Tae-Sun Yu

Orcid: 0000-0002-9209-108X

According to our database1, Tae-Sun Yu authored at least 14 papers between 2013 and 2023.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2023
Cleaning Plan Optimization for Dual-Armed Cluster Tools With General Chamber Cleaning Periods.
IEEE Trans Autom. Sci. Eng., July, 2023

2022
Feedback Control of Cluster Tools: Stability Against Random Time Disruptions.
IEEE Trans Autom. Sci. Eng., 2022

Data Driven Optimal Coil Batching for Annealing Lines with Eligibility Constraints.
Proceedings of the IEEE International Conference on Big Data, 2022

2021
Integrated Scheduling of a Dual-Armed Cluster Tool for Maximizing Steady Schedule Patterns.
IEEE Trans. Syst. Man Cybern. Syst., 2021

Wafer Delay Analysis and Workload Balancing of Parallel Chambers for Dual-Armed Cluster Tools With Multiple Wafer Types.
IEEE Trans Autom. Sci. Eng., 2021

Reachability Tree-Based Optimization Algorithm for Cyclic Scheduling of Timed Petri Nets.
IEEE Trans Autom. Sci. Eng., 2021

2020
Adaptive Scheduling of Cluster Tools With Wafer Delay Constraints and Process Time Variation.
IEEE Trans Autom. Sci. Eng., 2020

Wafer delay analysis and control of dual-armed cluster tools with chamber cleaning operations.
Int. J. Prod. Res., 2020

Flow shops with reentry: Reversibility properties and makespan optimal schedules.
Eur. J. Oper. Res., 2020

2019
Scheduling Dual-Armed Cluster Tools With Chamber Cleaning Operations.
IEEE Trans Autom. Sci. Eng., 2019

A New Class of Sequences Without Interferences for Cluster Tools With Tight Wafer Delay Constraints.
IEEE Trans Autom. Sci. Eng., 2019

Scheduling Dual-Armed Cluster Tools for Concurrent Processing of Multiple Wafer Types With Identical Job Flows.
IEEE Trans Autom. Sci. Eng., 2019

2018
Scheduling Single-Armed Cluster Tools With Chamber Cleaning Operations.
IEEE Trans Autom. Sci. Eng., 2018

2013
Two-stage lot scheduling with waiting time constraints and due dates.
Proceedings of the Winter Simulations Conference: Simulation Making Decisions in a Complex World, 2013


  Loading...