Reza Tavakkoli-Moghaddam

Orcid: 0000-0002-6757-926X

Affiliations:
  • University of Tehran, Iran


According to our database1, Reza Tavakkoli-Moghaddam authored at least 309 papers between 2005 and 2024.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2024
Solving a new mathematical model for the integrated cockpit crew pairing and rostering problem by meta-heuristic algorithms under the COVID-19 pandemic.
J. Oper. Res. Soc., August, 2024

On the availability and changeover cases of the general lot-sizing and scheduling problem with maintenance modelling: a Lagrangian-based heuristic approach.
Oper. Res., June, 2024

Production scheduling in a reconfigurable manufacturing system benefiting from human-robot collaboration.
Int. J. Prod. Res., February, 2024

An integrated approach for evaluating and improving the performance of hospital ICUs based on ergonomic and work-motivational factors.
Comput. Biol. Medicine, January, 2024

Simulation and process mining in a cross-docking system: a case study.
Int. J. Prod. Res., 2024

An integrated lot-sizing and scheduling problem in a reconfigurable manufacturing system under workforce constraints.
Int. J. Prod. Res., 2024

Multi-objective boxing match algorithm for multi-objective optimization problems.
Expert Syst. Appl., 2024

Lagrangian relaxation method for solving a new time-dependent production-distribution planning model.
Expert Syst. Appl., 2024

A hybrid machine learning model based on ensemble methods for devices fault prediction in the wood industry.
Expert Syst. Appl., 2024

Optimizing COVID-19 medical waste management using goal and robust possibilistic programming.
Eng. Appl. Artif. Intell., 2024

Designing a two-stage model for a sustainable closed-loop electric vehicle battery supply chain network: A scenario-based stochastic programming approach.
Comput. Ind. Eng., 2024

An AUGMECON2VIKOR Algorithm for a Multi-objective Model in a Sustainable Manufacturing System Under Reliable Constraints.
Proceedings of the Advances in Production Management Systems. Production Management Systems for Volatile, Uncertain, Complex, and Ambiguous Environments, 2024

Designing a New Dry Port-Seaport Logistics Network with a Focus on Industry 5.0 by Machine Learning.
Proceedings of the Advances in Production Management Systems. Production Management Systems for Volatile, Uncertain, Complex, and Ambiguous Environments, 2024

Analysis of Critical Success Factors of Sustainable and Resilient Aioe-based Supply Chain in Industry 5.0.
Proceedings of the Advances in Production Management Systems. Production Management Systems for Volatile, Uncertain, Complex, and Ambiguous Environments, 2024

A Flexible Job Shop Scheduling Problem Involving Reconfigurable Machine Tools Under Industry 5.0.
Proceedings of the Advances in Production Management Systems. Production Management Systems for Volatile, Uncertain, Complex, and Ambiguous Environments, 2024

2023
A discrete time/resource trade-off problem with a critical chain method under uncertainty: a hybrid meta-heuristic algorithm.
Soft Comput., December, 2023

An integrated chance-constrained stochastic model for a preemptive multi-skilled multi-mode resource-constrained project scheduling problem: A case study of building a sports center.
Eng. Appl. Artif. Intell., November, 2023

Disruption-resilient supply chain entities with decentralized robust-stochastic capacity planning.
Reliab. Eng. Syst. Saf., October, 2023

Dynamic opportunistic maintenance grouping in a lot streaming based job-shop scheduling problem.
Comput. Ind. Eng., September, 2023

A customized multi-neighborhood search algorithm using the tabu list for a sustainable closed-loop supply chain network under uncertainty.
Appl. Soft Comput., September, 2023

Two new feature selection methods based on learn-heuristic techniques for breast cancer prediction: a comprehensive analysis.
Ann. Oper. Res., September, 2023

Solving a new bi-objective mathematical model for a hybrid flow shop scheduling problem with robots and fuzzy maintenance time.
Comput. Ind. Eng., August, 2023

Mathematical modeling of a competitive transportation-location arc routing problem.
Comput. Ind. Eng., August, 2023

A holistic, integrated supply-production-distribution problem in the dairy industry under uncertain supply and demand.
Comput. Ind. Eng., July, 2023

Integrated configuration design and capacity planning in a dynamic cloud manufacturing system.
Int. J. Prod. Res., May, 2023

A competitive pharmaceutical supply chain under the marketing mix strategies and product life cycle with a fuzzy stochastic demand.
Ann. Oper. Res., May, 2023

Solving a hub location-routing problem with a queue system under social responsibility by a fuzzy meta-heuristic algorithm.
Ann. Oper. Res., May, 2023

A systems approach to improve reliability of a contract by Modularising contract's information flow architecture: a new contribution to risk mitigation in projects management.
Enterp. Inf. Syst., April, 2023

A chance-constraint optimization model for a multi-echelon multi-product closed-loop supply chain considering brand diversity: An accelerated Benders decomposition algorithm.
Comput. Oper. Res., April, 2023

Meta-heuristics for sustainable supply chain management: a review.
Int. J. Prod. Res., March, 2023

A bi-objective home care routing and scheduling problem considering patient preference and soft temporal dependency constraints.
Eng. Appl. Artif. Intell., March, 2023

Bi-objective collaborative electric vehicle routing problem: mathematical modeling and matheuristic approach.
J. Ambient Intell. Humaniz. Comput., 2023

Breast cancer classification by a new approach to assessing deep neural network-based uncertainty quantification methods.
Biomed. Signal Process. Control., 2023

Artificial Intelligence of Things (AIoT) Strategies for a Smart Sustainable-Resilient Supply Chain.
Proceedings of the Advances in Production Management Systems. Production Management Systems for Responsible Manufacturing, Service, and Logistics Futures, 2023

