Mostafa Zandieh

Orcid: 0000-0003-1209-9514

Affiliations:
  • Shahid Beheshti University, Department of Industrial Management, Tehran, Iran


According to our database1, Mostafa Zandieh authored at least 77 papers between 2006 and 2024.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2024
Development of Dynamic Balanced Scorecard Using Case-Based Reasoning Method and Adaptive Neuro-Fuzzy Inference System.
IEEE Trans. Engineering Management, 2024

2022
An analytical model for reliability assessment of the rail system considering dependent failures (case study of Iranian railway).
Reliab. Eng. Syst. Saf., 2022

Robust and resilient joint periodic maintenance planning and scheduling in a multi-factory network under uncertainty: A case study.
Reliab. Eng. Syst. Saf., 2022

2021
A new soft computing algorithm based on cloud theory for dynamic facility layout problem.
RAIRO Oper. Res., 2021

An integrated material-financial risk-averse resilient supply chain model with a real-world application.
Comput. Ind. Eng., 2021

A simple empirical inventory model for managing the processed corneal tissue equitably in hospitals with demand differentiation.
Comput. Appl. Math., 2021

2020
Scheduling two-stage assembly flow shop with random machines breakdowns: integrated new self-adapted differential evolutionary and simulation approach.
Soft Comput., 2020

Balancing, sequencing, and job rotation scheduling of a U-shaped lean cell with dynamic operator performance.
Comput. Ind. Eng., 2020

2019
A tuned hybrid intelligent fruit fly optimization algorithm for fuzzy rule generation and classification.
Neural Comput. Appl., 2019

Surgical case scheduling problem with fuzzy surgery time: An advanced bi-objective ant system approach.
Knowl. Based Syst., 2019

A hybrid MCDM approach for order distribution in a multiple-supplier supply chain: A case study.
J. Ind. Inf. Integr., 2019

Robust and stable flexible job shop scheduling with random machine breakdowns: multi-objectives genetic algorithm approach.
Int. J. Math. Oper. Res., 2019

A memetic algorithm with a novel neighborhood search and modified solution representation for closed-loop supply chain network design.
Comput. Ind. Eng., 2019

A Water-Flow Like Algorithm for Solving U-Shaped Assembly Line Balancing Problems.
IEEE Access, 2019

Scheduling of Virtual Cellular Manufacturing Systems: A Biogeography-Based Optimization Algorithm.
Appl. Artif. Intell., 2019

2018
Optimization redundancy allocation problem with nonexponential repairable components using simulation approach and artificial neural network.
Qual. Reliab. Eng. Int., 2018

Determination of production planning policies for different products in process industries: using discrete event simulation.
Prod. Eng., 2018

An efficient bi-objective algorithm to solve re-entrant hybrid flow shop scheduling with learning effect and setup times.
Oper. Res., 2018

CA-FCM: Towards a formal representation of expert's causal judgements over construction project changes.
Adv. Eng. Informatics, 2018

2017
Integrated production scheduling and maintenance planning in a hybrid flow shop system: a multi-objective approach.
Int. J. Syst. Assur. Eng. Manag., 2017

Maximum-weighted tree matching problem: a novel discrete invasive weed optimisation algorithm.
Int. J. Intell. Syst. Technol. Appl., 2017

Improving ABC algorithm using new search mechanisms.
Int. J. Intell. Syst. Technol. Appl., 2017

Robust bi-level optimization for green opportunistic supply chain network design problem against uncertainty and environmental risk.
Comput. Ind. Eng., 2017

A bi-level programming approach for production-distribution supply chain problem.
Comput. Ind. Eng., 2017

Flexible job shop scheduling under condition-based maintenance: Improved version of imperialist competitive algorithm.
Appl. Soft Comput., 2017

2016
Bi-objective scheduling of flexible flow lines: a gradual transition tabu search approach.
Prod. Eng., 2016

Enhanced intelligent water drops and cuckoo search algorithms for solving the capacitated vehicle routing problem.
Inf. Sci., 2016

A multi objective optimization approach for flexible job shop scheduling problem under random machine breakdown by evolutionary algorithms.
Comput. Oper. Res., 2016

2015
A hybrid spanning tree-based genetic/simulated annealing algorithm for a closed-loop logistics network design problem.
Int. J. Appl. Decis. Sci., 2015

2014
Polynomial time approximation algorithms for proportionate open-shop scheduling.
Int. Trans. Oper. Res., 2014

An Artificial Immune Algorithm for a Closed-Loop Supply Chain Network Design Problem with Different Delivery Paths.
Int. J. Strateg. Decis. Sci., 2014

Minimizing total tardiness and earliness on unrelated parallel machines with controllable processing times.
Comput. Oper. Res., 2014

2013
An imperialist competitive algorithm for multi-objective U-type assembly line design.
J. Comput. Sci., 2013

SCTTS: Scalable Cost-Time Trade-off Scheduling for Workflow Application in Grids.
KSII Trans. Internet Inf. Syst., 2013

Due-date assignment and machine scheduling in a low machine-rate situation with stochastic processing times.
Comput. Oper. Res., 2013

