Reza Tavakkoli-Moghaddam
Orcid: 0000-0002-6757-926XAffiliations:
- University of Tehran, Iran
According to our database1,
Reza Tavakkoli-Moghaddam
authored at least 309 papers
between 2005 and 2024.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
Online presence:
-
on zbmath.org
-
on scopus.com
-
on orcid.org
On csauthors.net:
Bibliography
2024
Solving a new mathematical model for the integrated cockpit crew pairing and rostering problem by meta-heuristic algorithms under the COVID-19 pandemic.
J. Oper. Res. Soc., August, 2024
On the availability and changeover cases of the general lot-sizing and scheduling problem with maintenance modelling: a Lagrangian-based heuristic approach.
Oper. Res., June, 2024
Production scheduling in a reconfigurable manufacturing system benefiting from human-robot collaboration.
Int. J. Prod. Res., February, 2024
An integrated approach for evaluating and improving the performance of hospital ICUs based on ergonomic and work-motivational factors.
Comput. Biol. Medicine, January, 2024
Int. J. Prod. Res., 2024
An integrated lot-sizing and scheduling problem in a reconfigurable manufacturing system under workforce constraints.
Int. J. Prod. Res., 2024
Expert Syst. Appl., 2024
Lagrangian relaxation method for solving a new time-dependent production-distribution planning model.
Expert Syst. Appl., 2024
A hybrid machine learning model based on ensemble methods for devices fault prediction in the wood industry.
Expert Syst. Appl., 2024
Optimizing COVID-19 medical waste management using goal and robust possibilistic programming.
Eng. Appl. Artif. Intell., 2024
Designing a two-stage model for a sustainable closed-loop electric vehicle battery supply chain network: A scenario-based stochastic programming approach.
Comput. Ind. Eng., 2024
An AUGMECON2VIKOR Algorithm for a Multi-objective Model in a Sustainable Manufacturing System Under Reliable Constraints.
Proceedings of the Advances in Production Management Systems. Production Management Systems for Volatile, Uncertain, Complex, and Ambiguous Environments, 2024
Designing a New Dry Port-Seaport Logistics Network with a Focus on Industry 5.0 by Machine Learning.
Proceedings of the Advances in Production Management Systems. Production Management Systems for Volatile, Uncertain, Complex, and Ambiguous Environments, 2024
Analysis of Critical Success Factors of Sustainable and Resilient Aioe-based Supply Chain in Industry 5.0.
Proceedings of the Advances in Production Management Systems. Production Management Systems for Volatile, Uncertain, Complex, and Ambiguous Environments, 2024
A Flexible Job Shop Scheduling Problem Involving Reconfigurable Machine Tools Under Industry 5.0.
Proceedings of the Advances in Production Management Systems. Production Management Systems for Volatile, Uncertain, Complex, and Ambiguous Environments, 2024
2023
A discrete time/resource trade-off problem with a critical chain method under uncertainty: a hybrid meta-heuristic algorithm.
Soft Comput., December, 2023
An integrated chance-constrained stochastic model for a preemptive multi-skilled multi-mode resource-constrained project scheduling problem: A case study of building a sports center.
Eng. Appl. Artif. Intell., November, 2023
Disruption-resilient supply chain entities with decentralized robust-stochastic capacity planning.
Reliab. Eng. Syst. Saf., October, 2023
Dynamic opportunistic maintenance grouping in a lot streaming based job-shop scheduling problem.
Comput. Ind. Eng., September, 2023
A customized multi-neighborhood search algorithm using the tabu list for a sustainable closed-loop supply chain network under uncertainty.
Appl. Soft Comput., September, 2023
Two new feature selection methods based on learn-heuristic techniques for breast cancer prediction: a comprehensive analysis.
Ann. Oper. Res., September, 2023
Solving a new bi-objective mathematical model for a hybrid flow shop scheduling problem with robots and fuzzy maintenance time.
Comput. Ind. Eng., August, 2023
Comput. Ind. Eng., August, 2023
A holistic, integrated supply-production-distribution problem in the dairy industry under uncertain supply and demand.
Comput. Ind. Eng., July, 2023
Integrated configuration design and capacity planning in a dynamic cloud manufacturing system.
Int. J. Prod. Res., May, 2023
A competitive pharmaceutical supply chain under the marketing mix strategies and product life cycle with a fuzzy stochastic demand.
Ann. Oper. Res., May, 2023
Solving a hub location-routing problem with a queue system under social responsibility by a fuzzy meta-heuristic algorithm.
Ann. Oper. Res., May, 2023
A systems approach to improve reliability of a contract by Modularising contract's information flow architecture: a new contribution to risk mitigation in projects management.
Enterp. Inf. Syst., April, 2023
A chance-constraint optimization model for a multi-echelon multi-product closed-loop supply chain considering brand diversity: An accelerated Benders decomposition algorithm.
Comput. Oper. Res., April, 2023
Int. J. Prod. Res., March, 2023
A bi-objective home care routing and scheduling problem considering patient preference and soft temporal dependency constraints.
Eng. Appl. Artif. Intell., March, 2023
Bi-objective collaborative electric vehicle routing problem: mathematical modeling and matheuristic approach.
