Nashwan Dawood
Orcid: 0000-0002-4873-7576
According to our database1,
Nashwan Dawood
authored at least 34 papers
between 2002 and 2023.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
On csauthors.net:
Bibliography
2023
SPECIAL ISSUE EDITORIAL: The future of construction in the context of digital transformation (CONVR 2022).
J. Inf. Technol. Constr., 2023
2021
Bridging the gap between theory and practice for adopting meaningful collaborative BIM processes in infrastructure projects, utilising multi-criteria decision making (MCDM).
J. Inf. Technol. Constr., 2021
J. Inf. Technol. Constr., 2021
Special issue editorial - Construction 4.0: Established and emerging digital technologies within the construction industry.
J. Inf. Technol. Constr., 2021
J. Inf. Technol. Constr., 2021
Proceedings of the Human Aspects of IT for the Aged Population. Technology Design and Acceptance, 2021
2019
J. Inf. Technol. Constr., 2019
2016
Supporting building owners and facility managers in the validation and visualisation of asset information models (AIM) through open standards and open technologies.
J. Inf. Technol. Constr., 2016
Proceedings of the Smart Grid Inspired Future Technologies, 2016
2015
BIM for facilities management: evaluating BIM standards in asset register creation and service life.
J. Inf. Technol. Constr., 2015
Investigating the Potential of Delivering Employer Information Requirements in BIM Enabled Construction Projects in Qatar.
Proceedings of the Product Lifecycle Management in the Era of Internet of Things, 2015
2014
J. Inf. Technol. Constr., 2014
Construction health and safety training: the utilisation of 4D enabled serious games.
J. Inf. Technol. Constr., 2014
Development of workspace conflict visualization system using 4D object of work schedule.
Adv. Eng. Informatics, 2014
2013
Int. J. Bus. Perform. Supply Chain Model., 2013
2012
Simulation-based genetic algorithms for construction supply chain management: Off-site precast concrete production as a case study.
OR Insight, 2012
A wireless sensor network for intelligent building energy management based on multi communication standards - a case study.
J. Inf. Technol. Constr., 2012
Construction workspace management: the development and application of a novel nD planning approach and tool.
J. Inf. Technol. Constr., 2012
Incorporating H&S into Design and Construction: The Case for Integrating Serious Games Engines Technologies and 4D Planning for Collaborative Work.
Proceedings of the Cooperative Design, Visualization, and Engineering, 2012
2011
A structured methodology for enterprise modeling: a case study for modeling the operation of a british organization.
J. Inf. Technol. Constr., 2011
2010
A framework and decision support system to increase building life cycle energy performance.
J. Inf. Technol. Constr., 2010
Improving performance and the reliability of off-site pre-cast concrete production operations using simulation optimisation.
J. Inf. Technol. Constr., 2010
Comput. Aided Civ. Infrastructure Eng., 2010
2009
J. Inf. Technol. Constr., 2009
J. Inf. Technol. Constr., 2009
Development and Evaluation of a Tangible Terrain Representation System for Highway Route Planning.
Comput. Aided Civ. Infrastructure Eng., 2009
Development of a Visual whole Life-cycle Energy Assessment Framework for Built Environment.
Proceedings of the 2009 Winter Simulation Conference, 2009
2008
Automatic generation of progress profiles for earthwork operations using 4D visualisation model.
J. Inf. Technol. Constr., 2008
J. Inf. Technol. Constr., 2008
2006
Construction Workspace Planning: Assignment and Analysis Utilizing 4D Visualization Technologies.
Comput. Aided Civ. Infrastructure Eng., 2006
Proceedings of the Intelligent Computing in Engineering and Architecture, 2006
2005
J. Inf. Technol. Constr., 2005
2003
Multi-constraint information management and visualisation for collaborative planning and control in construction.
J. Inf. Technol. Constr., 2003
2002
CEPM 1: simulation modeling and optimization of stockyard layouts for precast concrete products.
Proceedings of the 34th Winter Simulation Conference: Exploring New Frontiers, 2002