Sadoullah Ebrahimnejad

Orcid: 0000-0003-4886-5348

According to our database1, Sadoullah Ebrahimnejad authored at least 21 papers between 2010 and 2023.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2023
Mathematical modeling of a competitive transportation-location arc routing problem.
Comput. Ind. Eng., August, 2023

2022
An optimized evacuation model with compatibility constraints in the context of disability: an ancient-inspired Giza Pyramids Construction metaheuristic approach.
Appl. Intell., 2022

2021
Development of an Input-Output Model Considering Simultaneous Effect of Risks in Infrastructure under Dynamic Conditions.
Reliab. Eng. Syst. Saf., 2021

Hybrid-EPC: an Emperor Penguins Colony algorithm with crossover and mutation operators and its application in community detection.
Prog. Artif. Intell., 2021

Optimization in solving inventory control problem using nature inspired Emperor Penguins Colony algorithm.
J. Intell. Manuf., 2021

Giza Pyramids Construction: an ancient-inspired metaheuristic algorithm for optimization.
Evol. Intell., 2021

2020
Optimizing a Neuro-Fuzzy System Based on Nature-Inspired Emperor Penguins Colony Optimization Algorithm.
IEEE Trans. Fuzzy Syst., 2020

Using Metaheuristic Algorithms to Improve k-Means Clustering: A Comparative Study.
Rev. d'Intelligence Artif., 2020

Robust operating room planning considering upstream and downstream units: A new two-stage heuristic algorithm.
Comput. Ind. Eng., 2020

A robust location-arc routing problem under uncertainty: mathematical model with lower and upper bounds.
Comput. Appl. Math., 2020

2019
Emperor Penguins Colony: a new metaheuristic algorithm for optimization.
Evol. Intell., 2019

A New Two-Stage Approach for a Bi-Objective Facility Layout Problem Considering Input/ Output Points Under Fuzzy Environment.
IEEE Access, 2019

2018
A bi-objective model of preventive maintenance planning in distributed systems considering vehicle routing problem.
Comput. Ind. Eng., 2018

Scheduling of elective patients considering upstream and downstream units and emergency demand using robust optimization.
Comput. Ind. Eng., 2018

2017
Selection of IT outsourcing services' activities considering services cost and risks by designing an interval-valued hesitant fuzzy-decision approach.
J. Intell. Fuzzy Syst., 2017

2016
A new multi-objective model for a capacitated hub covering problem solving by two multi-objective evolutionary algorithms.
Int. J. Math. Oper. Res., 2016

2015
The cross-entropy method for solving bi-criteria network flow problems in discrete-time dynamic networks.
Optim. Methods Softw., 2015

An Artificial Intelligence Model-Based Locally Linear Neuro-Fuzzy for Construction Project Selection.
J. Multiple Valued Log. Soft Comput., 2015

2014
Soft computing-based preference selection index method for human resource management.
J. Intell. Fuzzy Syst., 2014

Risk ranking in mega projects by fuzzy compromise approach: A comparative analysis.
J. Intell. Fuzzy Syst., 2014

2010
Risk identification and assessment for build-operate-transfer projects: A fuzzy multi attribute decision making model.
Expert Syst. Appl., 2010


  Loading...