A Constraint Programming Model for a Reconfigurable Job Shop Scheduling Problem with Machine Availability.
Proceedings of the Advances in Production Management Systems. Production Management Systems for Responsible Manufacturing, Service, and Logistics Futures, 2023

2022
A multi-objective optimization framework for a sustainable closed-loop supply chain network in the olive industry: Hybrid meta-heuristic algorithms.
Expert Syst. Appl., October, 2022

Mathematical modeling of a bi-objective hub location-routing problem for rapid transit networks.
RAIRO Oper. Res., September, 2022

A latency-aware task scheduling algorithm for allocating virtual machines in a cost-effective and time-sensitive fog-cloud architecture.
J. Supercomput., 2022

Boxing Match Algorithm: a new meta-heuristic algorithm.
Soft Comput., 2022

A heuristic-based simulated annealing algorithm for the scheduling of relief teams in natural disasters.
Soft Comput., 2022

Redesigning a supply chain network with system disruption using Lagrangian relaxation: a real case study.
Soft Comput., 2022

Solving a new bi-objective multi-echelon supply chain problem with a Jackson open-network issue under uncertainty.
Soft Comput., 2022

A new robust optimization model for relief logistics planning under uncertainty: a real-case study.
Soft Comput., 2022

Search in forest optimizer: a bioinspired metaheuristic algorithm for global optimization problems.
Soft Comput., 2022

A decision support model for robust allocation and routing of search and rescue resources after earthquake: a case study.
Oper. Res., 2022

Optimization of a television advertisement scheduling problem by multi-criteria decision making and dispatching rules.
Multim. Tools Appl., 2022

Simulation of the COVID-19 patient flow and investigation of the future patient arrival using a time-series prediction model: a real-case study.
Medical Biol. Eng. Comput., 2022

Prioritizing the glucose-lowering medicines for type 2 diabetes by an extended fuzzy decision-making approach with target-based attributes.
Medical Biol. Eng. Comput., 2022

A new technology acceptance model: a mixed-method of grounded theory and system dynamics.
Kybernetes, 2022

Sustainable facility relocation in agriculture systems using the GIS and best-worst method.
Kybernetes, 2022

Bi-level programming for home health care supply chain considering outsourcing.
J. Ind. Inf. Integr., 2022

Developing an integrated model for planning the delivery of construction materials to post-disaster reconstruction projects.
J. Comput. Des. Eng., 2022

A multi-verse optimizer algorithm for ambulance repositioning in emergency medical service systems.
J. Ambient Intell. Humaniz. Comput., 2022

An extended ϵ-constraint method for a multiobjective finite-horizon Markov decision process.
Int. Trans. Oper. Res., 2022

A hybrid learning-based meta-heuristic algorithm for scheduling of an additive manufacturing system consisting of parallel SLM machines.
Int. J. Prod. Res., 2022

Distributed job-shop rescheduling problem considering reconfigurability of machines: a self-adaptive hybrid equilibrium optimiser.
Int. J. Prod. Res., 2022

Integrated production-inventory-routing problem for multi-perishable products under uncertainty by meta-heuristic algorithms.
Int. J. Prod. Res., 2022

A new fuzzy tri-objective model for a home health care problem with green ambulance routing and congestion under uncertainty.
Expert Syst. Appl., 2022

Sustainable negotiation-based nesting and scheduling in additive manufacturing systems: A case study and multi-objective meta-heuristic algorithms.
Eng. Appl. Artif. Intell., 2022

Dynamic routing-scheduling problem for home health care considering caregiver-patient compatibility.
Comput. Oper. Res., 2022

Competitive facility location problem with foresight considering discrete-nature attractiveness for facilities: Model and solution.
Comput. Oper. Res., 2022

An intelligent algorithm to evaluate and improve the performance of a home healthcare center considering trust indicators.
Comput. Biol. Medicine, 2022

Performance assessment and improvement of a care unit for COVID-19 patients with resilience engineering and motivational factors: An artificial neural network method.
Comput. Biol. Medicine, 2022

An integrated approach for evaluating and improving the performance of surgical theaters with resilience engineering.
Comput. Biol. Medicine, 2022

Solving a parallel-line capacitated lot-sizing and scheduling problem with sequence-dependent setup time/cost and preventive maintenance by a rolling horizon method.
Comput. Ind. Eng., 2022

Designing a clinical decision support system for Alzheimer's diagnosis on OASIS-3 data set.
Biomed. Signal Process. Control., 2022

A centroid opposition-based coral reefs algorithm for solving an automated guided vehicle routing problem with a recharging constraint.
Appl. Soft Comput., 2022

An integrative location-allocation model for humanitarian logistics with distributive injustice and dissatisfaction under uncertainty.
Ann. Oper. Res., 2022

Designing a sustainable closed-loop pharmaceutical supply chain in a competitive market considering demand uncertainty, manufacturer's brand and waste management.
Ann. Oper. Res., 2022

A Mathematical Model for Dynamic Scheduling of Production and Maintenance Activities in a Flexible Job-Shop System.
Proceedings of the 6th International Conference on System Reliability and Safety, 2022

2021
Determining the price and refund of products in a supply chain with quality and advertising costs in a fuzzy environment.
Soft Comput., 2021

A mathematical model to design dynamic cellular manufacturing systems in multiple plants with production planning and location-allocation decisions.
Soft Comput., 2021

A simulation-optimization algorithm for return strategies in emergency medical systems.
Simul., 2021

Integration of parts scheduling, MRP, production planning and generalized fixed-charge transportation planning in the design of a dynamic cellular manufacturing system.
RAIRO Oper. Res., 2021

