Richard L. Daniels

According to our database1, Richard L. Daniels authored at least 10 papers between 1989 and 2006.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2006
Simultaneously determining the mix of space launch vehicles and the assignment of satellites to rockets.
Eur. J. Oper. Res., 2006

2004
Flow Shop Scheduling with Partial Resource Flexibility.
Manag. Sci., 2004

2003
A survey of manufacturing flexibility: Implications for e-business flexibility.
IBM Syst. J., 2003

1999
Heuristics for parallel-machine flexible-resource scheduling problems with unspecified job assignment.
Comput. Oper. Res., 1999

1998
A model for warehouse order picking.
Eur. J. Oper. Res., 1998

1997
An analysis of heuristics for the parallel-machine flexible-resource scheduling problem.
Ann. Oper. Res., 1997

1996
Using profit maximizing scheduling models to structure operational trade-offs and manufacturing strategy issues.
J. Glob. Optim., 1996

1994
Flow Shop Scheduling with Resource Flexibility.
Oper. Res., 1994

1993
A tabu-search heuristic for the flexible-resource flow shop scheduling problem.
Ann. Oper. Res., 1993

1989
Technical Note - Single Machine Scheduling with Controllable Processing Times and Number of Jobs Tardy.
Oper. Res., 1989


  Loading...