Parviz Fattahi
Orcid: 0000-0003-3039-2220
According to our database1,
Parviz Fattahi
authored at least 18 papers
between 2007 and 2024.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
Online presence:
-
on orcid.org
On csauthors.net:
Bibliography
2024
Two-stage approach for COVID-19 vaccine supply chain network under uncertainty using the machine learning algorithms: A case study.
Eng. Appl. Artif. Intell., 2024
2022
Dynamic maximal covering location problem for fire stations under uncertainty: soft-computing approaches.
Int. J. Syst. Assur. Eng. Manag., 2022
2021
Mathematical modeling and two efficient branch and bound algorithms for job shop scheduling problem followed by an assembly stage.
Kybernetes, 2021
Minimizing maximum tardiness on a single machine with family setup times and machine disruption.
Comput. Oper. Res., 2021
A multi-objective parameter-tuned soft computing-based algorithm to optimize competitive congested location-pricing problem within multi-type service.
Array, 2021
2020
Mixed-integer linear programming model for tree-like pipeline scheduling problem with intermediate due dates on demands.
Oper. Res., 2020
2016
A biogeography-based optimisation algorithm for a realistic no-wait hybrid flow shop with unrelated parallel machines to minimise mean tardiness.
Int. J. Comput. Integr. Manuf., 2016
Comput. Oper. Res., 2016
2015
A mathematical model and genetic algorithm to cyclic flexible job shop scheduling problem.
J. Intell. Manuf., 2015
Two hybrid tabu search-firefly algorithms for the capacitated job shop scheduling problem with sequence-dependent setup cost.
Int. J. Comput. Integr. Manuf., 2015
A bi-objective continuous review inventory control model: Pareto-based meta-heuristic algorithms.
Appl. Soft Comput., 2015
A network approach modeling of multi-echelon spare-part inventory system with backorders and quantity discount.
Ann. Oper. Res., 2015
2014
Multi-objective assembly permutation flow shop scheduling problem: a mathematical model and a meta-heuristic algorithm.
J. Oper. Res. Soc., 2014
2013
Integrated lot-sizing and scheduling with overlapping for multi-level capacitated production system.
Int. J. Comput. Integr. Manuf., 2013
2012
J. Intell. Manuf., 2012
Cost-oriented two-sided assembly line balancing problem: A simulated annealing approach.
Int. J. Comput. Integr. Manuf., 2012
2007
Mathematical modeling and heuristic approaches to flexible job shop scheduling problems.
J. Intell. Manuf., 2007