Mohamed Karim Hajji

Orcid: 0009-0007-1735-3522

According to our database1, Mohamed Karim Hajji authored at least 4 papers between 2015 and 2023.

Collaborative distances:
  • Dijkstra number2 of six.
  • Erdős number3 of four.

Timeline

2015
2016
2017
2018
2019
2020
2021
2022
2023
0
1
2
3
1
1
2

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2023
Makespan Minimization for the Two-Stage Hybrid Flow Shop Problem with Dedicated Machines: A Comprehensive Study of Exact and Heuristic Approaches.
Comput., June, 2023

2018
On the optimality conditions of the two-machine flow shop problem.
Eur. J. Oper. Res., 2018

2015
On the two-stage hybrid flow shop with dedicated machines.
RAIRO Oper. Res., 2015

The two-stage hybrid flow shop problem with dedicated machines under release dates and delivery times.
Int. J. Adv. Oper. Manag., 2015


  Loading...