Scheduling Piecewise Linear Deteriorating Jobs to Minimize Makespan in a Two-Machine Flowshop.
Oper. Res. Forum, 2021

A combinatorial auction-based approach for ridesharing in a student transportation system.
Networks, 2021

Sustainable vehicle routing problem for coordinated solid waste management.
J. Ind. Inf. Integr., 2021

Incorporating order acceptance, pricing and equity considerations in the scheduling of cloud manufacturing systems: matheuristic methods.
Int. J. Prod. Res., 2021

Competitive green supply chain network design model considering inventory decisions under uncertainty: a real case of a filter company.
Int. J. Prod. Res., 2021

Simultaneous waterway scheduling, berth allocation, and quay crane assignment: A novel matheuristic approach.
Int. J. Prod. Res., 2021

A robust home health care routing-scheduling problem with temporal dependencies under uncertainty.
Expert Syst. Appl., 2021

A hybrid of clustering and meta-heuristic algorithms to solve a <i>p</i>-mobile hub location-allocation problem with the depreciation cost of hub facilities.
Eng. Appl. Artif. Intell., 2021

Designing a sustainable-resilient disaster waste management system under hybrid uncertainty: A case study.
Eng. Appl. Artif. Intell., 2021

Solving a new robust reverse job shop scheduling problem by meta-heuristic algorithms.
Eng. Appl. Artif. Intell., 2021

A hybrid Z-number data envelopment analysis and neural network for assessment of supply chain resilience: a case study.
Central Eur. J. Oper. Res., 2021

Bi-objective build-to-order supply chain network design under uncertainty and time-dependent demand: An automobile case study.
Comput. Ind. Eng., 2021

A routing and scheduling problem for cross-docking networks with perishable products, heterogeneous vehicles and split delivery.
Comput. Ind. Eng., 2021

Hybridization of an interactive fuzzy methodology with a lexicographic min-max approach for optimizing a multi-period multi-product multi-echelon sustainable closed-loop supply chain network.
Comput. Ind. Eng., 2021

A new bi-objective model of the urban public transportation hub network design under uncertainty.
Ann. Oper. Res., 2021

Two hybrid <i>meta</i>-heuristic algorithms for a dual-channel closed-loop supply chain network design problem in the tire industry under uncertainty.
Adv. Eng. Informatics, 2021

Home Healthcare Routing and Scheduling Problem During the COVID-19 Pandemic.
Proceedings of the Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, 2021

Scheduling of Parallel 3D-Printing Machines with Incompatible Job Families: A Matheuristic Algorithm.
Proceedings of the Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, 2021

Integrated Workforce Allocation and Scheduling in a Reconfigurable Manufacturing System Considering Cloud Manufacturing.
Proceedings of the Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, 2021

Sustainable Facility Location-Routing Problem for Blood Package Delivery by Drones with a Charging Station.
Proceedings of the Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, 2021

2020
Two calibrated meta-heuristics to solve an integrated scheduling problem of production and air transportation with the interval due date.
Soft Comput., 2020

Red deer algorithm (RDA): a new nature-inspired meta-heuristic.
Soft Comput., 2020

Educational demographics: a system dynamics model for human resource management.
Int. J. Syst. Assur. Eng. Manag., 2020

Mixed-integer linear programming model for tree-like pipeline scheduling problem with intermediate due dates on demands.
Oper. Res., 2020

A hybrid intelligent algorithm for a fuzzy multi-objective job shop scheduling problem with reentrant workflows and parallel machines.
J. Intell. Fuzzy Syst., 2020

A novel FMEA model based on fuzzy multiple-criteria decision-making methods for risk assessment.
J. Enterp. Inf. Manag., 2020

Scheduling of human-robot collaboration in assembly of printed circuit boards: a constraint programming approach.
Int. J. Comput. Integr. Manuf., 2020

Reliable blood supply chain network design with facility disruption: A real-world application.
Eng. Appl. Artif. Intell., 2020

Performance Analysis of Meta-heuristic Algorithms for a Quadratic Assignment Problem.
CoRR, 2020

A multi-modal competitive hub location pricing problem with customer loyalty and elastic demand.
Comput. Oper. Res., 2020

Multiobjective fuzzy mathematical model for a financially constrained closed-loop supply chain with labor employment.
Comput. Intell., 2020

A new bi-objective vehicle routing-scheduling problem with cross-docking: Mathematical model and algorithms.
Comput. Ind. Eng., 2020

A robust location-arc routing problem under uncertainty: mathematical model with lower and upper bounds.
Comput. Appl. Math., 2020

Flexible job shop scheduling problem with reconfigurable machine tools: An improved differential evolution algorithm.
Appl. Soft Comput., 2020

A new weighted distance-based approximation methodology for flow shop scheduling group decisions under the interval-valued fuzzy processing time.
Appl. Soft Comput., 2020

A School Bus Routing and Scheduling Problem with Time Windows and Possibility of Outsourcing with the Provided Service Quality.
Proceedings of the Intelligent Systems Design and Applications, 2020

A Bi-objective Scheduling Model for Additive Manufacturing with Multiple Materials and Sequence-Dependent Setup Time.
Proceedings of the Advances in Production Management Systems. Towards Smart and Digital Manufacturing, 2020

A New Application of Coordination Contracts for Supplier Selection in a Cloud Environment.
Proceedings of the Advances in Production Management Systems. Towards Smart and Digital Manufacturing, 2020

Dynamic Distributed Job-Shop Scheduling Problem Consisting of Reconfigurable Machine Tools.
Proceedings of the Advances in Production Management Systems. Towards Smart and Digital Manufacturing, 2020