J. Ambient Intell. Humaniz. Comput., 2023
Breast cancer classification by a new approach to assessing deep neural network-based uncertainty quantification methods.
Biomed. Signal Process. Control., 2023
Artificial Intelligence of Things (AIoT) Strategies for a Smart Sustainable-Resilient Supply Chain.
Proceedings of the Advances in Production Management Systems. Production Management Systems for Responsible Manufacturing, Service, and Logistics Futures, 2023
A Constraint Programming Model for a Reconfigurable Job Shop Scheduling Problem with Machine Availability.
Proceedings of the Advances in Production Management Systems. Production Management Systems for Responsible Manufacturing, Service, and Logistics Futures, 2023
2022
A multi-objective optimization framework for a sustainable closed-loop supply chain network in the olive industry: Hybrid meta-heuristic algorithms.
Expert Syst. Appl., October, 2022
Mathematical modeling of a bi-objective hub location-routing problem for rapid transit networks.
RAIRO Oper. Res., September, 2022
A latency-aware task scheduling algorithm for allocating virtual machines in a cost-effective and time-sensitive fog-cloud architecture.
J. Supercomput., 2022
A heuristic-based simulated annealing algorithm for the scheduling of relief teams in natural disasters.
Soft Comput., 2022
Redesigning a supply chain network with system disruption using Lagrangian relaxation: a real case study.
Soft Comput., 2022
Solving a new bi-objective multi-echelon supply chain problem with a Jackson open-network issue under uncertainty.
Soft Comput., 2022
A new robust optimization model for relief logistics planning under uncertainty: a real-case study.
Soft Comput., 2022
Search in forest optimizer: a bioinspired metaheuristic algorithm for global optimization problems.
Soft Comput., 2022
A decision support model for robust allocation and routing of search and rescue resources after earthquake: a case study.
Oper. Res., 2022
Optimization of a television advertisement scheduling problem by multi-criteria decision making and dispatching rules.
Multim. Tools Appl., 2022
Simulation of the COVID-19 patient flow and investigation of the future patient arrival using a time-series prediction model: a real-case study.
Medical Biol. Eng. Comput., 2022
Prioritizing the glucose-lowering medicines for type 2 diabetes by an extended fuzzy decision-making approach with target-based attributes.
Medical Biol. Eng. Comput., 2022
A new technology acceptance model: a mixed-method of grounded theory and system dynamics.
Kybernetes, 2022
Sustainable facility relocation in agriculture systems using the GIS and best-worst method.
Kybernetes, 2022
J. Ind. Inf. Integr., 2022
Developing an integrated model for planning the delivery of construction materials to post-disaster reconstruction projects.
J. Comput. Des. Eng., 2022
A multi-verse optimizer algorithm for ambulance repositioning in emergency medical service systems.
J. Ambient Intell. Humaniz. Comput., 2022
An extended ϵ-constraint method for a multiobjective finite-horizon Markov decision process.
Int. Trans. Oper. Res., 2022
A hybrid learning-based meta-heuristic algorithm for scheduling of an additive manufacturing system consisting of parallel SLM machines.
Int. J. Prod. Res., 2022
Distributed job-shop rescheduling problem considering reconfigurability of machines: a self-adaptive hybrid equilibrium optimiser.
Int. J. Prod. Res., 2022
Integrated production-inventory-routing problem for multi-perishable products under uncertainty by meta-heuristic algorithms.
Int. J. Prod. Res., 2022
A new fuzzy tri-objective model for a home health care problem with green ambulance routing and congestion under uncertainty.
Expert Syst. Appl., 2022
Sustainable negotiation-based nesting and scheduling in additive manufacturing systems: A case study and multi-objective meta-heuristic algorithms.
Eng. Appl. Artif. Intell., 2022
Dynamic routing-scheduling problem for home health care considering caregiver-patient compatibility.
Comput. Oper. Res., 2022
Competitive facility location problem with foresight considering discrete-nature attractiveness for facilities: Model and solution.
Comput. Oper. Res., 2022
An intelligent algorithm to evaluate and improve the performance of a home healthcare center considering trust indicators.
Comput. Biol. Medicine, 2022
Performance assessment and improvement of a care unit for COVID-19 patients with resilience engineering and motivational factors: An artificial neural network method.
Comput. Biol. Medicine, 2022
An integrated approach for evaluating and improving the performance of surgical theaters with resilience engineering.
Comput. Biol. Medicine, 2022
Solving a parallel-line capacitated lot-sizing and scheduling problem with sequence-dependent setup time/cost and preventive maintenance by a rolling horizon method.
Comput. Ind. Eng., 2022
Designing a clinical decision support system for Alzheimer's diagnosis on OASIS-3 data set.
Biomed. Signal Process. Control., 2022
A centroid opposition-based coral reefs algorithm for solving an automated guided vehicle routing problem with a recharging constraint.
Appl. Soft Comput., 2022
An integrative location-allocation model for humanitarian logistics with distributive injustice and dissatisfaction under uncertainty.
Ann. Oper. Res., 2022
Designing a sustainable closed-loop pharmaceutical supply chain in a competitive market considering demand uncertainty, manufacturer's brand and waste management.
