Ömer Faruk Yilmaz

Orcid: 0000-0002-6202-4011

According to our database1, Ömer Faruk Yilmaz authored at least 13 papers between 2017 and 2024.

Collaborative distances:

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2024
Aggregated planning to solve multi-product multi-period disassembly line balancing problem by considering multi-manned stations: A generic optimization model and solution algorithms.
Comput. Ind. Eng., 2024

2023
Lot streaming in workforce scheduling problem for seru production system under Shojinka philosophy.
Comput. Ind. Eng., November, 2023

2022
Lot streaming in hybrid flowshop scheduling problem by considering equal and consistent sublots under machine capability and limited waiting time constraint.
Comput. Ind. Eng., 2022

Tactical level strategies for multi-objective disassembly line balancing problem with multi-manned stations: an optimization model and solution approaches.
Ann. Oper. Res., 2022

An integrated bi-objective U-shaped assembly line balancing and parts feeding problem: optimization model and exact solution method.
Ann. Math. Artif. Intell., 2022

2021
Robust optimisation for ripple effect on reverse supply chain: an industrial case study.
Int. J. Prod. Res., 2021

2020
Operational strategies for seru production system: a bi-objective optimisation model and solution methods.
Int. J. Prod. Res., 2020

Lean holistic fuzzy methodology employing cross-functional worker teams for new product development projects: A real case study from high-tech industry.
Eur. J. Oper. Res., 2020

Attaining flexibility in seru production system by means of Shojinka: An optimization model and solution approaches.
Comput. Oper. Res., 2020

Examining additive manufacturing in supply chain context through an optimization model.
Comput. Ind. Eng., 2020

AUGMECON2 Method for a Bi-objective U-Shaped Assembly Line Balancing Problem.
Proceedings of the Learning and Intelligent Optimization - 14th International Conference, 2020

2018
Automated Management and Control of a Multi-Vendor Disaggregated Network at the L0 Layer.
Proceedings of the Optical Fiber Communications Conference and Exposition, 2018

2017
Minimizing average lead time for the coordinated scheduling problem in a two-stage supply chain with multiple customers and multiple manufacturers.
Comput. Ind. Eng., 2017


  Loading...