Udo Hönig

According to our database1, Udo Hönig authored at least 8 papers between 2003 and 2010.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2010
A parallel shifting bottleneck heuristic for scheduling complex job shops: Architecture and performance assessment.
Proceedings of the IEEE Conference on Automation Science and Engineering, 2010

2009
Synergiepotenziale zwischen Grid- und eScience-Technologien für die digitale Langzeitarchivierung.
nestor Materialien 12, 2009

2008
Fault-tolerant static scheduling for grids.
Proceedings of the 22nd IEEE International Symposium on Parallel and Distributed Processing, 2008

2006
Improving the Efficiency of Functional Parallelism by Means of Hyper-Scheduling.
Proceedings of the 2006 International Conference on Parallel Processing Workshops (ICPP Workshops 2006), 2006

2005
An ACO-Based Approach for Scheduling Task Graphs with Communication Costs.
Proceedings of the 34th International Conference on Parallel Processing (ICPP 2005), 2005

2004
Internet-basierter Übungsbetrieb in Technischer Informatik (Web-Based Exercises in Computer Engineering).
it Inf. Technol., 2004

Fast Optimal Task Graph Scheduling by Means of an Optimized Parallel A<sup>*</sup>-Algorithm.
Proceedings of the International Conference on Parallel and Distributed Processing Techniques and Applications, 2004

2003
A Parallel Branch-and-Bound Algorithm for Computing Optimal Task Graph Schedules.
Proceedings of the Grid and Cooperative Computing, Second International Workshop, 2003


  Loading...