An Improvement in Master Surgical Scheduling Using Artificial Neural Network and Fuzzy Programming Approach.
Proceedings of the Advances in Production Management Systems. Towards Smart and Digital Manufacturing, 2020

Multi-objective Optimization for Mixed-model Assembly Line Sequencing and Balancing in the Context of Industry 4.0.
Proceedings of the IEEE International Conference on Industrial Engineering and Engineering Management, 2020

2019
Forward and reverse flows pricing decisions for two competing supply chains with common collection centers in an intuitionistic fuzzy environment.
Soft Comput., 2019

A new comprehensive possibilistic group decision approach for resilient supplier selection with mean-variance-skewness-kurtosis and asymmetric information under interval-valued fuzzy uncertainty.
Neural Comput. Appl., 2019

A multi-objective model for the closed-loop supply chain network design with a price-dependent demand, shortage and disruption.
J. Intell. Fuzzy Syst., 2019

An interval-valued fuzzy statistical group decision making approach with new evaluating indices for sustainable supplier selection problem.
J. Intell. Fuzzy Syst., 2019

A robust approach for a green periodic competitive VRP under uncertainty: DE and PSO algorithms.
J. Intell. Fuzzy Syst., 2019

Pricing decisions in a multiechelon supply chain under a bundling strategy.
Int. Trans. Oper. Res., 2019

A satisfactory multi-agent single-machine considering a cross-docking terminal.
Int. J. Syst. Syst. Eng., 2019

A trade-off between productivity and cost for the integrated part quality inspection and preventive maintenance planning under uncertainty.
Int. J. Prod. Res., 2019

A review on optimisation of part quality inspection planning in a multi-stage manufacturing system.
Int. J. Prod. Res., 2019

An Improved Artificial Intelligence Based on Gray Wolf Optimization and Cultural Algorithm to Predict Demand for Dairy Products: A Case Study.
Int. J. Interact. Multim. Artif. Intell., 2019

A new robust-possibilistic reliable hub protection model with elastic demands and backup hubs under risk.
Eng. Appl. Artif. Intell., 2019

Solving a new bi-objective hierarchical hub location problem with an M∕M∕c queuing framework.
Eng. Appl. Artif. Intell., 2019

A two-stage approach to agile pharmaceutical supply chain management with product substitutability in crises.
Comput. Chem. Eng., 2019

Multi-objective mathematical modeling for sustainable supply chain management in the paper industry.
Comput. Ind. Eng., 2019

Extending the solid step fixed-charge transportation problem to consider two-stage networks and multi-item shipments.
Comput. Ind. Eng., 2019

Find-Fix-Finish-Exploit-Analyze (F3EA) meta-heuristic algorithm: An effective algorithm with new evolutionary operators for global optimization.
Comput. Ind. Eng., 2019

Hybrid artificial intelligence and robust optimization for a multi-objective product portfolio problem Case study: The dairy products industry.
Comput. Ind. Eng., 2019

Modified variable neighborhood search and genetic algorithm for profitable heterogeneous vehicle routing problem with cross-docking.
Appl. Soft Comput., 2019

Location Optimization of Gas Power Plants by a Z-Number Data Envelopment Analysis.
Proceedings of the Optimization of Complex Systems: Theory, 2019

A Goal Programming Approach for a Fuzzy Single-Source Capacitated Facility Location Problem.
Proceedings of the 2019 IEEE International Conference on Industrial Engineering and Engineering Management, 2019

Non-Preemptive Open Shop Scheduling Considering Machine Availability.
Proceedings of the 2019 IEEE International Conference on Industrial Engineering and Engineering Management, 2019

2018
A novel group decision model based on mean-variance-skewness concepts and interval-valued fuzzy sets for a selection problem of the sustainable warehouse location under uncertainty.
Neural Comput. Appl., 2018

Interval-Valued Uncertainty Based on Entropy and Dempster-Shafer Theory.
J. Stat. Theory Appl., 2018

Modeling truck scheduling problem at a cross-dock facility through a bi-objective bi-level optimization approach.
J. Intell. Manuf., 2018

Multi-objective interior search algorithm for optimization: A new multi-objective meta-heuristic algorithm.
J. Intell. Fuzzy Syst., 2018

An integrated cellular manufacturing system with type-2 fuzzy variables: Three tuned meta-heuristic algorithms.
J. Intell. Fuzzy Syst., 2018

Design of a pharmaceutical supply chain network under uncertainty considering perishability and substitutability of products.
Inf. Sci., 2018

A bi-objective robust inspection planning model in a multi-stage serial production system.
Int. J. Prod. Res., 2018

The Social Engineering Optimizer (SEO).
Eng. Appl. Artif. Intell., 2018

Designing and optimizing a sustainable supply chain network for a blood platelet bank under uncertainty.
Eng. Appl. Artif. Intell., 2018

An accelerated Benders decomposition algorithm for reliable facility location problems in multi-echelon networks.
Comput. Ind. Eng., 2018

Pharmacological therapy selection of type 2 diabetes based on the SWARA and modified MULTIMOORA methods under a fuzzy environment.
Artif. Intell. Medicine, 2018

Location-Pricing Problem in the Closed-Loop Supply Chain Network Design Under Uncertainty.
Proceedings of the Service Orientation in Holonic and Multi-Agent Manufacturing, 2018

Sustainable Design for a Bi-level Transportation-Location-Vehicle Routing Scheduling Problem in a Perishable Product Supply Chain.
Proceedings of the Service Orientation in Holonic and Multi-Agent Manufacturing, 2018

