Rafael Pastor
Orcid: 0000-0002-6188-4458Affiliations:
- Technical University of Catalonia, Barcelona, Spain
According to our database1,
Rafael Pastor
authored at least 56 papers
between 2002 and 2024.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
Online presence:
-
on orcid.org
On csauthors.net:
Bibliography
2024
Matheuristics for scheduling of maintenance service with linear operation cost and step function maintenance cost.
Eur. J. Oper. Res., 2024
Heuristic and metaheuristic procedures for the Parallel Assembly Lines Balancing Problem with multi-line workstations and buffer sizing.
Comput. Oper. Res., 2024
2023
Heuristic and metaheuristic procedures for the buffer sizing problem in parallel assembly lines balancing problem with multi-line workstations and different cycle times.
Comput. Oper. Res., September, 2023
MILP model for the mid-term production planning in a chemical company with non-constant consumption of raw materials. An industrial application.
Comput. Chem. Eng., September, 2023
2022
Methodology for integrated multicriteria decision-making with uncertainty: Extending the compromise ranking method for uncertain evaluation of alternatives.
Fuzzy Sets Syst., 2022
A multi-objective optimization approach for the design of stand-alone electrification systems based on renewable energies.
Expert Syst. Appl., 2022
Multi-manned assembly line balancing problem with dependent task times: a heuristic based on solving a partition problem with constraints.
Eur. J. Oper. Res., 2022
Multicriteria analysis of renewable-based electrification projects in developing countries.
Ann. Oper. Res., 2022
2020
2019
A multistage graph-based procedure for solving a just-in-time flexible job-shop scheduling problem with machine and time-dependent processing costs.
J. Oper. Res. Soc., 2019
2018
Solving the accessibility windows assembly line problem level 1 and variant 1 (AWALBP-L1-1) with precedence constraints.
Eur. J. Oper. Res., 2018
2017
The multi-objective assembly line worker integration and balancing problem of type-2.
Comput. Oper. Res., 2017
2016
Hybrid metaheuristics for the Accessibility Windows Assembly Line Balancing Problem Level 2 (AWALBP-L2).
Eur. J. Oper. Res., 2016
Comput. Oper. Res., 2016
2015
Metaheuristic procedures for the lexicographic bottleneck assembly line balancing problem.
J. Oper. Res. Soc., 2015
Heuristics and simulated annealing procedures for the accessibility windows assembly line problem level 1 (AWALBP-L1).
Comput. Oper. Res., 2015
Technical Note: Relating to the Parameter Values Given by Nelder and Mead in their Algorithm.
Comput. J., 2015
2014
Combining matheuristics and MILP to solve the accessibility windows assembly line balancing problem level 2 (AWALBP-L2).
Comput. Oper. Res., 2014
2013
J. Sched., 2013
Technical note: a systematic procedure based on CALIBRA and the Nelder & Mead algorithm for fine-tuning metaheuristics.
J. Oper. Res. Soc., 2013
A MILP model to design hybrid wind-photovoltaic isolated rural electrification projects in developing countries.
Eur. J. Oper. Res., 2013
Comput. Ind. Eng., 2013
2011
Designing greedy algorithms for the flow-shop problem by means of Empirically Adjusted Greedy Heuristics (EAGH).
J. Oper. Res. Soc., 2011
J. Glob. Optim., 2011
Eur. J. Oper. Res., 2011
2010
Fine-tuning a parametric Clarke and Wright heuristic by means of EAGH (empirically adjusted greedy heuristics).
J. Oper. Res. Soc., 2010
Int. J. Manuf. Technol. Manag., 2010
J. Heuristics, 2010
Corrigendum to "Balancing and scheduling tasks in assembly lines with sequence-dependent setup" [European Journal of Operational Research 187 (2008) 1212-1223].
Eur. J. Oper. Res., 2010
Eur. J. Oper. Res., 2010
Eur. J. Oper. Res., 2010
2009
An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem.
J. Heuristics, 2009
Scheduling production of multiple part-types in a system with pre-known demands and deterministic inactive time intervals.
Eur. J. Oper. Res., 2009
Planning production using mathematical programming: The case of a woodturning company.
Comput. Oper. Res., 2009
Comput. Oper. Res., 2009
A Parametric Multi-start Algorithm for Solving the Response Time Variability Problem.
Proceedings of the Large-Scale Scientific Computing, 7th International Conference, 2009
2008
J. Heuristics, 2008
Selecting and adapting weekly work schedules with working time accounts: A case of a retail clothing chain.
Eur. J. Oper. Res., 2008
Balancing and scheduling tasks in assembly lines with sequence-dependent setup times.
Eur. J. Oper. Res., 2008
Solving the Response Time Variability Problem by means of Multi-start and GRASP metaheuristics.
Proceedings of the Artificial Intelligence Research and Development, 2008
2007
Eur. J. Oper. Res., 2007
Planning annualised hours with a finite set of weekly working hours and cross-trained workers.
Eur. J. Oper. Res., 2007
Ann. Oper. Res., 2007
Proceedings of the Computational Science and Its Applications, 2007
2006
The ASALB Problem with Processing Alternatives Involving Different Tasks: Definition, Formalization and Resolution.
Proceedings of the Computational Science and Its Applications, 2006
Proceedings of the Artificial Intelligence Research and Development, 2006
Heuristic Methods to Solve the Alternative Subgraphs Assembly Line Balancing Problem.
Proceedings of the 2006 IEEE International Conference on Automation Science and Engineering, 2006
2005
J. Oper. Res. Soc., 2005
2004
Characteristics and classification of the annualised working hours planning problems.
Int. J. Serv. Technol. Manag., 2004
Planning Annualised Hours with a Finite Set of Weekly Working Hours and Joint Holidays.
Ann. Oper. Res., 2004
2002
Tabu search algorithms for an industrial multi-product and multi-objective assembly line balancing problem, with reduction of the task dispersion.
J. Oper. Res. Soc., 2002