Mohammad Hasan Sebt

Orcid: 0000-0002-5276-1827

According to our database1, Mohammad Hasan Sebt authored at least 9 papers between 2009 and 2022.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2022
Optimal sub-contractor selection and allocation in a multiple construction project: Project portfolio planning in practice.
J. Oper. Res. Soc., 2022

2021
A genetic algorithm for subcontractors selection and allocation in multiple building projects.
Soft Comput., 2021

An interval type-2 fuzzy MCDM model for work package subcontractor prequalification.
Soft Comput., 2021

2020
A mixed-integer linear programming model for solving fuzzy stochastic resource constrained project scheduling problem.
Oper. Res., 2020

2019
Solving the FS-RCPSP with hyper-heuristics: A policy-driven approach.
J. Oper. Res. Soc., 2019

2013
Solving resource-constrained project scheduling problem with evolutionary programming.
J. Oper. Res. Soc., 2013

2012
Computing with words for hierarchical competency based selection of personnel in construction companies.
Appl. Soft Comput., 2012

2010
Competency Based Optimized Assignment of Project Managers to Projects.
Proceedings of the 12th UKSim, 2010

2009
Optimized Allocation of Expert Human Resources to Project.
Proceedings of the Third Asia International Conference on Modelling & Simulation, 2009


  Loading...