Mary E. Kurz

Orcid: 0000-0002-7964-3994

According to our database1, Mary E. Kurz authored at least 17 papers between 2004 and 2024.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of two.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2024
Mixed-model sequencing with stochastic failures: A case study for automobile industry.
Eur. J. Oper. Res., 2024

2023
Hybrid multi-objective evolutionary meta-heuristics for a parallel machine scheduling problem with setup times and preferences.
Comput. Ind. Eng., November, 2023

Mixed-model Sequencing with Reinsertion of Failed Vehicles: A Case Study for Automobile Industry.
CoRR, 2023

2022
Clemson University's Rotational Attendance Plan During COVID-19.
INFORMS J. Appl. Anal., 2022

A Framework for Operations Research Model Use in Resilience to Fundamental Surprise Events: Observations from University Operations during COVID-19.
CoRR, 2022

Introducing preferences in scheduling applications.
Comput. Ind. Eng., 2022

2019
Two-stage hybrid flow shop batching and lot streaming with variable sublots and sequence-dependent setups.
Int. J. Prod. Res., 2019

Application of a Controlled Assembly Vocabulary: Modeling a Home Appliance Transfer Line.
Proceedings of the Advances in Production Management Systems. Towards Smart Production Management Systems, 2019

2018
Mixed model line balancing with parallel stations, zoning constraints, and ergonomics.
Constraints An Int. J., 2018

On scheduling a photolithography area containing cluster tools.
Comput. Ind. Eng., 2018

2017
Solving the traveling salesman problem with interdiction and fortification.
Oper. Res. Lett., 2017

2014
Supply network design: Risk-averse or risk-neutral?
Comput. Ind. Eng., 2014

2010
Metaheuristics for assortment problems with multiple quality levels.
Comput. Oper. Res., 2010

2008
A memetic random-key genetic algorithm for a symmetric multi-objective traveling salesman problem.
Comput. Ind. Eng., 2008

2007
Multi-Objective Semiconductor Manufacturing Scheduling: A Random Keys Implementation of NSGA-II.
Proceedings of the 2007 IEEE Symposium on Computational Intelligence in Scheduling, 2007

2005
Minimizing total flowtime and maximum earliness on a single machine using multiple measures of fitness.
Proceedings of the Genetic and Evolutionary Computation Conference, 2005

2004
Scheduling flexible flow lines with sequence-dependent setup times.
Eur. J. Oper. Res., 2004


  Loading...