Norbert Trautmann
Orcid: 0000-0003-0951-6567
According to our database1,
Norbert Trautmann
authored at least 33 papers
between 2000 and 2024.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
Online presence:
-
on orcid.org
On csauthors.net:
Bibliography
2024
MIP-based solution approaches for multi-site resource-constrained project scheduling.
Ann. Oper. Res., June, 2024
Mixed-integer linear programming for project scheduling under various resource constraints.
Eur. J. Oper. Res., 2024
2023
Workload-based Extensions of Mixed-integer Programming Models for Resource-constrained Project Scheduling.
Proceedings of the IEEE International Conference on Industrial Engineering and Engineering Management, 2023
Proceedings of the IEEE International Conference on Industrial Engineering and Engineering Management, 2023
2020
An Order-First Split-Second Approach to a Novel Variant of the Cardinality-Constrained Covering Traveling Salesperson Problem.
Proceedings of the IEEE International Conference on Industrial Engineering and Engineering Management, 2020
2019
Comput. Oper. Res., 2019
Two continuous-time assignment-based models for the multi-mode resource-constrained project scheduling problem.
Comput. Ind. Eng., 2019
Proceedings of the 2019 IEEE International Conference on Industrial Engineering and Engineering Management, 2019
A Continuous-Time Mixed-Binary Linear Programming Formulation for the Multi-Site Resource-Constrained Project Scheduling Problem.
Proceedings of the 2019 IEEE International Conference on Industrial Engineering and Engineering Management, 2019
2018
J. Sched., 2018
A Continuous-Time Unit-Based MILP Formulation for the Resource-Constrained Project Scheduling Problem.
Proceedings of the 2018 IEEE International Conference on Industrial Engineering and Engineering Management, 2018
A Continuous-Time MILP Formulation for the Multi-Mode Resource-Constrained Project Scheduling Problem.
Proceedings of the 2018 IEEE International Conference on Industrial Engineering and Engineering Management, 2018
2017
Proceedings of the 2017 IEEE Congress on Evolutionary Computation, 2017
2016
Proceedings of 5th the International Conference on Operations Research and Enterprise Systems (ICORES 2016), 2016
2015
On an application of Microsoft Excel's evolutionary solver to the resource-constrained project scheduling problem RCPSP.
Proceedings of the 2015 IEEE International Conference on Industrial Engineering and Engineering Management, 2015
2014
A mixed-integer linear programming approach to the optimization of event-bus schedules: a scheduling application in the tourism sector.
J. Sched., 2014
A hybrid method for large-scale short-term scheduling of make-and-pack production processes.
Eur. J. Oper. Res., 2014
Efficient symmetry-breaking formulations for grouping customer orders in a printing shop.
Proceedings of the 2014 IEEE International Conference on Industrial Engineering and Engineering Management, 2014
2013
Proceedings of the Operations Research Proceedings 2013, 2013
2011
A serial scheme for minimizing the duration of resource-constrained projects within Microsoft Project.
Proceedings of the 2011 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 2011
Proceedings of the 2011 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 2011
2010
Eur. J. Oper. Res., 2010
2009
J. Sched., 2009
2006
Proceedings of the Operations Research, 2006
2005
Scheduling of continuous and discontinuous material flows with intermediate storage restrictions.
Eur. J. Oper. Res., 2005
Proceedings of the Operations Research Proceedings 2005, 2005
2004
Proceedings of the Handbook of Scheduling - Algorithms, Models, and Performance Analysis., 2004
2002
OR Spectr., 2002
Proceedings of the Operations Research Proceedings 2002, 2002
2001
2000
Batch scheduling in process industries: an application of resource-constrained project scheduling.
OR Spectr., 2000