Ann. Oper. Res., 2022
A Mathematical Model for Dynamic Scheduling of Production and Maintenance Activities in a Flexible Job-Shop System.
Proceedings of the 6th International Conference on System Reliability and Safety, 2022
2021
Determining the price and refund of products in a supply chain with quality and advertising costs in a fuzzy environment.
Soft Comput., 2021
A mathematical model to design dynamic cellular manufacturing systems in multiple plants with production planning and location-allocation decisions.
Soft Comput., 2021
A simulation-optimization algorithm for return strategies in emergency medical systems.
Simul., 2021
Integration of parts scheduling, MRP, production planning and generalized fixed-charge transportation planning in the design of a dynamic cellular manufacturing system.
RAIRO Oper. Res., 2021
Scheduling Piecewise Linear Deteriorating Jobs to Minimize Makespan in a Two-Machine Flowshop.
Oper. Res. Forum, 2021
A combinatorial auction-based approach for ridesharing in a student transportation system.
Networks, 2021
J. Ind. Inf. Integr., 2021
Incorporating order acceptance, pricing and equity considerations in the scheduling of cloud manufacturing systems: matheuristic methods.
Int. J. Prod. Res., 2021
Competitive green supply chain network design model considering inventory decisions under uncertainty: a real case of a filter company.
Int. J. Prod. Res., 2021
Simultaneous waterway scheduling, berth allocation, and quay crane assignment: A novel matheuristic approach.
Int. J. Prod. Res., 2021
A robust home health care routing-scheduling problem with temporal dependencies under uncertainty.
Expert Syst. Appl., 2021
A hybrid of clustering and meta-heuristic algorithms to solve a <i>p</i>-mobile hub location-allocation problem with the depreciation cost of hub facilities.
Eng. Appl. Artif. Intell., 2021
Designing a sustainable-resilient disaster waste management system under hybrid uncertainty: A case study.
Eng. Appl. Artif. Intell., 2021
Solving a new robust reverse job shop scheduling problem by meta-heuristic algorithms.
Eng. Appl. Artif. Intell., 2021
A hybrid Z-number data envelopment analysis and neural network for assessment of supply chain resilience: a case study.
Central Eur. J. Oper. Res., 2021
Bi-objective build-to-order supply chain network design under uncertainty and time-dependent demand: An automobile case study.
Comput. Ind. Eng., 2021
A routing and scheduling problem for cross-docking networks with perishable products, heterogeneous vehicles and split delivery.
Comput. Ind. Eng., 2021
Hybridization of an interactive fuzzy methodology with a lexicographic min-max approach for optimizing a multi-period multi-product multi-echelon sustainable closed-loop supply chain network.
Comput. Ind. Eng., 2021
A new bi-objective model of the urban public transportation hub network design under uncertainty.
Ann. Oper. Res., 2021
Two hybrid <i>meta</i>-heuristic algorithms for a dual-channel closed-loop supply chain network design problem in the tire industry under uncertainty.
Adv. Eng. Informatics, 2021
Proceedings of the Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, 2021
Scheduling of Parallel 3D-Printing Machines with Incompatible Job Families: A Matheuristic Algorithm.
Proceedings of the Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, 2021
Integrated Workforce Allocation and Scheduling in a Reconfigurable Manufacturing System Considering Cloud Manufacturing.
Proceedings of the Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, 2021
Sustainable Facility Location-Routing Problem for Blood Package Delivery by Drones with a Charging Station.
Proceedings of the Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, 2021
2020
Two calibrated meta-heuristics to solve an integrated scheduling problem of production and air transportation with the interval due date.
Soft Comput., 2020
Int. J. Syst. Assur. Eng. Manag., 2020
Mixed-integer linear programming model for tree-like pipeline scheduling problem with intermediate due dates on demands.
Oper. Res., 2020
A hybrid intelligent algorithm for a fuzzy multi-objective job shop scheduling problem with reentrant workflows and parallel machines.
J. Intell. Fuzzy Syst., 2020
A novel FMEA model based on fuzzy multiple-criteria decision-making methods for risk assessment.
J. Enterp. Inf. Manag., 2020
Scheduling of human-robot collaboration in assembly of printed circuit boards: a constraint programming approach.
Int. J. Comput. Integr. Manuf., 2020
Reliable blood supply chain network design with facility disruption: A real-world application.
Eng. Appl. Artif. Intell., 2020
Performance Analysis of Meta-heuristic Algorithms for a Quadratic Assignment Problem.
CoRR, 2020
A multi-modal competitive hub location pricing problem with customer loyalty and elastic demand.
Comput. Oper. Res., 2020
Multiobjective fuzzy mathematical model for a financially constrained closed-loop supply chain with labor employment.
Comput. Intell., 2020
A new bi-objective vehicle routing-scheduling problem with cross-docking: Mathematical model and algorithms.
Comput. Ind. Eng., 2020
A robust location-arc routing problem under uncertainty: mathematical model with lower and upper bounds.
Comput. Appl. Math., 2020
Flexible job shop scheduling problem with reconfigurable machine tools: An improved differential evolution algorithm.
Appl. Soft Comput., 2020
A new weighted distance-based approximation methodology for flow shop scheduling group decisions under the interval-valued fuzzy processing time.
