Ross J. W. James

Orcid: 0000-0002-4889-4854

According to our database1, Ross J. W. James authored at least 11 papers between 1997 and 2014.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2014
Entropy-Based Optimization of Nonlinear Separable Discrete Decision Models.
Manag. Sci., 2014

Fleet routing position-based model for inventory pickup under production shutdown.
Eur. J. Oper. Res., 2014

2011
Single and parallel machine capacitated lotsizing and scheduling: New iterative MIP-based neighborhood search heuristics.
Comput. Oper. Res., 2011

2009
A Knowledge Discovery Approach to Understanding Relationships between Scheduling Problem Structure and Heuristic Performance.
Proceedings of the Learning and Intelligent Optimization, Third International Conference, 2009

2007
Solving the Redundancy Allocation Problem With a Mix of Components Using the Improved Surrogate Constraint Method.
IEEE Trans. Reliab., 2007

2005
Techniques for solving subset sum problems within a given tolerance.
Int. Trans. Oper. Res., 2005

Enumeration Methods for Repeatedly Solving Multidimensional Knapsack Sub-Problems.
IEICE Trans. Inf. Syst., 2005

An approach for solving nonlinear multi-objective separable discrete optimization problem with one constraint.
Eur. J. Oper. Res., 2005

1998
Performance enhancements to tabu search for the early/tardy scheduling problem.
Eur. J. Oper. Res., 1998

Robustness of single machine scheduling problems to earliness and tardiness penalty errors.
Ann. Oper. Res., 1998

1997
Using tabu search to solve the common due date early/tardy machine scheduling problem.
Comput. Oper. Res., 1997


  Loading...