Peng-Jen Lai

According to our database1, Peng-Jen Lai authored at least 17 papers between 2008 and 2016.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2016
Some single-machine scheduling problems with elapsed-time-based and position-based learning and forgetting effects.
Discret. Optim., 2016

2015
Using heuristic algorithms to solve the scheduling problems with job-dependent and machine-dependent learning effects.
J. Intell. Manuf., 2015

2014
Single-machine scheduling with accelerating deterioration effects.
Optim. Lett., 2014

Parallel-machine scheduling to minimize makespan with fuzzy processing times and learning effects.
Inf. Sci., 2014

2012
Single-machine scheduling with logarithm deterioration.
Optim. Lett., 2012

Modified genetic algorithms for solving fuzzy flow shop scheduling problems and their implementation with CUDA.
Expert Syst. Appl., 2012

2011
Scheduling problems with general effects of deterioration and learning.
Inf. Sci., 2011

An evolutionary approach for multi-objective optimization of the integrated location-inventory distribution network problem in vendor-managed inventory.
Expert Syst. Appl., 2011

Some single-machine and flowshop scheduling problems with a non-linear deterioration function.
Comput. Math. Appl., 2011

Evaluate the fuzzy completion times in the fuzzy flow shop scheduling problems using the virus-evolutionary genetic algorithms.
Appl. Soft Comput., 2011

2010
Erratum to 'Some single-machine and m-machine flowshop scheduling problems with learning considerations' [Inform. Sci. 179(2009) 3885-3892].
Inf. Sci., 2010

Single-machine scheduling with a nonlinear deterioration function.
Inf. Process. Lett., 2010

Erratum to 'Single-machine and flowshop scheduling with a general learning effect model' [Computers & Industrial Engineering 56 (2009) 1553-1558].
Comput. Ind. Eng., 2010

2009
Single-machine scheduling with sum-of-logarithm-processing-times-based learning considerations.
Inf. Sci., 2009

Using Ant Colony Optimization to minimize the Fuzzy makespan and Total Weighted Fuzzy Completion Time in Flow Shop Scheduling Problems.
Int. J. Uncertain. Fuzziness Knowl. Based Syst., 2009

2008
Using Genetic Algorithms to Solve Fuzzy Flow Shop Scheduling Problems Based on Possibility and Necessity Measures.
Int. J. Uncertain. Fuzziness Knowl. Based Syst., 2008

Tardiness in Fuzzy Flow Shop Scheduling Problems Based on Possibility and Necessity Measures.
Proceedings of the Eighth International Conference on Intelligent Systems Design and Applications, 2008


  Loading...