Wei Lin Teoh

Orcid: 0000-0003-4715-1490

According to our database1, Wei Lin Teoh authored at least 21 papers between 2012 and 2024.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2024
The multivariate exponentially weighted moving average chart for monitoring short production runs.
Commun. Stat. Simul. Comput., July, 2024

Optimal designs of the omnibus SPRT control chart for joint monitoring of process mean and dispersion.
Int. J. Prod. Res., 2024

Enhanced distribution-free Cucconi schemes based on runs: An application to the surveillance of daily average customer service time.
Comput. Ind. Eng., 2024

2023
An Analysis of the Performance of the SPRT Chart with Estimated Parameters Under the Weibull Distribution.
Proceedings of the 12th International Conference on Robotics, 2023

Construction of the Shewhart Median Chart Based on the Expected Percentile Run Length.
Proceedings of the 13th IEEE International Conference on Control System, 2023

2022
Optimal designs of the exponentially weighted moving average (EWMA) median chart for known and estimated parameters based on median run length.
Commun. Stat. Simul. Comput., 2022

On designing an optimal SPRT control chart with estimated process parameters under guaranteed in-control performance.
Comput. Ind. Eng., 2022

Design of the Shewhart Median Scheme with the Percentile-Based Approach.
Proceedings of the ICSCA 2022: 11th International Conference on Software and Computer Applications, Melaka, Malaysia, February 24, 2022

2020
Optimal design of the modified group runs (MGR) X¯ chart when process parameters are estimated.
Commun. Stat. Simul. Comput., 2020

2019
An improved variable sample size and sampling interval S control chart.
Qual. Reliab. Eng. Int., 2019

Optimal design of the side-sensitive modified group runs (SSMGR) chart when process parameters are estimated.
Qual. Reliab. Eng. Int., 2019

2018
Adaptive multivariate double sampling and variable sampling interval Hotelling's T2 charts.
Qual. Reliab. Eng. Int., 2018

2017
Optimal Designs of the Variable Sample Size X¯Chart Based on Median Run Length and Expected Median Run Length.
Qual. Reliab. Eng. Int., 2017

Run sum X¯ control chart with estimated process parameters.
Qual. Reliab. Eng. Int., 2017

Run-sum control charts for monitoring the coefficient of variation.
Eur. J. Oper. Res., 2017

Optimal designs of the synthetic t chart with estimated process mean.
Comput. Ind. Eng., 2017

Run sum chart for monitoring multivariate coefficient of variation.
Comput. Ind. Eng., 2017

2016
A Control Chart for the Multivariate Coefficient of Variation.
Qual. Reliab. Eng. Int., 2016

The Exact Run Length Distribution and Design of the Shewhart X̅ Chart with Estimated Parameters Based on Median Run Length.
Commun. Stat. Simul. Comput., 2016

2014
Optimal design of the double sampling X chart with estimated parameters based on median run length.
Comput. Ind. Eng., 2014

2012
The Revised <i>m</i>-of-<i>k</i> Runs Rule Based on Median Run Length.
Commun. Stat. Simul. Comput., 2012


  Loading...