. Syst., 2011
Eur. J. Oper. Res., 2011
2010
Nonlinear optimization models for multiple attribute group decision making with intuitionistic fuzzy information.
Int. J. Intell. Syst., 2010
Fuzzy Optim. Decis. Mak., 2010
Optimal Solution Structure for Multi-Period Production Planning with Returned Products remanufacturing.
Asia Pac. J. Oper. Res., 2010
Optimal manpower Planning Decision with Single Employee Type Considering Minimal Employment Period Constraint.
Asia Pac. J. Oper. Res., 2010
2009
J. Sched., 2009
Stochastic Scheduling Subject to Preemptive-Repeat Breakdowns with Incomplete Information.
Oper. Res., 2009
Int. J. Gen. Syst., 2009
A new decentralized approach for the lot sizing problem of durable products with demand substitution.
Proceedings of the 7th IEEE International Conference on Industrial Informatics, 2009
2007
J. Sched., 2007
Ann. Oper. Res., 2007
Optimal Commodity Distribution for a Vehicle with Fixed Capacity Under Vendor Managed Inventory.
Proceedings of the Combinatorics, 2007
A Scheduling Problem with One Producer and the Bargaining Counterpart with Two Producers.
Proceedings of the Combinatorics, 2007
2006
Uncapacitated production planning with multiple product types, returned product remanufacturing, and demand substitution.
OR Spectr., 2006
Proceedings of the IEEE International Conference on Systems, 2006
Maximizing Dual Function by Genetic Algorithm - A New Approach for Optimal Manpower Planning.
Proceedings of the Computational Intelligence, 2006
Proceedings of the IEEE Asia Pacific Conference on Circuits and Systems 2006, 2006
2005
Dynamically optimal policies for stochastic scheduling subject to preemptive-repeat machine breakdowns.
IEEE Trans Autom. Sci. Eng., 2005
J. Glob. Optim., 2005
Single-Machine Scheduling with Exponential Processing Times and General Stochastic Cost Functions.
J. Glob. Optim., 2005
Proceedings of the Algorithmic Applications in Management, First International Conference, 2005
2004
Proceedings of the Handbook of Scheduling - Algorithms, Models, and Performance Analysis., 2004
Proceedings of the IEEE International Conference on Systems, 2004
2003
2002
2001
2000
Multiprocessor task scheduling to minimize the maximum tardiness and the total completion time.
IEEE Trans. Robotics Autom., 2000
Asymmetric Earliness and Tardiness Scheduling with Exponential Processing Times on an Unreliable Machine.
Ann. Oper. Res., 2000
1998
1997
Sequencing jobs with random processing times to minimize weighted completion time variance.
Ann. Oper. Res., 1997