Surendra M. Gupta
Orcid: 0000-0002-6194-2857
According to our database1,
Surendra M. Gupta
authored at least 50 papers
between 1994 and 2021.
Collaborative distances:
Collaborative distances:
Timeline
1995
2000
2005
2010
2015
2020
0
1
2
3
4
5
6
7
1
1
6
2
2
2
3
2
1
2
1
2
3
1
1
1
1
1
1
1
2
2
2
2
1
1
2
1
1
1
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
On csauthors.net:
Bibliography
2021
A genetic simulated annealing algorithm for parallel partial disassembly line balancing problem.
Appl. Soft Comput., 2021
2020
An Intelligent Multiattribute Group Decision-Making Approach With Preference Elicitation for Performance Evaluation.
IEEE Trans. Engineering Management, 2020
Predictive analysis of electronic waste for reverse logistics operations: a comparison of improved univariate grey models.
Soft Comput., 2020
Value depreciation factors for new and remanufactured high-technology products: a case study on iPhones and iPads.
Int. J. Prod. Res., 2020
Trade-in-to-upgrade as a marketing strategy in disassembly-to-order systems at the edge of blockchain technology.
Int. J. Prod. Res., 2020
Collaboration Strategy for a Decentralized Supply Chain Using Linear Physical Programming.
Int. J. Autom. Technol., 2020
2019
A Robust Robotic Disassembly Sequence Design Using Orthogonal Arrays and Task Allocation.
Robotics, 2019
Disassembly line balancing problem: a review of the state of the art and future directions.
Int. J. Prod. Res., 2019
2018
A Decision Maker-Centered End-of-Life Product Recovery System for Robot Task Sequencing.
J. Intell. Robotic Syst., 2018
Modeling and Analysis of a Closed-Loop Supply Chain in Consideration of Extra Demand.
Int. J. Autom. Technol., 2018
Proceedings of the 2018 IEEE International Conference on Industrial Engineering and Engineering Management, 2018
2017
Int. J. Autom. Technol., 2017
A holistic approach for performance evaluation using quantitative and qualitative data: A food industry case study.
Expert Syst. Appl., 2017
2016
Fuzzy Linear Physical Programming for Multiple Criteria Decision-Making Under Uncertainty.
Int. J. Comput. Commun. Control, 2016
A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem.
Ann. Oper. Res., 2016
Proceedings of the Advances in Production Management Systems. Initiatives for a Sustainable World, 2016
2014
A multi-criteria decision making model for advanced repair-to-order and disassembly-to-order system.
Eur. J. Oper. Res., 2014
Quality management in product recovery using the Internet of Things: An optimization approach.
Comput. Ind., 2014
2013
Artificial bee colony algorithm for solving sequence-dependent disassembly line balancing problem.
Expert Syst. Appl., 2013
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013
Simulated Annealing Algorithm for Solving Sequence-Dependent Disassembly Line Balancing Problem.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013
2012
IEEE Trans. Ind. Informatics, 2012
J. Intell. Robotic Syst., 2012
2011
Int. J. Manuf. Technol. Manag., 2011
2010
Comparison of economic benefits of sensor embedded products and conventional products in a multi-product disassembly line.
Comput. Ind. Eng., 2010
Comput. Ind. Eng., 2010
Proceedings of the 2010 Winter Simulation Conference, 2010
2009
Int. J. Math. Oper. Res., 2009
Int. J. Bus. Perform. Supply Chain Model., 2009
Int. J. Adv. Oper. Manag., 2009
2008
Proceedings of the Metaheuristics for Scheduling in Industrial and Manufacturing Applications, 2008
Comput. Oper. Res., 2008
2007
Eur. J. Oper. Res., 2007
2005
2003
Int. J. Manuf. Technol. Manag., 2003
Proceedings of the IEEE International Conference on Systems, 2003
2002
J. Intell. Manuf., 2002
2001
Petri net approach to disassembly process planning for products with complex AND/OR precedence relationships.
Eur. J. Oper. Res., 2001
2000
Ann. Oper. Res., 2000
1999
Int. J. Comput. Integr. Manuf., 1999
Expansion method for the throughput analysis of open finite manufacturing/queueing networks with N-policy.
Comput. Oper. Res., 1999
1998
Proceedings of the IEEE International Conference on Systems, Man and Cybernetics, 1998
1997
Comput. Oper. Res., 1997
1995
Queueing Model with State Dependent Balking and Reneging: Its Complementary and Equivalence.
SIGMETRICS Perform. Evaluation Rev., 1995
Comput. Oper. Res., 1995
1994
SIGMETRICS Perform. Evaluation Rev., 1994
Comput. Oper. Res., 1994