Tzu-Hsin Liu
Orcid: 0000-0001-9862-8282
According to our database1,
Tzu-Hsin Liu
authored at least 30 papers
between 2005 and 2024.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
On csauthors.net:
Bibliography
2024
Ann. Oper. Res., September, 2024
2023
Optimal replacement policy for a two-unit system subject to shocks and cumulative damage.
Reliab. Eng. Syst. Saf., October, 2023
Preemptive Priority Markovian Queue Subject to Server Breakdown with Imperfect Coverage and Working Vacation Interruption.
Comput., May, 2023
Proceedings of the International Conference on Consumer Electronics - Taiwan, 2023
2022
Cost-Benefit Analysis of a Standby Retrial System with an Unreliable Server and Switching Failure.
Comput., 2022
2021
Reliab. Eng. Syst. Saf., 2021
RAIRO Oper. Res., 2021
Comput. Ind. Eng., 2021
2020
IEEE Trans. Engineering Management, 2020
Comput. Ind. Eng., 2020
2019
Reliab. Eng. Syst. Saf., 2019
2018
Expanding the two wings of social capital for value creation: strategic entrepreneurship of HTC, 1997-2008.
Technol. Anal. Strateg. Manag., 2018
Reliab. Eng. Syst. Saf., 2018
Modeling of machine interference problem with unreliable repairman and standbys imperfect switchover.
Reliab. Eng. Syst. Saf., 2018
2017
Statistical inference for the availability of repairable system with general repair, reboot delay, and switching railure.
Commun. Stat. Simul. Comput., 2017
2016
Ann. Oper. Res., 2016
2015
Extended Optimal Replacement Policy for a Two-Unit System With Shock Damage Interaction.
IEEE Trans. Reliab., 2015
An optimum approach of profit analysis on the machine repair system with heterogeneous repairmen.
Appl. Math. Comput., 2015
2014
Optimization analysis of an unreliable multi-server queue with a controllable repair policy.
Comput. Oper. Res., 2014
Optimal number of repairs before replacement for a two-unit system subject to non-homogeneous pure birth process.
Comput. Ind. Eng., 2014
Modeling of multi-server repair problem with switching failure and reboot delay and related profit analysis.
Comput. Ind. Eng., 2014
2013
Comput. Oper. Res., 2013
2011
Standby system with general repair, reboot delay, switching failure and unreliable repair facility - A statistical standpoint.
Math. Comput. Simul., 2011
Bootstrapping Computation of Availability for a Repairable System with Standby Subject to Imperfect Switching.
Commun. Stat. Simul. Comput., 2011
2006
2005
Int. J. Technol. Manag., 2005