Suna Kondakci Köksalan

According to our database1, Suna Kondakci Köksalan authored at least 4 papers between 2001 and 2004.

Collaborative distances:
  • Dijkstra number2 of six.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2004
Two-machine flow shop scheduling with two criteria: Maximum earliness and makespan.
Eur. J. Oper. Res., 2004

2003
Scheduling to minimize maximum earliness and number of tardy jobs where machine idle time is allowed.
J. Oper. Res. Soc., 2003

Single machine scheduling with maximum earliness and number tardy.
Comput. Ind. Eng., 2003

2001
A flexible flowshop problem with total flow time minimization.
Eur. J. Oper. Res., 2001


  Loading...