Oussama Ben Ammar

Orcid: 0000-0002-1428-6199

According to our database1, Oussama Ben Ammar authored at least 23 papers between 2013 and 2024.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2024
An overview on human-centred technologies, measurements and optimisation in assembly systems.
Int. J. Prod. Res., 2024

Simultaneous Backward Reduction algorithm for disassembly lot-sizing under random ordering lead time.
Proceedings of the 10th International Conference on Control, 2024

Bi-Objective Multi-Period Multi-Sourcing Supply Planning with Stochastic Lead-Times, Degressive Pricing, and Carbon Footprint<sup>*</sup>.
Proceedings of the 10th International Conference on Control, 2024

Supplier Selection Considering Flexibility, Order Splitting, and Uncertainty of lead times.
Proceedings of the 10th International Conference on Control, 2024

2023
An overview of approaches and methodologies for supporting smallholders: ICT tools, blockchain, business models, sustainability indicators, simulation models.
Proceedings of the 4th International Conference on Industry 4.0 and Smart Manufacturing (ISM 2023), 2023

Advancing human-robot interaction in a manufacturing environment by incorporating hand movements for remote control.
Proceedings of the IEEE International Conference on Networking, Sensing and Control, 2023

Small-Producer Selection and Order Allocation in the Agri-Food Supply Chain.
Proceedings of the IEEE International Conference on Networking, Sensing and Control, 2023

2022
Robust optimization approaches for purchase planning with supplier selection under lead time uncertainty.
Eur. J. Oper. Res., 2022

Stochastic program for disassembly lot-sizing under uncertain component refurbishing lead times.
Eur. J. Oper. Res., 2022

2021
Mid-term redeployment of capacity of rescue centers considering the optimism of the decision maker.
INFOR Inf. Syst. Oper. Res., 2021

Genetic algorithm and Monte Carlo simulation for a stochastic capacitated disassembly lot-sizing problem under random lead times.
Comput. Ind. Eng., 2021

A Model for a Multi-level Disassembly System Under Random Disassembly Lead Times.
Proceedings of the Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, 2021

Resilient Project Scheduling Using Artificial Intelligence: A Conceptual Framework.
Proceedings of the Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, 2021

Multi-period Multi-sourcing Supply Planning with Stochastic Lead-Times, Quantity-Dependent Pricing, and Delivery Flexibility Costs.
Proceedings of the Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems, 2021

2020
Integrated production planning and quality control for linear production systems under uncertainties of cycle time and finished product quality.
Int. J. Prod. Res., 2020

A hybrid genetic algorithm for a multilevel assembly replenishment planning problem with stochastic lead times.
Comput. Ind. Eng., 2020

Maintenance with Production Planning Constraints in Semiconductor Manufacturing.
Proceedings of the Winter Simulation Conference, 2020

A Stochastic Model for a Two-Level Disassembly Lot-Sizing Problem Under Random Lead Time.
Proceedings of the Advances in Production Management Systems. The Path to Digital Transformation and Innovation of Production Management Systems, 2020

2018
Optimal order release dates for two-level assembly systems with stochastic lead times at each level.
Int. J. Prod. Res., 2018

2014
Reducing the Research Space of Possible Order Release Dates for Multi-level Assembly Systems under Stochastic Lead Times.
Proceedings of the Advances in Production Management Systems. Innovative and Knowledge-Based Production Management in a Global-Local World, 2014

2013
Analysis Method of the Relations between MRP Parameter and Performance Indicator Based on a Literature Review.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

Mathematical Model for Supply Planning of Multi-Level Assembly Systems with Stochastic Lead Times.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013

Supply Planning and Inventory Control under Lead Time Uncertainty: A Review.
Proceedings of the 7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013


  Loading...