Appl. Soft Comput., 2020
A School Bus Routing and Scheduling Problem with Time Windows and Possibility of Outsourcing with the Provided Service Quality.
Proceedings of the Intelligent Systems Design and Applications, 2020
A Bi-objective Scheduling Model for Additive Manufacturing with Multiple Materials and Sequence-Dependent Setup Time.
Proceedings of the Advances in Production Management Systems. Towards Smart and Digital Manufacturing, 2020
A New Application of Coordination Contracts for Supplier Selection in a Cloud Environment.
Proceedings of the Advances in Production Management Systems. Towards Smart and Digital Manufacturing, 2020
Dynamic Distributed Job-Shop Scheduling Problem Consisting of Reconfigurable Machine Tools.
Proceedings of the Advances in Production Management Systems. Towards Smart and Digital Manufacturing, 2020
An Improvement in Master Surgical Scheduling Using Artificial Neural Network and Fuzzy Programming Approach.
Proceedings of the Advances in Production Management Systems. Towards Smart and Digital Manufacturing, 2020
Multi-objective Optimization for Mixed-model Assembly Line Sequencing and Balancing in the Context of Industry 4.0.
Proceedings of the IEEE International Conference on Industrial Engineering and Engineering Management, 2020
2019
Forward and reverse flows pricing decisions for two competing supply chains with common collection centers in an intuitionistic fuzzy environment.
Soft Comput., 2019
A new comprehensive possibilistic group decision approach for resilient supplier selection with mean-variance-skewness-kurtosis and asymmetric information under interval-valued fuzzy uncertainty.
Neural Comput. Appl., 2019
A multi-objective model for the closed-loop supply chain network design with a price-dependent demand, shortage and disruption.
J. Intell. Fuzzy Syst., 2019
An interval-valued fuzzy statistical group decision making approach with new evaluating indices for sustainable supplier selection problem.
J. Intell. Fuzzy Syst., 2019
A robust approach for a green periodic competitive VRP under uncertainty: DE and PSO algorithms.
J. Intell. Fuzzy Syst., 2019
Int. Trans. Oper. Res., 2019
Int. J. Syst. Syst. Eng., 2019
A trade-off between productivity and cost for the integrated part quality inspection and preventive maintenance planning under uncertainty.
Int. J. Prod. Res., 2019
A review on optimisation of part quality inspection planning in a multi-stage manufacturing system.
Int. J. Prod. Res., 2019
An Improved Artificial Intelligence Based on Gray Wolf Optimization and Cultural Algorithm to Predict Demand for Dairy Products: A Case Study.
Int. J. Interact. Multim. Artif. Intell., 2019
A new robust-possibilistic reliable hub protection model with elastic demands and backup hubs under risk.
Eng. Appl. Artif. Intell., 2019
Solving a new bi-objective hierarchical hub location problem with an M∕M∕c queuing framework.
Eng. Appl. Artif. Intell., 2019
A two-stage approach to agile pharmaceutical supply chain management with product substitutability in crises.
Comput. Chem. Eng., 2019
Multi-objective mathematical modeling for sustainable supply chain management in the paper industry.
Comput. Ind. Eng., 2019
Extending the solid step fixed-charge transportation problem to consider two-stage networks and multi-item shipments.
Comput. Ind. Eng., 2019
Find-Fix-Finish-Exploit-Analyze (F3EA) meta-heuristic algorithm: An effective algorithm with new evolutionary operators for global optimization.
Comput. Ind. Eng., 2019
Hybrid artificial intelligence and robust optimization for a multi-objective product portfolio problem Case study: The dairy products industry.
Comput. Ind. Eng., 2019
Modified variable neighborhood search and genetic algorithm for profitable heterogeneous vehicle routing problem with cross-docking.
Appl. Soft Comput., 2019
Proceedings of the Optimization of Complex Systems: Theory, 2019
A Goal Programming Approach for a Fuzzy Single-Source Capacitated Facility Location Problem.
Proceedings of the 2019 IEEE International Conference on Industrial Engineering and Engineering Management, 2019
Proceedings of the 2019 IEEE International Conference on Industrial Engineering and Engineering Management, 2019
2018
A novel group decision model based on mean-variance-skewness concepts and interval-valued fuzzy sets for a selection problem of the sustainable warehouse location under uncertainty.
Neural Comput. Appl., 2018
J. Stat. Theory Appl., 2018
Modeling truck scheduling problem at a cross-dock facility through a bi-objective bi-level optimization approach.
J. Intell. Manuf., 2018
Multi-objective interior search algorithm for optimization: A new multi-objective meta-heuristic algorithm.
J. Intell. Fuzzy Syst., 2018
An integrated cellular manufacturing system with type-2 fuzzy variables: Three tuned meta-heuristic algorithms.
J. Intell. Fuzzy Syst., 2018
Design of a pharmaceutical supply chain network under uncertainty considering perishability and substitutability of products.
Inf. Sci., 2018
A bi-objective robust inspection planning model in a multi-stage serial production system.
Int. J. Prod. Res., 2018
Designing and optimizing a sustainable supply chain network for a blood platelet bank under uncertainty.
