S. Wali Haider

According to our database1, S. Wali Haider authored at least 4 papers between 1983 and 1996.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

1996
Primary production scheduling at steelmaking industries.
IBM J. Res. Dev., 1996

1989
Selecting simulation software for manufacturing applications.
Proceedings of the 21st Winter Simulation Conference, 1989

1986
Experiences with analytic and simulation modeling for a factory of the future project at IBM.
Proceedings of the 18th conference on Winter simulation, 1986

1983
A role for computer simulation in the economic analysis of manufacturing systems.
Proceedings of the 15th conference on Winter simulation, 1983


  Loading...