A New Approach to Integrate Resilience Engineering and Business Process Reengineering Design.
Proceedings of the 2018 IEEE International Conference on Industrial Engineering and Engineering Management, 2018

A Bi-objective Credibility-based Fuzzy Mathematical Programming Model for a Healthcare Facility Location-network Design Problem.
Proceedings of the 2018 IEEE International Conference on Industrial Engineering and Engineering Management, 2018

Performance Evaluation with a Z-number Data Envelopment Analysis: A Case Study of a Petrochemical Plant.
Proceedings of the 2018 IEEE International Conference on Industrial Engineering and Engineering Management, 2018

Mathematical Modelling for a Semi-obnoxious Inverse Line Location Problem.
Proceedings of the 2018 IEEE International Conference on Industrial Engineering and Engineering Management, 2018

2017
A mathematical model for assessing the effects of a lot splitting feature on a dynamic cellular manufacturing system.
Prod. Eng., 2017

Modified particle swarm optimization in a time-dependent vehicle routing problem: minimizing fuel consumption.
Optim. Lett., 2017

Blood inventory-routing problem under uncertainty.
J. Intell. Fuzzy Syst., 2017

A novel multi-stage possibilistic stochastic programming approach (with an application in relief distribution planning).
Inf. Sci., 2017

Towards a psychologically consistent cellular manufacturing system.
Int. J. Prod. Res., 2017

A new method for fuzzy numbers ranking on the basis of hypotenuse set.
Int. J. Math. Oper. Res., 2017

A new enhanced support vector model based on general variable neighborhood search algorithm for supplier performance evaluation: A case study.
Int. J. Comput. Intell. Syst., 2017

A multi-objective imperialist competitive algorithm for integrating intra-cell layout and processing route reliability in a cellular manufacturing system.
Int. J. Comput. Integr. Manuf., 2017

Bertrand competition for a cellular manufacturing system.
Int. J. Comput. Integr. Manuf., 2017

Design of a reliable multi-modal multi-commodity model for hazardous materials transportation under uncertainty.
Eur. J. Oper. Res., 2017

Solving a fuzzy fixed charge solid transportation problem using batch transferring by new approaches in meta-heuristic.
Electron. Notes Discret. Math., 2017

A self-adaptive evolutionary algorithm for a fuzzy multi-objective hub location problem: An integration of responsiveness and social responsibility.
Eng. Appl. Artif. Intell., 2017

A Two-Phase Safe Vehicle Routing and Scheduling Problem: Formulations and Solution Algorithms.
CoRR, 2017

Solving a bi-objective unrelated parallel batch processing machines scheduling problem: A comparison study.
Comput. Oper. Res., 2017

A Benders' decomposition algorithm for optimizing distribution of perishable products considering postharvest biological behavior in agri-food supply chain: a case study of tomato.
Central Eur. J. Oper. Res., 2017

Designing a Reliable Multi-Objective Queuing Model of a Petrochemical Supply Chain Network under Uncertainty: A Case Study.
Comput. Chem. Eng., 2017

A tri-level r-interdiction median model for a facility location problem under imminent attack.
Comput. Ind. Eng., 2017

An interactive possibilistic programming approach for a multi-objective hub location problem: Economic and environmental design.
Appl. Soft Comput., 2017

2016
An MCDA-DEA approach for mixed-model assembly line balancing problem under uncertainty.
J. Intell. Fuzzy Syst., 2016

Optimization of a multi-modal tree hub location network with transportation energy consumption: A fuzzy approach.
J. Intell. Fuzzy Syst., 2016

Design of a fuzzy bi-objective reliable p-hub center problem.
J. Intell. Fuzzy Syst., 2016

A new multi-objective model for a capacitated hub covering problem solving by two multi-objective evolutionary algorithms.
Int. J. Math. Oper. Res., 2016

Multi-objective multi-product multi-site aggregate production planning in a supply chain under uncertainty: fuzzy multi-objective optimisation.
Int. J. Comput. Integr. Manuf., 2016

A game-based meta-heuristic for a fuzzy bi-objective reliable hub location problem.
Eng. Appl. Artif. Intell., 2016

A note on "minimizing makespan in three machine flow shop with deteriorating jobs".
Comput. Oper. Res., 2016

Designing a fuzzy Q-learning multi-agent quality control system for a continuous chemical production line - A case study.
Comput. Ind. Eng., 2016

An interactive approach for designing a robust disaster relief logistics network with perishable commodities.
Comput. Ind. Eng., 2016

A bi-objective truck scheduling problem in a cross-docking center with probability of breakdown for trucks.
Comput. Ind. Eng., 2016

Two meta-heuristics to solve a coordinated air transportation and production scheduling problem with time windows for the due date.
Proceedings of the 2016 IEEE International Conference on Systems, Man, and Cybernetics, 2016

2015
Optimizing a vendor managed inventory (VMI) model considering delivering cost in a three-echelon supply chain using two tuned-parameter meta-heuristics.
Int. J. Syst. Assur. Eng. Manag., 2015

Lead time and ordering cost reductions in budget and storage space restricted probabilistic inventory models with imperfect items.
RAIRO Oper. Res., 2015

A hybrid fuzzy approach for the closed-loop supply chain network design under uncertainty.
J. Intell. Fuzzy Syst., 2015

Solving a novel multi-objective uncapacitated hub location problemby five meta-heuristics.
J. Intell. Fuzzy Syst., 2015

An artificial bee colony algorithm for a two-stage hybrid flowshop scheduling problem with multilevel product structures and requirement operations.
Int. J. Comput. Integr. Manuf., 2015

