Mostafa Khatami

Orcid: 0000-0001-6159-9772

According to our database1, Mostafa Khatami authored at least 11 papers between 2017 and 2024.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2024
The coupled task scheduling problem: an improved mathematical program and a new solution algorithm.
Int. Trans. Oper. Res., July, 2024

Scheduling coupled tasks on parallel identical machines.
Optim. Lett., May, 2024

2023
Flow-shop scheduling with exact delays to minimize makespan.
Comput. Ind. Eng., September, 2023

The gradual minimum covering location problem.
J. Oper. Res. Soc., April, 2023

2021
Coupled task scheduling with time-dependent processing times.
J. Sched., 2021

Four decades of research on the open-shop scheduling problem to minimize the makespan.
Eur. J. Oper. Res., 2021

A binary search algorithm for the general coupled task scheduling problem.
4OR, 2021

2020
Coupled task scheduling with exact delays: Literature review and models.
Eur. J. Oper. Res., 2020

A Relax-and-Solve Algorithm for the Ordered Flow-Shop Scheduling Problem.
Proceedings of the IEEE International Conference on Industrial Engineering and Engineering Management, 2020

2019
Makespan minimization for the <i>m</i>-machine ordered flow shop scheduling problem.
Comput. Oper. Res., 2019

2017
Coordinative production and maintenance scheduling problem with flexible maintenance time intervals.
J. Intell. Manuf., 2017


  Loading...