Eng. Appl. Artif. Intell., 2018
An accelerated Benders decomposition algorithm for reliable facility location problems in multi-echelon networks.
Comput. Ind. Eng., 2018
Pharmacological therapy selection of type 2 diabetes based on the SWARA and modified MULTIMOORA methods under a fuzzy environment.
Artif. Intell. Medicine, 2018
Location-Pricing Problem in the Closed-Loop Supply Chain Network Design Under Uncertainty.
Proceedings of the Service Orientation in Holonic and Multi-Agent Manufacturing, 2018
Sustainable Design for a Bi-level Transportation-Location-Vehicle Routing Scheduling Problem in a Perishable Product Supply Chain.
Proceedings of the Service Orientation in Holonic and Multi-Agent Manufacturing, 2018
A New Approach to Integrate Resilience Engineering and Business Process Reengineering Design.
Proceedings of the 2018 IEEE International Conference on Industrial Engineering and Engineering Management, 2018
A Bi-objective Credibility-based Fuzzy Mathematical Programming Model for a Healthcare Facility Location-network Design Problem.
Proceedings of the 2018 IEEE International Conference on Industrial Engineering and Engineering Management, 2018
Performance Evaluation with a Z-number Data Envelopment Analysis: A Case Study of a Petrochemical Plant.
Proceedings of the 2018 IEEE International Conference on Industrial Engineering and Engineering Management, 2018
Proceedings of the 2018 IEEE International Conference on Industrial Engineering and Engineering Management, 2018
2017
A mathematical model for assessing the effects of a lot splitting feature on a dynamic cellular manufacturing system.
Prod. Eng., 2017
Modified particle swarm optimization in a time-dependent vehicle routing problem: minimizing fuel consumption.
Optim. Lett., 2017
A novel multi-stage possibilistic stochastic programming approach (with an application in relief distribution planning).
Inf. Sci., 2017
Int. J. Prod. Res., 2017
Int. J. Math. Oper. Res., 2017
A new enhanced support vector model based on general variable neighborhood search algorithm for supplier performance evaluation: A case study.
Int. J. Comput. Intell. Syst., 2017
A multi-objective imperialist competitive algorithm for integrating intra-cell layout and processing route reliability in a cellular manufacturing system.
Int. J. Comput. Integr. Manuf., 2017
Int. J. Comput. Integr. Manuf., 2017
Design of a reliable multi-modal multi-commodity model for hazardous materials transportation under uncertainty.
Eur. J. Oper. Res., 2017
Solving a fuzzy fixed charge solid transportation problem using batch transferring by new approaches in meta-heuristic.
Electron. Notes Discret. Math., 2017
A self-adaptive evolutionary algorithm for a fuzzy multi-objective hub location problem: An integration of responsiveness and social responsibility.
Eng. Appl. Artif. Intell., 2017
A Two-Phase Safe Vehicle Routing and Scheduling Problem: Formulations and Solution Algorithms.
CoRR, 2017
Solving a bi-objective unrelated parallel batch processing machines scheduling problem: A comparison study.
Comput. Oper. Res., 2017
A Benders' decomposition algorithm for optimizing distribution of perishable products considering postharvest biological behavior in agri-food supply chain: a case study of tomato.
Central Eur. J. Oper. Res., 2017
Designing a Reliable Multi-Objective Queuing Model of a Petrochemical Supply Chain Network under Uncertainty: A Case Study.
Comput. Chem. Eng., 2017
A tri-level r-interdiction median model for a facility location problem under imminent attack.
Comput. Ind. Eng., 2017
An interactive possibilistic programming approach for a multi-objective hub location problem: Economic and environmental design.
Appl. Soft Comput., 2017
2016
An MCDA-DEA approach for mixed-model assembly line balancing problem under uncertainty.
J. Intell. Fuzzy Syst., 2016
Optimization of a multi-modal tree hub location network with transportation energy consumption: A fuzzy approach.
J. Intell. Fuzzy Syst., 2016
J. Intell. Fuzzy Syst., 2016
A new multi-objective model for a capacitated hub covering problem solving by two multi-objective evolutionary algorithms.
Int. J. Math. Oper. Res., 2016
Multi-objective multi-product multi-site aggregate production planning in a supply chain under uncertainty: fuzzy multi-objective optimisation.
Int. J. Comput. Integr. Manuf., 2016
Eng. Appl. Artif. Intell., 2016
Comput. Oper. Res., 2016
Designing a fuzzy Q-learning multi-agent quality control system for a continuous chemical production line - A case study.
Comput. Ind. Eng., 2016
An interactive approach for designing a robust disaster relief logistics network with perishable commodities.
Comput. Ind. Eng., 2016
A bi-objective truck scheduling problem in a cross-docking center with probability of breakdown for trucks.
Comput. Ind. Eng., 2016
Two meta-heuristics to solve a coordinated air transportation and production scheduling problem with time windows for the due date.
Proceedings of the 2016 IEEE International Conference on Systems, Man, and Cybernetics, 2016
2015
Optimizing a vendor managed inventory (VMI) model considering delivering cost in a three-echelon supply chain using two tuned-parameter meta-heuristics.
