Tom Rihm

Orcid: 0000-0001-6010-5945

According to our database1, Tom Rihm authored at least 4 papers between 2015 and 2019.

Collaborative distances:
  • Dijkstra number2 of six.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2019
Two continuous-time assignment-based models for the multi-mode resource-constrained project scheduling problem.
Comput. Ind. Eng., 2019

2018
Staff assignment with lexicographically ordered acceptance levels.
J. Sched., 2018

A Continuous-Time MILP Formulation for the Multi-Mode Resource-Constrained Project Scheduling Problem.
Proceedings of the 2018 IEEE International Conference on Industrial Engineering and Engineering Management, 2018

2015
Improving fairness in staff assignment: An approach for lexicographic goal programming.
Proceedings of the 2015 IEEE International Conference on Industrial Engineering and Engineering Management, 2015


  Loading...