Robert C. Leachman

According to our database1, Robert C. Leachman authored at least 14 papers between 1988 and 2016.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2016
The engineering of speed and delivery.
Proceedings of the Winter Simulation Conference, 2016

2014
An automated planning engine for biopharmaceutical production.
Eur. J. Oper. Res., 2014

2011
Excursion Yield Loss and Cycle Time Reduction in Semiconductor Manufacturing.
IEEE Trans Autom. Sci. Eng., 2011

2010
Coordinated Multistage Scheduling of Parallel Batch-Processing Machines Under Multiresource Constraints.
Oper. Res., 2010

2008
Coordinating decentralized local schedulers in complex supply chain manufacturing.
Ann. Oper. Res., 2008

2007
Economic Efficiency Analysis of Wafer Fabrication.
IEEE Trans Autom. Sci. Eng., 2007

2004
Modeling train movements through complex rail networks.
ACM Trans. Model. Comput. Simul., 2004

2002
Special Issue: Franz Edelman Award for Achievement in Operations Research and the Management Sciences: SLIM: Short Cycle Time and Low Inventory in Manufacturing at Samsung Electronics.
Interfaces, 2002

Modeling very large scale systems: using simulation modeling to assess rail track infrastructure in densely trafficked metropolitan areas.
Proceedings of the 34th Winter Simulation Conference: Exploring New Frontiers, 2002

1998
A hybrid heuristic and linear programming approach to multi-product machine scheduling.
Eur. J. Oper. Res., 1998

1995
A Simulation Modeling Methodology for Analyzing Large Complex Rail Networks.
Simul., 1995

1989
An aggregate model of project-oriented production.
IEEE Trans. Syst. Man Cybern., 1989

1988
Predicting Dispatching Delays on a Low Speed, Single Track Railroad.
Transp. Sci., 1988

A Dynamic Programming Solution to the Dynamic, Multi-Item, Single-Machine Scheduling Problem.
Oper. Res., 1988


  Loading...