Ömer Faruk Yilmaz
Orcid: 0000-0002-6202-4011
According to our database1,
Ömer Faruk Yilmaz
authored at least 13 papers
between 2017 and 2024.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
On csauthors.net:
Bibliography
2024
Aggregated planning to solve multi-product multi-period disassembly line balancing problem by considering multi-manned stations: A generic optimization model and solution algorithms.
Comput. Ind. Eng., 2024
2023
Lot streaming in workforce scheduling problem for seru production system under Shojinka philosophy.
Comput. Ind. Eng., November, 2023
2022
Lot streaming in hybrid flowshop scheduling problem by considering equal and consistent sublots under machine capability and limited waiting time constraint.
Comput. Ind. Eng., 2022
Tactical level strategies for multi-objective disassembly line balancing problem with multi-manned stations: an optimization model and solution approaches.
Ann. Oper. Res., 2022
An integrated bi-objective U-shaped assembly line balancing and parts feeding problem: optimization model and exact solution method.
Ann. Math. Artif. Intell., 2022
2021
Robust optimisation for ripple effect on reverse supply chain: an industrial case study.
Int. J. Prod. Res., 2021
2020
Operational strategies for seru production system: a bi-objective optimisation model and solution methods.
Int. J. Prod. Res., 2020
Lean holistic fuzzy methodology employing cross-functional worker teams for new product development projects: A real case study from high-tech industry.
Eur. J. Oper. Res., 2020
Attaining flexibility in seru production system by means of Shojinka: An optimization model and solution approaches.
Comput. Oper. Res., 2020
Examining additive manufacturing in supply chain context through an optimization model.
Comput. Ind. Eng., 2020
Proceedings of the Learning and Intelligent Optimization - 14th International Conference, 2020
2018
Automated Management and Control of a Multi-Vendor Disaggregated Network at the L0 Layer.
Proceedings of the Optical Fiber Communications Conference and Exposition, 2018
2017
Minimizing average lead time for the coordinated scheduling problem in a two-stage supply chain with multiple customers and multiple manufacturers.
Comput. Ind. Eng., 2017