Int. J. Syst. Assur. Eng. Manag., 2015
Lead time and ordering cost reductions in budget and storage space restricted probabilistic inventory models with imperfect items.
RAIRO Oper. Res., 2015
A hybrid fuzzy approach for the closed-loop supply chain network design under uncertainty.
J. Intell. Fuzzy Syst., 2015
Solving a novel multi-objective uncapacitated hub location problemby five meta-heuristics.
J. Intell. Fuzzy Syst., 2015
An artificial bee colony algorithm for a two-stage hybrid flowshop scheduling problem with multilevel product structures and requirement operations.
Int. J. Comput. Integr. Manuf., 2015
A credibility-constrained programming for reliable forward-reverse logistics network design under uncertainty and facility disruptions.
Int. J. Comput. Integr. Manuf., 2015
A stochastic approach for a novel p-hub location-allocation problem with opening and reopening modes.
Int. J. Bus. Perform. Supply Chain Model., 2015
An intuitionistic fuzzy grey model for selection problems with an application to the inspection planning in manufacturing firms.
Eng. Appl. Artif. Intell., 2015
Comput. Ind. Eng., 2015
Comprehensive fuzzy multi-objective multi-product multi-site aggregate production planning decisions in a supply chain under uncertainty.
Appl. Soft Comput., 2015
Robust and fuzzy goal programming optimization approaches for a novel multi-objective hub location-allocation problem: A supply chain overview.
Appl. Soft Comput., 2015
A new multi-objective scheduling problem on batch parallel machines with maximum allowable incompatibility for jobs.
Proceedings of the 2015 IEEE International Conference on Industrial Engineering and Engineering Management, 2015
Proceedings of the Outlooks and Insights on Group Decision and Negotiation, 2015
A Multi-criteria Group Decision-Making Approach for Facility Location Selection Using PROMETHEE Under a Fuzzy Environment.
Proceedings of the Outlooks and Insights on Group Decision and Negotiation, 2015
Redundancy Resource Allocation for Reliable Project Scheduling: A Game-theoretical Approach.
Proceedings of the Conference on ENTERprise Information Systems/International Conference on Project MANagement/Conference on Health and Social Care Information Systems and Technologies, 2015
2014
A new method for trapezoidal fuzzy numbers ranking based on the Shadow length and its application to manager's risk taking.
J. Intell. Fuzzy Syst., 2014
J. Intell. Fuzzy Syst., 2014
J. Intell. Fuzzy Syst., 2014
A multi-objective vehicle routing and scheduling problem with uncertainty in customers' request and priority.
J. Comb. Optim., 2014
An interactive possibilistic programming approach for a multi-objective closed-loop supply chain network under uncertainty.
Int. J. Syst. Sci., 2014
Soft computing based on a fuzzy grey group compromise solution approach with an application to the selection problem of material handling equipment.
Int. J. Comput. Integr. Manuf., 2014
A hybrid electromagnetism-like algorithm for dynamic inter/intra-cell layout problem.
Int. J. Comput. Integr. Manuf., 2014
Solving a new multi-objective hybrid flexible flowshop problem with limited waiting times and machine-sequence-dependent set-up time constraints.
Int. J. Comput. Integr. Manuf., 2014
A robust possibilistic programming approach to multi-period location-allocation of organ transplant centers under uncertainty.
Comput. Ind. Eng., 2014
An approach for modeling a new single machine scheduling problem with deteriorating and learning effects.
Comput. Ind. Eng., 2014
Solving a new bi-objective location-routing-inventory problem in a distribution network by meta-heuristics.
Comput. Ind. Eng., 2014
Comput. Ind. Eng., 2014
A multi-objective dynamic vehicle routing problem with fuzzy time windows: Model, solution and application.
Appl. Soft Comput., 2014
Interval programming for the redundancy allocation with choices of redundancy strategy and component type under uncertainty: Erlang time to failure distribution.
Appl. Math. Comput., 2014
A multi-objective imperialist competitive algorithm to solve a new multi-modal tree hub location problem.
Proceedings of the 2014 Sixth World Congress on Nature and Biologically Inspired Computing, 2014
Design of a dynamic bi-objective relief routing network in the earthquake response phase.
Proceedings of the 2014 IEEE International Conference on Industrial Engineering and Engineering Management, 2014
2013
Multiobjective Dynamic Vehicle Routing Problem With Fuzzy Travel Times and Customers' Satisfaction in Supply Chain Management.
IEEE Trans. Engineering Management, 2013
Math. Comput. Model., 2013
An imperialist competitive algorithm for multi-objective U-type assembly line design.
J. Comput. Sci., 2013
A fuzzy grey model based on the compromise ranking for multi-criteria group decision making problems in manufacturing systems.
J. Intell. Fuzzy Syst., 2013
A new compromise solution method for fuzzy group decision-making problems with an application to the contractor selection.
Eng. Appl. Artif. Intell., 2013
A hybrid multi-objective approach based on the genetic algorithm and neural network to design an incremental cellular manufacturing system.
Comput. Ind. Eng., 2013
Soft computing based on new interval-valued fuzzy modified multi-criteria decision-making method.
Appl. Soft Comput., 2013
A genetic algorithm using priority-based encoding with new operators for fixed charge transportation problems.
