Pierre Lopez
Orcid: 0000-0003-0413-3188
According to our database1,
Pierre Lopez
authored at least 57 papers
between 1991 and 2024.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
On csauthors.net:
Bibliography
2024
Large neighborhood search for an aeronautical assembly line time-constrained scheduling problem with multiple modes and a resource leveling objective.
Ann. Oper. Res., July, 2024
Proceedings of the 13th International Conference on Operations Research and Enterprise Systems, 2024
2023
Logic-based Benders decomposition for the preemptive flexible job-shop scheduling problem.
Comput. Oper. Res., April, 2023
Heuristic and metaheuristic methods for the multi-skill project scheduling problem with partial preemption.
Int. Trans. Oper. Res., 2023
Hybrid Methods to Solve the Two-Stage Robust Flexible Job-Shop Scheduling Problem with Budgeted Uncertainty.
Proceedings of the 12th International Conference on Operations Research and Enterprise Systems, 2023
Constraint Programming for the Robust Two-Machine Flow-Shop Scheduling Problem with Budgeted Uncertainty.
Proceedings of the Integration of Constraint Programming, Artificial Intelligence, and Operations Research, 2023
Proceedings of the 29th International Conference on Principles and Practice of Constraint Programming, 2023
2022
Proceedings of the Thirty-First International Joint Conference on Artificial Intelligence, 2022
2020
Mixed-integer/linear and constraint programming approaches for activity scheduling in a nuclear research facility.
Int. J. Prod. Res., 2020
Direct estimation of fetal head circumference from ultrasound images based on regression CNN.
Proceedings of the International Conference on Medical Imaging with Deep Learning, 2020
2019
Polyhedral results and valid inequalities for the continuous energy-constrained scheduling problem.
Discret. Appl. Math., 2019
A Heuristic Method for the Multi-skill Project Scheduling Problem with Partial Preemption.
Proceedings of the 8th International Conference on Operations Research and Enterprise Systems, 2019
2017
Future Gener. Comput. Syst., 2017
Cumulative scheduling with variable task profiles and concave piecewise linear processing rate functions.
Constraints An Int. J., 2017
2016
Energetic reasoning and mixed-integer linear programming for scheduling with a continuous resource and linear efficiency functions.
OR Spectr., 2016
Scheduling under a non-reversible energy source: An application of piecewise linear bounding of non-linear demand/cost functions.
Discret. Appl. Math., 2016
2015
J. Sched., 2015
A multi-objective local search heuristic for scheduling Earth observations taken by an agile satellite.
Eur. J. Oper. Res., 2015
Constraints An Int. J., 2015
A hybrid exact method for a scheduling problem with a continuous resource and energy constraints.
Constraints An Int. J., 2015
The Truck Scheduling Problem at Crossdocking Terminals - Exclusive versus Mixed Mode.
Proceedings of the ICORES 2015, 2015
2013
Int. J. Comput. Integr. Manuf., 2013
A note on "event-based MILP models for resource-constrained project scheduling problems".
Comput. Oper. Res., 2013
Comput. Ind. Eng., 2013
Next-Generation Microwave Packet Radio: Characteristics and Evolution Areas to Support New Scenarios in Wireless Backhauling.
Bell Labs Tech. J., 2013
A Combinatorial Optimization Approach for the Electrical Energy Management in a Multi-source System.
Proceedings of the ICORES 2013, 2013
Biased Random Key Genetic Algorithm with Hybrid Decoding for Multi-objective Optimization.
Proceedings of the 2013 Federated Conference on Computer Science and Information Systems, 2013
Proceedings of the Recent Advances in Computational Optimization, 2013
2012
Weight-based Heuristics for Constraint Satisfaction and Combinatorial Optimization Problems.
J. Math. Model. Algorithms, 2012
Scheduler-oriented algorithms to improve human-machine cooperation in transportation scheduling support systems.
Eng. Appl. Artif. Intell., 2012
Multi-objective Optimization for Selecting and Scheduling Observations by Agile Earth Observing Satellites.
Proceedings of the Parallel Problem Solving from Nature - PPSN XII, 2012
Complete Characterization of Near-Optimal Sequences for the Two-Machine Flow Shop Scheduling Problem.
Proceedings of the Integration of AI and OR Techniques in Contraint Programming for Combinatorial Optimzation Problems, 2012
Proceedings of the Principles and Practice of Constraint Programming, 2012
2011
RAIRO Oper. Res., 2011
Generalized disjunctive constraint propagation for solving the job shop problem with time lags.
Eng. Appl. Artif. Intell., 2011
Comput. Oper. Res., 2011
Project scheduling under resource constraints: Application of the cumulative global constraint in a decision support framework.
Comput. Ind. Eng., 2011
Comput. Ind. Eng., 2011
Proceedings of the IEEE 16th Conference on Emerging Technologies & Factory Automation, 2011
Climbing Depth-Bounded Adjacent Discrepancy Search for Solving Hybrid Flow Shop Scheduling Problems with Multiprocessor Tasks.
Proceedings of the Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems, 2011
2010
Electron. Notes Discret. Math., 2010
Comput. Oper. Res., 2010
Comput. Oper. Res., 2010
Proceedings of the 11th IFAC/IFIP/IFORS/IEA Symposium on Analysis, Design, and Evaluation of Human-Machine Systems (2010), Valenciennes, France, August 31, 2010
2007
Proceedings of the Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems, 2007
2005
Schedule Generation Schemes for the Job-Shop Problem with Sequence-Dependent Setup Times: Dominance Properties and Computational Analysis.
Ann. Oper. Res., 2005
2003
Approche par contraintes des problèmes d'ordonnancement et d'affectation : structures temporelles et mécanismes de propagation. (A Constraint-based Approach for Scheduling and Allocation: Temporal Structures and Propagation Mechanisms).
, 2003
2001
A backtracking algorithm for solving mixed task scheduling and resource allocation problems.
Proceedings of 8th IEEE International Conference on Emerging Technologies and Factory Automation, 2001
2000
Discussion on: 'Solving Transient Scheduling Problems with Constraint Programming' by O. Korbaa, P. Yim, and J.-C. Gentina.
Eur. J. Control, 2000
1999
Décomposition temporelle et caractérisation de solutions admissibles pour le problème d'ordonnancement à une machine.
RAIRO Oper. Res., 1999
1997
IEEE Expert, 1997
1996
Int. J. Syst. Sci., 1996
1995
Approche par contraintes : application à un problème de gestion de production.
Proceedings of the JFPLC'95, 1995
1991
Approche énergétique pour l'ordonnancement de tâches sous contraintes de temps et de ressources. (Energy-based approach for task scheduling under time and resource constraints).
PhD thesis, 1991