Sonia Hajri-Gabouj

According to our database1, Sonia Hajri-Gabouj authored at least 15 papers between 2003 and 2024.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2024
Collaborative and integrated data-driven delay prediction and supplier selection optimization: A case study in a furniture industry.
Comput. Ind. Eng., 2024

2016
Using immune designed ontologies to monitor disruptions in manufacturing systems.
Comput. Ind., 2016

2015
Fault detection, diagnosis and recovery using Artificial Immune Systems: A review.
Eng. Appl. Artif. Intell., 2015

2014
Exact resolution of the two-stage hybrid flow shop with dedicated machines.
Optim. Lett., 2014

The Two-stage Assembly Flow Shop Scheduling with an Availability Constraint: Worst Case Analysis.
J. Math. Model. Algorithms Oper. Res., 2014

2013
Design of a robust layout with information uncertainty increasing over time: A fuzzy evolutionaryapproach.
Eng. Appl. Artif. Intell., 2013

Handling disruptions in manufacturing systems: An immune perspective.
Eng. Appl. Artif. Intell., 2013

2012
A note on the two-stage hybrid flow shop problem with dedicated machines.
Optim. Lett., 2012

Enterprise Information Systems' Interoperability: Focus on PLM Challenges.
Proceedings of the Advances in Production Management Systems. Competitive Manufacturing for Innovative Products and Services, 2012

2011
Using ontologies to capture and structure knowledge about disruptions in manufacturing systems: An immune driven approach.
Proceedings of the IEEE 16th Conference on Emerging Technologies & Factory Automation, 2011

2010
Analysis of robustness in proactive scheduling: A graphical approach.
Comput. Ind. Eng., 2010

An improved heuristic for two-machine flow shop scheduling with an availability constraint and nonresumable jobs.
4OR, 2010

2009
Méthode heuristique pour le problème de flow shop hybride avec machines dédiées.
RAIRO Oper. Res., 2009

2007
Facility layout problems: A survey.
Annu. Rev. Control., 2007

2003
A fuzzy genetic multiobjective optimization algorithm for a multilevel generalized assignment problem.
IEEE Trans. Syst. Man Cybern. Part C, 2003


  Loading...