Appl. Soft Comput., 2013
Appl. Soft Comput., 2013
A Hybrid Simulated Annealing Algorithm for Location of Cross-Docking Centers in a Supply Chain.
Proceedings of the Hybrid Metaheuristics - 8th International Workshop, 2013
2012
J. Intell. Manuf., 2012
J. Intell. Manuf., 2012
A cell formation problem considering machine utilization and alternative process routes by scatter search.
J. Intell. Manuf., 2012
J. Intell. Manuf., 2012
Expert Syst. Appl., 2012
Solving a periodic single-track train timetabling problem by an efficient hybrid algorithm.
Eng. Appl. Artif. Intell., 2012
Solving a group layout design model of a dynamic cellular manufacturing system with alternative process routings, lot splitting and flexible reconfiguration by simulated annealing.
Comput. Oper. Res., 2012
Appl. Soft Comput., 2012
Annealing-based particle swarm optimization to solve the redundant reliability problem with multiple component choices.
Appl. Soft Comput., 2012
2011
An integrated artificial neural network-computer simulation for optimization of complex tandem queue systems.
Math. Comput. Simul., 2011
A new hybrid multi-objective Pareto archive PSO algorithm for a bi-objective job shop scheduling problem.
Expert Syst. Appl., 2011
Solving a multi-objective open shop scheduling problem by a novel hybrid ant colony optimization.
Expert Syst. Appl., 2011
Expert Syst. Appl., 2011
Solving a capacitated fixed-charge transportation problem by artificial immune and genetic algorithms with a Prüfer number representation.
Expert Syst. Appl., 2011
The use of multi-criteria data envelopment analysis (MCDEA) for location-allocation problems in a fuzzy environment.
Expert Syst. Appl., 2011
The use of a genetic algorithm for clustering the weighing station performance in transportation - A case study.
Expert Syst. Appl., 2011
A hybridization of simulated annealing and electromagnetism-like mechanism for a periodic job shop scheduling problem.
Expert Syst. Appl., 2011
An integrated Data Envelopment Analysis-Artificial Neural Network-Rough Set Algorithm for assessment of personnel efficiency.
Expert Syst. Appl., 2011
Eur. J. Oper. Res., 2011
A hybrid approach based on the genetic algorithm and neural network to design an incremental cellular manufacturing system.
Appl. Soft Comput., 2011
Solving a bi-objective flowshop scheduling problem by a Multi-objective Immune System and comparing with SPEA2+ and SPGA.
Adv. Eng. Softw., 2011
A simulated annealing for solving a group layout design model of a dynamic cellular manufacturing system.
Proceedings of the 2011 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 2011
A multi-period facility location-relocation problem in the presence of a probabilistic line barrier.
Proceedings of the 2011 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 2011
A multi-objective identical parallel machine scheduling with setup and removal times with deteriorating and learning effects.
Proceedings of the 2011 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 2011
Selection of distribution centers with the time value of money and the loyal customer effect.
Proceedings of the 2011 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 2011
2010
Electromagnetism-like mechanism and simulated annealing algorithms for flowshop scheduling problems minimizing the total weighted tardiness and makespan.
Knowl. Based Syst., 2010
Design of a scatter search method for a novel multi-criteria group scheduling problem in a cellular manufacturing system.
Expert Syst. Appl., 2010
Addressing a nonlinear fixed-charge transportation problem using a spanning tree-based genetic algorithm.
Comput. Ind. Eng., 2010
The use of a fuzzy multi-objective linear programming for solving a multi-objective single-machine scheduling problem.
Appl. Soft Comput., 2010
Solving multi-objective optimization formulation for fleet planning in a railway industry.
Ann. Oper. Res., 2010
Multi-objective Particle Swarm Optimization for Sequencing and Scheduling a Cellular Manufacturing System.
Proceedings of the Advanced Intelligent Computing Theories and Applications, 2010
A New Hybrid Multi-objective Pareto Archive PSO Algorithm for a Classic Job Shop Scheduling Problem with Ready Times.
Proceedings of the Advanced Intelligent Computing Theories and Applications, 2010
Imperialistic Competitive Algorithm for Solving a Dynamic Cell Formation Problem with Production Planning.
Proceedings of the Advanced Intelligent Computing Theories and Applications, 2010
Developing a Procedure to Obtain Knowledge of Optimum Solutions in a Travelling Salesman Problem.
Proceedings of the Advanced Intelligent Computing Theories and Applications, 2010
2009
A comprehensive decision making structure for partitioning of make-to-order, make-to-stock and hybrid products.
Soft Comput., 2009
A hybridization of simulated annealing and electromagnetic-like mechanism for job shop problems with machine availability and sequence-dependent setup times to minimize total weighted tardiness.
Soft Comput., 2009
A novel hybrid approach combining electromagnetism-like method with Solis and Wets local search for continuous optimization problems.
J. Glob. Optim., 2009
Solving a Single Machine Scheduling Problem by a Discrete Version of Electromagnetism-like Method.
J. Circuits Syst. Comput., 2009
An extension of the relaxation algorithm for solving a special case of capacitated arc routing problems.
J. Comb. Optim., 2009
An extended fuzzy parametric programming-based approach for designing cellular manufacturing systems under uncertainty and dynamic conditions.
