Mario Vanhoucke
Orcid: 0000-0001-6702-3563
According to our database1,
Mario Vanhoucke
authored at least 124 papers
between 1998 and 2024.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
Online presence:
-
on orcid.org
-
on id.loc.gov
-
on d-nb.info
On csauthors.net:
Bibliography
2024
Ann. Oper. Res., June, 2024
Ann. Oper. Res., June, 2024
Ann. Oper. Res., June, 2024
An exact decomposition technique for the deadline-constrained discrete time/cost trade-off problem with discounted cash flows.
Comput. Oper. Res., March, 2024
J. Sched., February, 2024
Correction to: on the summary measures for the resource-constrained project scheduling problem.
Ann. Oper. Res., January, 2024
Eur. J. Oper. Res., 2024
Eur. J. Oper. Res., 2024
A hybrid forecasting model to predict the duration and cost performance of projects with Bayesian Networks.
Eur. J. Oper. Res., 2024
A genetic algorithm for the Resource-Constrained Project Scheduling Problem with Alternative Subgraphs using a boolean satisfiability solver.
Eur. J. Oper. Res., 2024
A genetic algorithm with resource buffers for the resource-constrained multi-project scheduling problem.
Eur. J. Oper. Res., 2024
Comput. Oper. Res., 2024
2023
Comput. Oper. Res., September, 2023
A comparison of activity ranking methods for taking corrective actions during project control.
Comput. Ind. Eng., September, 2023
Automated design of priority rules for resource-constrained project scheduling problem using surrogate-assisted genetic programming.
Swarm Evol. Comput., August, 2023
Constructive heuristics for selecting and scheduling alternative subgraphs in resource-constrained projects.
Comput. Ind. Eng., August, 2023
Multi-project scheduling: A benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates.
Eur. J. Oper. Res., July, 2023
A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem.
Eur. J. Oper. Res., May, 2023
New resource-constrained project scheduling instances for testing (meta-)heuristic scheduling algorithms.
Comput. Oper. Res., May, 2023
A prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problem.
Eur. J. Oper. Res., 2023
2022
A Theoretical Framework for Instance Complexity of the Resource-Constrained Project Scheduling Problem.
Math. Oper. Res., November, 2022
Multimode time-cost-robustness trade-off project scheduling problem under uncertainty.
J. Comb. Optim., 2022
Various extensions in resource-constrained project scheduling with alternative subgraphs.
Int. J. Prod. Res., 2022
An efficient genetic programming approach to design priority rules for resource-constrained project scheduling problem.
Expert Syst. Appl., 2022
Using Earned Value Management and Schedule Risk Analysis with resource constraints for project control.
Eur. J. Oper. Res., 2022
Eur. J. Oper. Res., 2022
Eur. J. Oper. Res., 2022
Comput. Oper. Res., 2022
Mathematical formulations for project scheduling problems with categorical and hierarchical skills.
Comput. Ind. Eng., 2022
Manufacturing project scheduling considering human factors to minimize total cost and carbon footprints.
Appl. Soft Comput., 2022
2021
Automatic detection of the best performing priority rule for the resource-constrained project scheduling problem.
Expert Syst. Appl., 2021
Eur. J. Oper. Res., 2021
A new algorithm for resource-constrained project scheduling with breadth and depth of skills.
Eur. J. Oper. Res., 2021
Practical application of reference class forecasting for cost and time estimations: Identifying the properties of similarity.
Eur. J. Oper. Res., 2021
An analysis of network and resource indicators for resource-constrained project scheduling problem instances.
Comput. Oper. Res., 2021
A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing.
Comput. Oper. Res., 2021
Finite inventory budgets in production capacity and safety stock placement under the guaranteed service approach.
Comput. Oper. Res., 2021
Comput. Ind. Eng., 2021
2020
Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling.
J. Sched., 2020
Eur. J. Oper. Res., 2020
A decomposed branch-and-price procedure for integrating demand planning in personnel staffing problems.
Eur. J. Oper. Res., 2020
Eur. J. Oper. Res., 2020
Comput. Oper. Res., 2020
Comput. Oper. Res., 2020
Analysing the impact of alternative network structures on resource-constrained schedules: Artificial and empirical experiments.
Comput. Ind. Eng., 2020
Mode generation rules to define activity flexibility for the integrated project staffing problem with discrete time/resource trade-offs.
Ann. Oper. Res., 2020
A Simulation Study on the Impact of Activity Crashing on the Project Duration and Cost under Different Budget Release Scenarios.
Proceedings of the 2020 Federated Conference on Computer Science and Information Systems, 2020
2019
Strategies for project scheduling with alternative subgraphs under uncertainty: similar and dissimilar sets of schedules.
Eur. J. Oper. Res., 2019
A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs.
Eur. J. Oper. Res., 2019
The impact of applying effort to reduce activity variability on the project time and cost performance.
Eur. J. Oper. Res., 2019
A Statistical Method for Estimating Activity Uncertainty Parameters to Improve Project Forecasting.
Entropy, 2019
Comput. Oper. Res., 2019
The impact of solution representations on heuristic net present value optimization in discrete time/cost trade-off project scheduling with multiple cash flow and payment models.
Comput. Oper. Res., 2019
A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints.
Comput. Oper. Res., 2019
Comput. Oper. Res., 2019
Comput. Oper. Res., 2019
Comput. Ind. Eng., 2019
Comput. Ind. Eng., 2019
2018
A perturbation matheuristic for the integrated personnel shift and task re-scheduling problem.
Eur. J. Oper. Res., 2018
Eur. J. Oper. Res., 2018
An exact composite lower bound strategy for the resource-constrained project scheduling problem.
Comput. Oper. Res., 2018
A tool to test and validate algorithms for the resource-constrained project scheduling problem.
Comput. Ind. Eng., 2018
2017
A metaheuristic solution approach for the time-constrained project scheduling problem.
OR Spectr., 2017
A Nearest Neighbour extension to project duration forecasting with Artificial Intelligence.
Eur. J. Oper. Res., 2017
Capital- and resource-constrained project scheduling with net present value optimization.
Eur. J. Oper. Res., 2017
A parallel multi-objective scatter search for optimising incentive contract design in projects.
Eur. J. Oper. Res., 2017
On the performance of priority rules for the stochastic resource constrained multi-project scheduling problem.
Comput. Ind. Eng., 2017
Comput. Ind. