Tian Xiang Cai

According to our database1, Tian Xiang Cai authored at least 15 papers between 2002 and 2022.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2022
Implementing Distribution Requirement Planning and Scheduling System for Lens Manufacturing Company.
Proceedings of the IEEE International Conference on Industrial Engineering and Engineering Management, 2022

2020
Implementing Real-time Scheduling System for a Precision Engineering Company in Singapore.
Proceedings of the IEEE International Conference on Industrial Engineering and Engineering Management, 2020

2018
Multi-level job scheduling under processing time uncertainty.
Comput. Ind. Eng., 2018

2017
A hybrid artificial bee colony algorithm for the job-shop scheduling problem with no-wait constraint.
Soft Comput., 2017

2016
Discrete harmony search algorithm for flexible job shop scheduling problem with multiple objectives.
J. Intell. Manuf., 2016

An improved artificial bee colony algorithm for flexible job-shop scheduling problem with fuzzy processing time.
Expert Syst. Appl., 2016

2015
A two-stage artificial bee colony algorithm scheduling flexible job-shop scheduling problem with new job insertion.
Expert Syst. Appl., 2015

2014
Pareto-based grouping discrete harmony search algorithm for multi-objective flexible job shop scheduling.
Inf. Sci., 2014

2013
Hybrid discrete harmony search algorithm for scheduling re-processing problem in remanufacturing.
Proceedings of the Genetic and Evolutionary Computation Conference, 2013

2008
Dynamic operations and manpower scheduling for high-mix, low-volume manufacturing.
Proceedings of 13th IEEE International Conference on Emerging Technologies and Factory Automation, 2008

2007
Common capacity modelling for multi-site planning: case studies.
Proceedings of 12th IEEE International Conference on Emerging Technologies and Factory Automation, 2007

A heuristic approach for scheduling multi-chip packages for semiconductor backend assembly.
Proceedings of 12th IEEE International Conference on Emerging Technologies and Factory Automation, 2007

2006
A Heuristics-based Advanced Planning and Scheduling System with Bottleneck Scheduling Algorithm.
Proceedings of 11th IEEE International Conference on Emerging Technologies and Factory Automation, 2006

2004
A rule-based heuristic finite capacity scheduling system for semiconductor backend assembly.
Int. J. Comput. Integr. Manuf., 2004

2002
APS, ERP and MES systems integration for semiconductor backend assembly.
Proceedings of the Seventh International Conference on Control, 2002


  Loading...