Xiandong Zhang

Orcid: 0000-0003-1442-3859

According to our database1, Xiandong Zhang authored at least 18 papers between 2010 and 2023.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2023
Approximation algorithms for scheduling monotonic moldable tasks on multiple platforms.
J. Sched., August, 2023

An improved approximation algorithm for scheduling monotonic moldable tasks.
Eur. J. Oper. Res., 2023

2022
Single-machine scheduling problems with general truncated sum-of-actual-processing-time-based learning effect.
J. Comb. Optim., 2022

Simulation of Cardiac Flow under the Septal Defect Based on Lattice Boltzmann Method.
Entropy, 2022

2021
Scheduling coupled tasks with exact delays for minimum total job completion time.
J. Sched., 2021

2019
Scheduling with time-of-use costs.
Eur. J. Oper. Res., 2019

2017
Polynomial Time Algorithms to Minimize Total Travel Time in a Two-Depot Automated Storage/Retrieval System.
Transp. Sci., 2017

Single-machine scheduling with times-based and job-dependent learning effect.
J. Oper. Res. Soc., 2017

2016
Increasing the revenue of self-storage warehouses by optimizing order scheduling.
Eur. J. Oper. Res., 2016

2015
Two-machine interval shop scheduling with time lags.
J. Sched., 2015

2014
Tactical fixed job scheduling with spread-time constraints.
Comput. Oper. Res., 2014

2013
Moving target detection algorithm based on Gaussian mixture model.
Proceedings of the Fifth International Conference on Digital Image Processing, 2013

2012
Scheduling an unbounded batching machine with family jobs and setup times.
J. Oper. Res. Soc., 2012

Approximation algorithms for the parallel flow shop problem.
Eur. J. Oper. Res., 2012

2011
An Integrated Pricing and Deteriorating Model and a Hybrid Algorithm for a VMI (Vendor-Managed-Inventory) Supply Chain.
IEEE Trans Autom. Sci. Eng., 2011

2010
Polynomial-time approximation schemes for scheduling problems with time lags.
J. Sched., 2010

On-line two-machine job shop scheduling with time lags.
Inf. Process. Lett., 2010

On-line two-machine open shop scheduling with time lags.
Eur. J. Oper. Res., 2010


  Loading...