Mir-Bahador Aryanezhad
According to our database1,
Mir-Bahador Aryanezhad
authored at least 25 papers
between 2003 and 2013.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
On csauthors.net:
Bibliography
2013
An economic order quantity model with multiple partial prepayments and partial backordering.
Math. Comput. Model., 2013
A hybrid method of fuzzy simulation and genetic algorithm to optimize constrained inventory control systems with stochastic replenishments and fuzzy demand.
Inf. Sci., 2013
2012
An economic production quantity model with random yield subject to process compressibility.
Math. Comput. Model., 2012
Developing a multi-objective, multi-item inventory model and three algorithms for its solution.
J. Zhejiang Univ. Sci. C, 2012
Eur. J. Oper. Res., 2012
Appl. Soft Comput., 2012
2011
New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing.
J. Sched., 2011
A modular Decision Support System for optimum investment selection in presence of uncertainty: Combination of fuzzy mathematical programming and fuzzy rule based system.
Expert Syst. Appl., 2011
A multi-period facility location-relocation problem in the presence of a probabilistic line barrier.
Proceedings of the 2011 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 2011
2010
Optimising multi-product multi-chance-constraint inventory control system with stochastic period lengths and total discount under fuzzy purchasing price and holding costs.
Int. J. Syst. Sci., 2010
2009
A hybrid method of Pareto, TOPSIS and genetic algorithm to optimize multi-product multi-constraint inventory control systems with random fuzzy replenishments.
Math. Comput. Model., 2009
A novel approach to determine cell formation, intracellular machine layout and cell layout in the CMS problem based on TOPSIS method.
Comput. Oper. Res., 2009
Asia Pac. J. Oper. Res., 2009
2008
A clustering approach to identify the time of a step change in Shewhart control charts.
Qual. Reliab. Eng. Int., 2008
Integrating goal programming, Kuhn-Tucker conditions, and penalty function approaches to solve linear bi-level programming problems.
Appl. Math. Comput., 2008
Appl. Math. Comput., 2008
2007
A new approach for the cellular manufacturing problem in fuzzy dynamic conditions by a genetic algorithm.
J. Intell. Fuzzy Syst., 2007
A probabilistic bi-level linear multi-objective programming problem to supply chain planning.
Appl. Math. Comput., 2007
Proceedings of the IEEE International Conference on Systems, 2007
2005
Appl. Math. Comput., 2005
2004
Math. Methods Oper. Res., 2004
2003
J. Oper. Res. Soc., 2003