A credibility-constrained programming for reliable forward-reverse logistics network design under uncertainty and facility disruptions.
Int. J. Comput. Integr. Manuf., 2015

A stochastic approach for a novel p-hub location-allocation problem with opening and reopening modes.
Int. J. Bus. Perform. Supply Chain Model., 2015

An intuitionistic fuzzy grey model for selection problems with an application to the inspection planning in manufacturing firms.
Eng. Appl. Artif. Intell., 2015

A new stochastic approach for a reliable p-hub covering location problem.
Comput. Ind. Eng., 2015

Comprehensive fuzzy multi-objective multi-product multi-site aggregate production planning decisions in a supply chain under uncertainty.
Appl. Soft Comput., 2015

Robust and fuzzy goal programming optimization approaches for a novel multi-objective hub location-allocation problem: A supply chain overview.
Appl. Soft Comput., 2015

A new multi-objective scheduling problem on batch parallel machines with maximum allowable incompatibility for jobs.
Proceedings of the 2015 IEEE International Conference on Industrial Engineering and Engineering Management, 2015

An Interval-Valued Hesitant Fuzzy TOPSIS Method to Determine the Criteria Weights.
Proceedings of the Outlooks and Insights on Group Decision and Negotiation, 2015

A Multi-criteria Group Decision-Making Approach for Facility Location Selection Using PROMETHEE Under a Fuzzy Environment.
Proceedings of the Outlooks and Insights on Group Decision and Negotiation, 2015

Redundancy Resource Allocation for Reliable Project Scheduling: A Game-theoretical Approach.
Proceedings of the Conference on ENTERprise Information Systems/International Conference on Project MANagement/Conference on Health and Social Care Information Systems and Technologies, 2015

2014
A new method for trapezoidal fuzzy numbers ranking based on the Shadow length and its application to manager's risk taking.
J. Intell. Fuzzy Syst., 2014

Designing a multi-echelon supply chain network: A car manufacturer case study.
J. Intell. Fuzzy Syst., 2014

Risk ranking in mega projects by fuzzy compromise approach: A comparative analysis.
J. Intell. Fuzzy Syst., 2014

A multi-objective vehicle routing and scheduling problem with uncertainty in customers' request and priority.
J. Comb. Optim., 2014

An interactive possibilistic programming approach for a multi-objective closed-loop supply chain network under uncertainty.
Int. J. Syst. Sci., 2014

Soft computing based on a fuzzy grey group compromise solution approach with an application to the selection problem of material handling equipment.
Int. J. Comput. Integr. Manuf., 2014

A hybrid electromagnetism-like algorithm for dynamic inter/intra-cell layout problem.
Int. J. Comput. Integr. Manuf., 2014

Solving a new multi-objective hybrid flexible flowshop problem with limited waiting times and machine-sequence-dependent set-up time constraints.
Int. J. Comput. Integr. Manuf., 2014

A robust possibilistic programming approach to multi-period location-allocation of organ transplant centers under uncertainty.
Comput. Ind. Eng., 2014

An approach for modeling a new single machine scheduling problem with deteriorating and learning effects.
Comput. Ind. Eng., 2014

Solving a new bi-objective location-routing-inventory problem in a distribution network by meta-heuristics.
Comput. Ind. Eng., 2014

Multiple cross-docks scheduling using two meta-heuristic algorithms.
Comput. Ind. Eng., 2014

A multi-objective dynamic vehicle routing problem with fuzzy time windows: Model, solution and application.
Appl. Soft Comput., 2014

Interval programming for the redundancy allocation with choices of redundancy strategy and component type under uncertainty: Erlang time to failure distribution.
Appl. Math. Comput., 2014

A multi-objective imperialist competitive algorithm to solve a new multi-modal tree hub location problem.
Proceedings of the 2014 Sixth World Congress on Nature and Biologically Inspired Computing, 2014

Design of a dynamic bi-objective relief routing network in the earthquake response phase.
Proceedings of the 2014 IEEE International Conference on Industrial Engineering and Engineering Management, 2014

2013
Multiobjective Dynamic Vehicle Routing Problem With Fuzzy Travel Times and Customers' Satisfaction in Supply Chain Management.
IEEE Trans. Engineering Management, 2013

Solving a fuzzy fixed charge solid transportation problem by metaheuristics.
Math. Comput. Model., 2013

An imperialist competitive algorithm for multi-objective U-type assembly line design.
J. Comput. Sci., 2013

A fuzzy grey model based on the compromise ranking for multi-criteria group decision making problems in manufacturing systems.
J. Intell. Fuzzy Syst., 2013

Operational Research.
J. Appl. Math., 2013

A new compromise solution method for fuzzy group decision-making problems with an application to the contractor selection.
Eng. Appl. Artif. Intell., 2013

A hybrid multi-objective approach based on the genetic algorithm and neural network to design an incremental cellular manufacturing system.
Comput. Ind. Eng., 2013

Soft computing based on new interval-valued fuzzy modified multi-criteria decision-making method.
Appl. Soft Comput., 2013

A genetic algorithm using priority-based encoding with new operators for fixed charge transportation problems.
Appl. Soft Comput., 2013

The center location-dependent relocation problem with a probabilistic line barrier.
Appl. Soft Comput., 2013

A Hybrid Simulated Annealing Algorithm for Location of Cross-Docking Centers in a Supply Chain.
Proceedings of the Hybrid Metaheuristics - 8th International Workshop, 2013

2012
Vehicle routing scheduling using an enhanced hybrid optimization approach.
J. Intell. Manuf., 2012

Soft computing based on interval valued fuzzy ANP-A novel methodology.
J. Intell. Manuf., 2012

A cell formation problem considering machine utilization and alternative process routes by scatter search.
J. Intell. Manuf., 2012

