Rasaratnam Logendran

According to our database1, Rasaratnam Logendran authored at least 22 papers between 1986 and 2022.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2022
An efficient model-based branch-and-price algorithm for unrelated-parallel machine batching and scheduling problems.
J. Sched., 2022

2018
Lower bound development in a flow shop electronic assembly problem with carryover sequence-dependent setup time.
Comput. Ind. Eng., 2018

2017
An Enhanced tabu search algorithm to minimize a bi-criteria objective in batching and scheduling problems on unrelated-parallel machines with desired lower bounds on batch sizes.
Comput. Oper. Res., 2017

A bi-objective batch processing problem with dual-resources on unrelated-parallel machines.
Appl. Soft Comput., 2017

2013
Bi-criteria group scheduling with sequence-dependent setup time in a flow shop.
J. Oper. Res. Soc., 2013

Non-permutation flowshop scheduling with dual resources.
Expert Syst. Appl., 2013

Carryover sequence-dependent group scheduling with the integration of internal and external setup times.
Eur. J. Oper. Res., 2013

A single machine carryover sequence-dependent group scheduling in PCB manufacturing.
Comput. Oper. Res., 2013

2012
Scheduling jobs in flowshops with the introduction of additional machines in the future.
Expert Syst. Appl., 2012

Sequence-dependent group scheduling problem on unrelated-parallel machines.
Expert Syst. Appl., 2012

2010
Group-scheduling problems in electronics manufacturing.
J. Sched., 2010

Total flow time minimization in a flowshop sequence-dependent group scheduling problem.
Comput. Oper. Res., 2010

2007
A mathematical programming-based scheduling framework for multitasking environments.
Eur. J. Oper. Res., 2007

Scheduling unrelated parallel machines with sequence-dependent setups.
Comput. Oper. Res., 2007

2006
Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups.
Comput. Oper. Res., 2006

2003
Design of manufacturing cells in the presence of alternative cell locations and material transporters.
J. Oper. Res. Soc., 2003

2000
Machine duplication and part subcontracting in the presence of alternative cell locations in manufacturing cell design.
J. Oper. Res. Soc., 2000

1997
A methodology for simultaneously dealing with machine duplication and part subcontracting in cellular manufacturing systems.
Comput. Oper. Res., 1997

1995
Modified production switching heuristics for aggregate production planning.
Comput. Oper. Res., 1995

1988
Uncapacitated plant location-allocation problems with price sensitive stochastic demands.
Comput. Oper. Res., 1988

1986
Waste-water treatment: Design and optimization using nonlinear search techniques.
Comput. Oper. Res., 1986

Program planning and development of a national university teleconference network using simulation.
Proceedings of the 18th conference on Winter simulation, 1986


  Loading...