Salvador Perez Canto

According to our database1, Salvador Perez Canto authored at least 3 papers between 2008 and 2013.

Collaborative distances:
  • Dijkstra number2 of six.
  • Erdős number3 of six.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2013
A model for the preventive maintenance scheduling of power plants including wind farms.
Reliab. Eng. Syst. Saf., 2013

2011
A decomposition approach to the preventive maintenance scheduling problem: an empirical example for the Spanish power plant system.
Int. J. Manuf. Technol. Manag., 2011

2008
Application of Benders' decomposition to power plant preventive maintenance scheduling.
Eur. J. Oper. Res., 2008


  Loading...