Reza Ramezanian

Orcid: 0000-0001-7013-7713

According to our database1, Reza Ramezanian authored at least 22 papers between 2009 and 2024.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2024
A stochastic bi-objective project scheduling model under failure of activities.
Ann. Oper. Res., July, 2024

On the availability and changeover cases of the general lot-sizing and scheduling problem with maintenance modelling: a Lagrangian-based heuristic approach.
Oper. Res., June, 2024

A novel bi-objective model for sustainable and efficient airport logistics management: A case study on Copenhagen airport.
Comput. Ind. Eng., 2024

2022
Solving a parallel-line capacitated lot-sizing and scheduling problem with sequence-dependent setup time/cost and preventive maintenance by a rolling horizon method.
Comput. Ind. Eng., 2022

2021
Integration of multi-product supply chain network design and assembly line balancing.
Oper. Res., 2021

Hybrid evolutionary algorithms and Lagrangian relaxation for multi-period star hub median problem considering financial and service quality issues.
Eng. Appl. Artif. Intell., 2021

Simulation-based priority rules for the stochastic resource-constrained net present value and risk problem.
Comput. Ind. Eng., 2021

2020
Green parallel machines scheduling problem: A bi-objective model and a heuristic algorithm to obtain Pareto frontier.
J. Oper. Res. Soc., 2020

Mean-conditional value at risk model for the stochastic project scheduling problem.
Comput. Ind. Eng., 2020

Integration of carrier selection and supplier selection problem in humanitarian logistics.
Comput. Ind. Eng., 2020

2019
Green permutation flowshop scheduling problem with sequence-dependent setup times: a case study.
Int. J. Prod. Res., 2019

Estimation of the profiles in posteriori ELECTRE TRI: A mathematical programming model.
Comput. Ind. Eng., 2019

An integrated framework of genetic network programming and multi-layer perceptron neural network for prediction of daily stock return: An application in Tehran stock exchange market.
Appl. Soft Comput., 2019

2018
Multi-period and multi-resource operating room scheduling under uncertainty: A case study.
Comput. Ind. Eng., 2018

Trade-off between the costs and the fairness for a collaborative production planning problem in make-to-order manufacturing.
Comput. Ind. Eng., 2018

An efficient hybrid genetic algorithm for multi-product competitive supply chain network design with price-dependent demand.
Appl. Soft Comput., 2018

2016
A stable reactive approach in dynamic flexible flow shop scheduling with unexpected disruptions: A case study.
Comput. Ind. Eng., 2016

A tri-level covering fortification model for facility protection against disturbance in r-interdiction median problem.
Comput. Ind. Eng., 2016

2015
Modeling and solving multi-objective mixed-model assembly line balancing and worker assignment problem.
Comput. Ind. Eng., 2015

2013
Integrated lot-sizing and scheduling with overlapping for multi-level capacitated production system.
Int. J. Comput. Integr. Manuf., 2013

2012
An aggregate production planning model for two phase production systems: Solving with genetic algorithm and tabu search.
Expert Syst. Appl., 2012

2009
Comments on "Scheduling jobs on a <i>k</i>-stage flexible flow-shop" [Annals of Operations Research (2008) 164: 29-40].
Ann. Oper. Res., 2009


  Loading...