To-Cheng Wang
Orcid: 0000-0001-8905-6913
According to our database1,
To-Cheng Wang
authored at least 14 papers
between 2020 and 2024.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
Online presence:
-
on orcid.org
On csauthors.net:
Bibliography
2024
A modified reliability acceptance sampling plan with warranty return rate consideration under Weibull-distributed accelerated lifetime data.
Qual. Reliab. Eng. Int., June, 2024
Construction of acceptance sampling schemes for exponential lifetime products with progressive type II right censoring.
Reliab. Eng. Syst. Saf., March, 2024
Optimal design of an integrated inspection scheme with two adjustable sampling mechanisms for lot disposition.
Adv. Eng. Informatics, 2024
Development of a generalised dual sampling system with a flexible decision-rule-transformation mechanism.
Adv. Eng. Informatics, 2024
2023
Integrated green-and-quality inspection schemes for green product quality with six-sigma yield assurance and risk management: A graphical web-based tool for verifying green product quality efficiently.
Qual. Reliab. Eng. Int., November, 2023
Development of an adaptive sampling system based on a process capability index with flexible switching mechanism.
Int. J. Prod. Res., November, 2023
2022
Optimum design of generalized adaptive sampling plan for solid supplier-buyer purchasing partnership with yield-driven validation.
Expert Syst. Appl., October, 2022
Adjustable variables multiple-dependent-state sampling plans based on a process capability index.
J. Oper. Res. Soc., 2022
An integrated quick-switch sampling system based on a process capability index for constructing a solid supplier-buyer relationship.
Int. J. Prod. Res., 2022
Generalized quick-switch sampling systems indexed by Taguchi capability with record traceability.
Comput. Ind. Eng., 2022
A variables-type multiple-dependent-state sampling plan based on the lifetime performance index under a Weibull distribution.
Ann. Oper. Res., 2022
2021
Process-capability-qualified adjustable multiple-dependent-state sampling plan for a long-term supplier-buyer relationship.
Qual. Reliab. Eng. Int., 2021
An Integrated Supplier-Buyer Lots Sampling Plan With Quality Traceability Based on Process Loss Restricted Consideration.
IEEE Access, 2021
2020
Lot-dependent sampling plans for qualifying long-term production capability with a one-sided specification.
Comput. Ind. Eng., 2020