Shunji Tanaka
Orcid: 0000-0002-0181-743X
According to our database1,
Shunji Tanaka
authored at least 32 papers
between 1987 and 2025.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
On csauthors.net:
Bibliography
2025
Perishable inventory control with backlogging penalties: A mixed-integer linear programming model via two-step approximation.
Comput. Oper. Res., 2025
2024
Comput. Oper. Res., 2024
2023
An exact algorithm for the unrestricted container relocation problem with new lower bounds and dominance rules.
Eur. J. Oper. Res., 2023
2022
An exact approach to the restricted block relocation problem based on a new integer programming formulation.
Eur. J. Oper. Res., 2022
2020
Deep learning assisted heuristic tree search for the container pre-marshalling problem.
Comput. Oper. Res., 2020
A Mixed-integer Programming Approach to Group Control of Elevator Systems with Destination Hall Call Registration.
Proceedings of the IEEE International Conference on Industrial Engineering and Engineering Management, 2020
2019
Eur. J. Oper. Res., 2019
Eur. J. Oper. Res., 2019
2018
Solving real-world sized container pre-marshalling problems with an iterative deepening branch-and-bound algorithm.
Eur. J. Oper. Res., 2018
Comput. Oper. Res., 2018
2016
IEEE Trans Autom. Sci. Eng., 2016
The two-machine flowshop total completion time problem: Branch-and-bound algorithms based on network-flow formulation.
Eur. J. Oper. Res., 2016
2015
Proceedings of the 2015 IEEE International Conference on Industrial Engineering and Engineering Management, 2015
Dominance properties for the unrestricted block relocation problem and their application to a branch-and-bound algorithm.
Proceedings of the IEEE International Conference on Automation Science and Engineering, 2015
2014
Improved Exact Enumerative Algorithmsfor the Planted ($l$, $d$)-Motif Search Problem.
IEEE ACM Trans. Comput. Biol. Bioinform., 2014
An Efficient Beamforming Algorithm for Large-Scale Phased Arrays with Lossy Digital Phase Shifters.
IEICE Trans. Commun., 2014
2013
Eur. J. Oper. Res., 2013
An exact algorithm for the single-machine total weighted tardiness problem with sequence-dependent setup times.
Comput. Oper. Res., 2013
Proceedings of the IEEE International Conference on Systems, 2013
2012
A dynamic-programming-based exact algorithm for general single-machine scheduling with machine idle time.
J. Sched., 2012
Comput. Oper. Res., 2012
2011
Proceedings of the IEEE Conference on Automation Science and Engineering, 2011
2009
J. Sched., 2009
Proceedings of the Affective Computing and Intelligent Interaction, 2009
2008
An efficient exact algorithm for general single-machine scheduling with machine idle time.
Proceedings of the 2008 IEEE International Conference on Automation Science and Engineering, 2008
2005
Dynamic optimization of the operation of single-car elevator systems with destination hall call registration: Part II. The solution algorithm.
Eur. J. Oper. Res., 2005
Dynamic optimization of the operation of single-car elevator systems with destination hall call registration: Part I. Formulation and simulations.
Eur. J. Oper. Res., 2005
Decomposition of the single-machine total tardiness problem with a precedence constraint.
Proceedings of the IEEE International Conference on Systems, 2005
2004
A study on objective functions for dynamic operation optimization of a single-car elevator system with destination hall call registration.
Proceedings of the IEEE International Conference on Systems, 2004
2003
A branch-and-bound algorithm for the single-machine weighted earliness-tardiness scheduling problem with job independent weights.
Proceedings of the IEEE International Conference on Systems, 2003
2002
A Study on the Optimal Cost for the H<sub>infty</sub> Problem of Discrete Linear Periodically Time-Varying Systems.
SIAM J. Control. Optim., 2002
1987
IEEE Trans. Computers, 1987