Cyclic scheduling of a robotic flexible cell with load lock and swap.
J. Intell. Manuf., 2012

An Electromagnetism-like algorithm for cell formation and layout problem.
Expert Syst. Appl., 2012

Solving a periodic single-track train timetabling problem by an efficient hybrid algorithm.
Eng. Appl. Artif. Intell., 2012

Solving a group layout design model of a dynamic cellular manufacturing system with alternative process routings, lot splitting and flexible reconfiguration by simulated annealing.
Comput. Oper. Res., 2012

The periodicity and robustness in a single-track train scheduling problem.
Appl. Soft Comput., 2012

Annealing-based particle swarm optimization to solve the redundant reliability problem with multiple component choices.
Appl. Soft Comput., 2012

2011
An integrated artificial neural network-computer simulation for optimization of complex tandem queue systems.
Math. Comput. Simul., 2011

A new hybrid multi-objective Pareto archive PSO algorithm for a bi-objective job shop scheduling problem.
Expert Syst. Appl., 2011

Solving a multi-objective open shop scheduling problem by a novel hybrid ant colony optimization.
Expert Syst. Appl., 2011

Risk assessment for highway projects using jackknife technique.
Expert Syst. Appl., 2011

Solving a capacitated fixed-charge transportation problem by artificial immune and genetic algorithms with a Prüfer number representation.
Expert Syst. Appl., 2011

The use of multi-criteria data envelopment analysis (MCDEA) for location-allocation problems in a fuzzy environment.
Expert Syst. Appl., 2011

The use of a genetic algorithm for clustering the weighing station performance in transportation - A case study.
Expert Syst. Appl., 2011

A hybridization of simulated annealing and electromagnetism-like mechanism for a periodic job shop scheduling problem.
Expert Syst. Appl., 2011

An integrated Data Envelopment Analysis-Artificial Neural Network-Rough Set Algorithm for assessment of personnel efficiency.
Expert Syst. Appl., 2011

Resource allocation in dynamic PERT networks with finite capacity.
Eur. J. Oper. Res., 2011

A hybrid approach based on the genetic algorithm and neural network to design an incremental cellular manufacturing system.
Appl. Soft Comput., 2011

Solving a bi-objective flowshop scheduling problem by a Multi-objective Immune System and comparing with SPEA2+ and SPGA.
Adv. Eng. Softw., 2011

A simulated annealing for solving a group layout design model of a dynamic cellular manufacturing system.
Proceedings of the 2011 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 2011

A multi-period facility location-relocation problem in the presence of a probabilistic line barrier.
Proceedings of the 2011 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 2011

A multi-objective identical parallel machine scheduling with setup and removal times with deteriorating and learning effects.
Proceedings of the 2011 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 2011

Selection of distribution centers with the time value of money and the loyal customer effect.
Proceedings of the 2011 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 2011

2010
Electromagnetism-like mechanism and simulated annealing algorithms for flowshop scheduling problems minimizing the total weighted tardiness and makespan.
Knowl. Based Syst., 2010

Design of a scatter search method for a novel multi-criteria group scheduling problem in a cellular manufacturing system.
Expert Syst. Appl., 2010

Addressing a nonlinear fixed-charge transportation problem using a spanning tree-based genetic algorithm.
Comput. Ind. Eng., 2010

The use of a fuzzy multi-objective linear programming for solving a multi-objective single-machine scheduling problem.
Appl. Soft Comput., 2010

Solving multi-objective optimization formulation for fleet planning in a railway industry.
Ann. Oper. Res., 2010

Multi-objective Particle Swarm Optimization for Sequencing and Scheduling a Cellular Manufacturing System.
Proceedings of the Advanced Intelligent Computing Theories and Applications, 2010

A New Hybrid Multi-objective Pareto Archive PSO Algorithm for a Classic Job Shop Scheduling Problem with Ready Times.
Proceedings of the Advanced Intelligent Computing Theories and Applications, 2010

Imperialistic Competitive Algorithm for Solving a Dynamic Cell Formation Problem with Production Planning.
Proceedings of the Advanced Intelligent Computing Theories and Applications, 2010

Developing a Procedure to Obtain Knowledge of Optimum Solutions in a Travelling Salesman Problem.
Proceedings of the Advanced Intelligent Computing Theories and Applications, 2010

2009
A comprehensive decision making structure for partitioning of make-to-order, make-to-stock and hybrid products.
Soft Comput., 2009

A hybridization of simulated annealing and electromagnetic-like mechanism for job shop problems with machine availability and sequence-dependent setup times to minimize total weighted tardiness.
Soft Comput., 2009

A novel hybrid approach combining electromagnetism-like method with Solis and Wets local search for continuous optimization problems.
J. Glob. Optim., 2009

Solving a Single Machine Scheduling Problem by a Discrete Version of Electromagnetism-like Method.
J. Circuits Syst. Comput., 2009

An extension of the relaxation algorithm for solving a special case of capacitated arc routing problems.
J. Comb. Optim., 2009

An extended fuzzy parametric programming-based approach for designing cellular manufacturing systems under uncertainty and dynamic conditions.
Int. J. Comput. Integr. Manuf., 2009

Designing a fuzzy system for controlling the armament fire in dynamic siege.
Expert Syst. Appl., 2009

Application of genetic algorithm to computer-aided process planning in preliminary and detailed planning.
Eng. Appl. Artif. Intell., 2009

Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints.
Comput. Oper. Res., 2009

A memetic algorithm for the flexible flow line scheduling problem with processor blocking.
Comput. Oper. Res., 2009

An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports.
Comput. Ind. Eng., 2009

