Shaojun Lu
Orcid: 0009-0009-1775-7943
According to our database1,
Shaojun Lu
authored at least 25 papers
between 2018 and 2024.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
On csauthors.net:
Bibliography
2024
Data-driven robust optimization of dual-channel closed-loop supply chain network design considering uncertain demand and carbon cap-and-trade policy.
Comput. Ind. Eng., January, 2024
A green scheduling model for two-stage photo-etching and acid-etching collaboration in semiconductor manufacturing.
J. Ind. Inf. Integr., 2024
Coordinated production and delivery scheduling for service-oriented manufacturing systems with deterioration effect.
Int. J. Prod. Res., 2024
A variable neighborhood search and mixed-integer programming models for a distributed maintenance service network scheduling problem.
Int. J. Prod. Res., 2024
A Double Deep Q-Network framework for a flexible job shop scheduling problem with dynamic job arrivals and urgent job insertions.
Eng. Appl. Artif. Intell., 2024
Scheduling identical serial-batching machines in the engine manufacturing supply chain by an integrated variable neighborhood search algorithm.
Comput. Oper. Res., 2024
Closed-loop supply chain network design with price-greenness-sensitive demand: A distributionally robust chance-constrained optimization approach.
Comput. Oper. Res., 2024
Dynamic scheduling of decentralized high-end equipment R&D projects via deep reinforcement learning.
Comput. Ind. Eng., 2024
Proceedings of the 46th International Conference on Software Engineering: Software Engineering in Practice, 2024
2023
Integrated optimization of production scheduling and maintenance planning with dynamic job arrivals and mold constraints.
Comput. Ind. Eng., December, 2023
Ann. Math. Artif. Intell., June, 2023
Modified benders decomposition and metaheuristics for multi-machine parallel-batch scheduling and resource allocation under deterioration effect.
Comput. Ind. Eng., February, 2023
Preemptive multi-skill resource-constrained project scheduling of marine power equipment maintenance tasks.
J. Intell. Fuzzy Syst., 2023
Optimal pricing and supply strategy for vertically integrated manufacturers with customer preference and market spillover.
Comput. Ind. Eng., 2023
2022
A hybrid metaheuristic for a semiconductor production scheduling problem with deterioration effect and resource constraints.
Oper. Res., 2022
Solving a stochastic hierarchical scheduling problem by VNS-based metaheuristic with locally assisted algorithms.
Appl. Soft Comput., 2022
2021
Permutation flowshop manufacturing cell scheduling problems with deteriorating jobs and sequence dependent setup times under dominant machines.
Optim. Lett., 2021
A hybrid DBH-VNS for high-end equipment production scheduling with machine failures and preventive maintenance activities.
J. Comput. Appl. Math., 2021
Energy-efficient rescheduling with time-of-use energy cost: Application of variable neighborhood search algorithm.
Comput. Ind. Eng., 2021
A variable neighborhood search approach for the resource-constrained multi-project collaborative scheduling problem.
Appl. Soft Comput., 2021
2020
Less is more: variable neighborhood search for integrated production and assembly in smart manufacturing.
J. Sched., 2020
Robust parallel-batching scheduling with fuzzy deteriorating processing time and variable delivery time in smart manufacturing.
Fuzzy Optim. Decis. Mak., 2020
2018
Single-Machine and Parallel-Machine Parallel-Batching Scheduling Considering Deteriorating Jobs, Various Group, and Time-Dependent Setup Time.
Informatica, 2018
A hybrid VNS-HS algorithm for a supply chain scheduling problem with deteriorating jobs.
Int. J. Prod. Res., 2018
A hybrid ABC-TS algorithm for the unrelated parallel-batching machines scheduling problem with deteriorating jobs and maintenance activity.
Appl. Soft Comput., 2018