Int. J. Comput. Integr. Manuf., 2009
Expert Syst. Appl., 2009
Application of genetic algorithm to computer-aided process planning in preliminary and detailed planning.
Eng. Appl. Artif. Intell., 2009
Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints.
Comput. Oper. Res., 2009
A memetic algorithm for the flexible flow line scheduling problem with processor blocking.
Comput. Oper. Res., 2009
An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports.
Comput. Ind. Eng., 2009
A hybrid artificial immune algorithm for a realistic variant of job shops to minimize the total completion time.
Comput. Ind. Eng., 2009
A simulated annealing method for solving a new mathematical model of a multi-criteria cell formation problem with capital constraints.
Adv. Eng. Softw., 2009
Proceedings of the Joint 2009 International Fuzzy Systems Association World Congress and 2009 European Society of Fuzzy Logic and Technology Conference, 2009
2008
Proceedings of the New Challenges in Applied Intelligence Technologies, 2008
A Comparison of Three Meta-heuristics for a Closed-Loop Layout Problem with Unequal-Sized Facilities.
Proceedings of the New Challenges in Applied Intelligence Technologies, 2008
Reliability optimization of series-parallel systems with a choice of redundancy strategies using a genetic algorithm.
Reliab. Eng. Syst. Saf., 2008
A new solution for a dynamic cell formation problem with alternative routing and machine costs using simulated annealing.
J. Oper. Res. Soc., 2008
Accessing feasible space in a generalized job shop scheduling problem with the fuzzy processing times: a fuzzy-neural approach.
J. Oper. Res. Soc., 2008
A new mathematical model for a distribution network problem in a multi-product supply chain system: a real-case study.
Int. J. Manuf. Technol. Manag., 2008
A fuzzy programming approach for a cell formation problem with dynamic and uncertain conditions.
Fuzzy Sets Syst., 2008
Adv. Eng. Informatics, 2008
A Discrete Binary Version of the Electromagnetism-Like Heuristic for Solving Traveling Salesman Problem.
Proceedings of the Advanced Intelligent Computing Theories and Applications. With Aspects of Artificial Intelligence, 2008
A Decision Support System for Facility Location Selection Based on a Fuzzy House of Quality Method.
Proceedings of the ICEIS 2008, 2008
An Efficient Hybrid Method for Clustering Problems.
Proceedings of the ICEIS 2008, 2008
Solving an Open Shop Scheduling Problem by a Novel Hybrid Multi-Objective Ant Colony Optimization.
Proceedings of the 8th International Conference on Hybrid Intelligent Systems (HIS 2008), 2008
2007
A discrete-time approximation technique for the time-cost trade-off in PERT networks.
RAIRO Oper. Res., 2007
A new approach for the cellular manufacturing problem in fuzzy dynamic conditions by a genetic algorithm.
J. Intell. Fuzzy Syst., 2007
A New Capacitated Vehicle Routing Problem with Split Service for Minimizing Fleet Cost by Simulated Annealing.
J. Frankl. Inst., 2007
A hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: Weighted mean completion time and weighted mean tardiness.
Inf. Sci., 2007
Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach.
Eur. J. Oper. Res., 2007
Design of a facility layout problem in cellular manufacturing systems with stochastic demands.
Appl. Math. Comput., 2007
Adv. Eng. Informatics, 2007
Proceedings of the 2007 IEEE Symposium on Computational Intelligence in Scheduling, 2007
2006
Appl. Math. Comput., 2006
A hybrid simulated annealing for capacitated vehicle routing problems with the independent route length.
Appl. Math. Comput., 2006
Multi-criteria sequencing problem for a mixed-model assembly line in a JIT production system.
Appl. Math. Comput., 2006
A branch-and-bound algorithm for a single machine sequencing to minimize the sum of maximum earliness and tardiness with idle insert.
Appl. Math. Comput., 2006
An economic production lot size model with deteriorating items, stock-dependent demand, inflation, and partial backlogging.
Appl. Math. Comput., 2006
Appl. Math. Comput., 2006
Proceedings of the Operations Research, 2006
Proceedings of the Operations Research, 2006
Proceedings of the Operations Research, 2006
An Evolutionary Algorithm for a Single-Item Resource-Constrained Aggregate Production Planning Problem.
Proceedings of the IEEE International Conference on Evolutionary Computation, 2006
A Memetic Algorithm for Multi-Criteria Sequencing Problem for a Mixed-Model Assembly Line in a JIT Production System.
Proceedings of the IEEE International Conference on Evolutionary Computation, 2006
2005
Allocation of parts to cells, minimising tardiness and idle time by simulated annealing.
Int. J. Manuf. Technol. Manag., 2005
Comput. Ind. Eng., 2005
Optimal scheduling for a single machine to minimize the sum of maximum earliness and tardiness considering idle insert.
Appl. Math. Comput., 2005
Appl. Math. Comput., 2005
Appl. Math. Comput., 2005
Solving a Dynamic Cell Formation Problem with Machine Cost and Alternative Process Plan by Memetic Algorithms.
Proceedings of the Stochastic Algorithms: Foundations and Applications, 2005