Nasser Salmasi

According to our database1, Nasser Salmasi authored at least 9 papers between 2006 and 2020.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2020
Operating room scheduling problem under uncertainty: Application of continuous phase-type distributions.
IISE Trans., 2020

2015
Flexible flowline scheduling problem with constraints for the beginning and terminating time of processing of jobs at stages.
Int. J. Comput. Integr. Manuf., 2015

Minimizing total completion time in the flexible flowshop sequence-dependent group scheduling problem.
Ann. Oper. Res., 2015

2014
Parallel machine scheduling problem with preemptive jobs and transportation delay.
Comput. Oper. Res., 2014

2013
Stochastic scheduling with minimizing the number of tardy jobs using chance constrained programming.
Math. Comput. Model., 2013

Minimization of weighted earliness and tardiness for no-wait sequence-dependent setup times flowshop scheduling problem.
Comput. Ind. Eng., 2013

2010
Total flow time minimization in a flowshop sequence-dependent group scheduling problem.
Comput. Oper. Res., 2010

2007
Bicriteria two-machine flowshop scheduling using metaheuristics.
Proceedings of the Genetic and Evolutionary Computation Conference, 2007

2006
Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups.
Comput. Oper. Res., 2006


  Loading...