Seokgi Lee
Orcid: 0000-0002-8366-3584
According to our database1,
Seokgi Lee
authored at least 15 papers
between 2009 and 2024.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
Online presence:
-
on orcid.org
On csauthors.net:
Bibliography
2024
The production scheduling problem employing non-identical parallel machines with due dates considering carbon emissions and multiple types of energy sources.
Expert Syst. Appl., March, 2024
Crowdsourcing integration on the last mile delivery platform considering floating population data.
Expert Syst. Appl., 2024
Improving Robustness of Diffusion-Based Zero-Shot Speech Synthesis via Stable Formant Generation.
CoRR, 2024
2022
An electric forklift routing problem with battery charging and energy penalty constraints.
J. Intell. Manuf., 2022
Demurrage pattern analysis using logical analysis of data: A case study of the Ulsan Port Authority.
Expert Syst. Appl., 2022
A Hierarchical Deep Reinforcement Learning Approach for Outpatient Primary Care Scheduling.
Proceedings of the Winter Simulation Conference, 2022
2020
Minimizing total energy cost and tardiness penalty for a scheduling-layout problem in a flexible job shop system: A comparison of four metaheuristic algorithms.
Comput. Ind. Eng., 2020
2019
Comput. Ind. Eng., 2019
2016
2015
A Dynamic Algorithm for Distributed Feedback Control for Manufacturing Production, Capacity, and Maintenance.
IEEE Trans Autom. Sci. Eng., 2015
2014
Distributed Feedback Control for Production, Inventory, and CO2 Emissions in an Assemble-To-Order System.
Proceedings of the Service Orientation in Holonic and Multi-Agent Manufacturing and Robotics, 2014
Proceedings of the Advances in Production Management Systems. Innovative and Knowledge-Based Production Management in a Global-Local World, 2014
2013
Proceedings of the Winter Simulations Conference: Simulation Making Decisions in a Complex World, 2013
2010
Proceedings of the 2010 Winter Simulation Conference, 2010
2009
Distributed Arrival Time Control for Vehicle Routing Problems with Time Windows.
Proceedings of the ICINCO 2009, 2009