A hybrid artificial immune algorithm for a realistic variant of job shops to minimize the total completion time.
Comput. Ind. Eng., 2009

A simulated annealing method for solving a new mathematical model of a multi-criteria cell formation problem with capital constraints.
Adv. Eng. Softw., 2009

A Fuzzy Particle Swarm Optimization Algorithm for a Cell Formation Problem.
Proceedings of the Joint 2009 International Fuzzy Systems Association World Congress and 2009 European Society of Fuzzy Logic and Technology Conference, 2009

2008
An Efficient Hybrid Method for an Expected Maximal Covering Location Problem.
Proceedings of the New Challenges in Applied Intelligence Technologies, 2008

A Comparison of Three Meta-heuristics for a Closed-Loop Layout Problem with Unequal-Sized Facilities.
Proceedings of the New Challenges in Applied Intelligence Technologies, 2008

Reliability optimization of series-parallel systems with a choice of redundancy strategies using a genetic algorithm.
Reliab. Eng. Syst. Saf., 2008

A new solution for a dynamic cell formation problem with alternative routing and machine costs using simulated annealing.
J. Oper. Res. Soc., 2008

Accessing feasible space in a generalized job shop scheduling problem with the fuzzy processing times: a fuzzy-neural approach.
J. Oper. Res. Soc., 2008

A new mathematical model for a distribution network problem in a multi-product supply chain system: a real-case study.
Int. J. Manuf. Technol. Manag., 2008

A fuzzy programming approach for a cell formation problem with dynamic and uncertain conditions.
Fuzzy Sets Syst., 2008

Make-to-order or make-to-stock decision by a novel hybrid approach.
Adv. Eng. Informatics, 2008

A Discrete Binary Version of the Electromagnetism-Like Heuristic for Solving Traveling Salesman Problem.
Proceedings of the Advanced Intelligent Computing Theories and Applications. With Aspects of Artificial Intelligence, 2008

A Decision Support System for Facility Location Selection Based on a Fuzzy House of Quality Method.
Proceedings of the ICEIS 2008, 2008

An Efficient Hybrid Method for Clustering Problems.
Proceedings of the ICEIS 2008, 2008

Solving an Open Shop Scheduling Problem by a Novel Hybrid Multi-Objective Ant Colony Optimization.
Proceedings of the 8th International Conference on Hybrid Intelligent Systems (HIS 2008), 2008

2007
A discrete-time approximation technique for the time-cost trade-off in PERT networks.
RAIRO Oper. Res., 2007

A new approach for the cellular manufacturing problem in fuzzy dynamic conditions by a genetic algorithm.
J. Intell. Fuzzy Syst., 2007

A New Capacitated Vehicle Routing Problem with Split Service for Minimizing Fleet Cost by Simulated Annealing.
J. Frankl. Inst., 2007

A hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: Weighted mean completion time and weighted mean tardiness.
Inf. Sci., 2007

Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach.
Eur. J. Oper. Res., 2007

Design of a facility layout problem in cellular manufacturing systems with stochastic demands.
Appl. Math. Comput., 2007

A multi-objective scatter search for a mixed-model assembly line sequencing problem.
Adv. Eng. Informatics, 2007

Solving a Bi-Criteria Permutation Flow Shop Problem Using Immune Algorithm.
Proceedings of the 2007 IEEE Symposium on Computational Intelligence in Scheduling, 2007

2006
A memetic algorithm for a vehicle routing problem with backhauls.
Appl. Math. Comput., 2006

A hybrid simulated annealing for capacitated vehicle routing problems with the independent route length.
Appl. Math. Comput., 2006

Multi-criteria sequencing problem for a mixed-model assembly line in a JIT production system.
Appl. Math. Comput., 2006

A branch-and-bound algorithm for a single machine sequencing to minimize the sum of maximum earliness and tardiness with idle insert.
Appl. Math. Comput., 2006

An economic production lot size model with deteriorating items, stock-dependent demand, inflation, and partial backlogging.
Appl. Math. Comput., 2006

A multi-objective resource allocation problem in dynamic PERT networks.
Appl. Math. Comput., 2006

Mixed-Model Assembly Line Sequencing Using Real Options.
Proceedings of the Operations Research, 2006

A New Approach for Mixed-Model Assembly Line Sequencing.
Proceedings of the Operations Research, 2006

A Multi-Objective Particle Swarm for a Mixed-Model Assembly Line Sequencing.
Proceedings of the Operations Research, 2006

An Evolutionary Algorithm for a Single-Item Resource-Constrained Aggregate Production Planning Problem.
Proceedings of the IEEE International Conference on Evolutionary Computation, 2006

A Memetic Algorithm for Multi-Criteria Sequencing Problem for a Mixed-Model Assembly Line in a JIT Production System.
Proceedings of the IEEE International Conference on Evolutionary Computation, 2006

2005
Allocation of parts to cells, minimising tardiness and idle time by simulated annealing.
Int. J. Manuf. Technol. Manag., 2005

A computer simulation model for job shop scheduling problems minimizing makespan.
Comput. Ind. Eng., 2005

Optimal scheduling for a single machine to minimize the sum of maximum earliness and tardiness considering idle insert.
Appl. Math. Comput., 2005

A hybrid method for solving stochastic job shop scheduling problems.
Appl. Math. Comput., 2005

Solving a dynamic cell formation problem using metaheuristics.
Appl. Math. Comput., 2005

Solving a Dynamic Cell Formation Problem with Machine Cost and Alternative Process Plan by Memetic Algorithms.
Proceedings of the Stochastic Algorithms: Foundations and Applications, 2005


  Loading...