2012
An efficient knowledge-based algorithm for the flexible job shop scheduling problem.
Knowl. Based Syst., 2012

Vehicle routing scheduling using an enhanced hybrid optimization approach.
J. Intell. Manuf., 2012

Hybrid flowshop scheduling with sequence-dependent setup times by hybridizing max-min ant system, simulated annealing and variable neighbourhood search.
Expert Syst. J. Knowl. Eng., 2012

Multi-objective supply planning for two-level assembly systems with stochastic lead times.
Comput. Oper. Res., 2012

Simultaneous solving of balancing and sequencing problems with station-dependent assembly times for mixed-model assembly lines.
Appl. Soft Comput., 2012

Provisioning-Based Resource Management for Effective Workflow Scheduling on Utility Grids.
Proceedings of the 12th IEEE/ACM International Symposium on Cluster, 2012

2011
Bi-objective parallel machines scheduling with sequence-dependent setup times using hybrid metaheuristics and weighted min-max technique.
Soft Comput., 2011

An adaptive multi-population genetic algorithm to solve the multi-objective group scheduling problem in hybrid flexible flowshop with sequence-dependent setup times.
J. Intell. Manuf., 2011

A simulated annealing algorithm approach to hybrid flow shop scheduling with sequence-dependent setup times.
J. Intell. Manuf., 2011

Scheduling open shops with parallel machines to minimize total completion time.
J. Comput. Appl. Math., 2011

A game theory-based model for product portfolio management in a competitive market.
Expert Syst. Appl., 2011

Comparisons of some improving strategies on MOPSO for multi-objective (r, Q) inventory system.
Expert Syst. Appl., 2011

Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem.
Expert Syst. Appl., 2011

A genetic algorithm for JIT single machine scheduling with preemption and machine idle time.
Expert Syst. Appl., 2011

A hybrid multi-objective genetic algorithm for planning order release date in two-level assembly system with random lead times.
Expert Syst. Appl., 2011

A discrete colonial competitive algorithm for hybrid flowshop scheduling to minimize earliness and quadratic tardiness penalties.
Expert Syst. Appl., 2011

Meta-heuristics implementation for scheduling of trucks in a cross-docking system with temporary storage.
Expert Syst. Appl., 2011

Corrigendum to: "Genetic algorithm for supply planning in two-level assembly systems with random lead times" [Engineering Applications of Artificial Intelligence 22 (2009) 906-915].
Eng. Appl. Artif. Intell., 2011

Incorporating periodic preventive maintenance into flexible flowshop scheduling problems.
Appl. Soft Comput., 2011

Multi-objective genetic-based algorithms for a cross-docking scheduling problem.
Appl. Soft Comput., 2011

Hybrid solving algorithm for complex machine scheduling problem.
Proceedings of the 2011 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 2011

2010
A robust genetic algorithm for scheduling realistic hybrid flexible flow line problems.
J. Intell. Manuf., 2010

An artificial immune algorithm for the flexible job-shop scheduling problem.
Future Gener. Comput. Syst., 2010

Flexible job-shop scheduling with parallel variable neighborhood search algorithm.
Expert Syst. Appl., 2010

Two robust meta-heuristics for scheduling multiple job classes on a single machine with multiple criteria.
Expert Syst. Appl., 2010

Integrating non-preemptive open shops scheduling with sequence-dependent setup times using advanced metaheuristics.
Expert Syst. Appl., 2010

Bi-objective group scheduling in hybrid flexible flowshop: A multi-phase approach.
Expert Syst. Appl., 2010

An integrated eigenvector-DEA-TOPSIS methodology for portfolio risk evaluation in the FOREX spot market.
Expert Syst. Appl., 2010

Multi-objective scheduling of dynamic job shop using variable neighborhood search.
Expert Syst. Appl., 2010

Algorithms for a realistic variant of flowshop scheduling.
Comput. Oper. Res., 2010

A contribution and new heuristics for open shop scheduling.
Comput. Oper. Res., 2010

Scheduling trucks in cross-docking systems: Robust meta-heuristics.
Comput. Ind. Eng., 2010

Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flowshop.
Adv. Eng. Softw., 2010

2009
A study on integrating sequence dependent setup time flexible flow lines and preventive maintenance scheduling.
J. Intell. Manuf., 2009

Integrating simulation and genetic algorithm to schedule a dynamic flexible job shop.
J. Intell. Manuf., 2009

An improved simulated annealing for hybrid flowshops with sequence-dependent setup and transportation times to minimize total completion time and total tardiness.
Expert Syst. Appl., 2009

Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithm.
Expert Syst. Appl., 2009

A multi-phase covering Pareto-optimal front method to multi-objective scheduling in a realistic hybrid flowshop using a hybrid metaheuristic.
Expert Syst. Appl., 2009

A hybrid multi-criteria decision-making model for firms competence evaluation.
Expert Syst. Appl., 2009

Modeling and scheduling a case of flexible flowshops: Total weighted tardiness minimization.
Comput. Ind. Eng., 2009

Hybrid flexible flowshops with sequence-dependent setup times and machine availability constraints.
Comput. Ind. Eng., 2009

2006
An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times.
Appl. Math. Comput., 2006


  Loading...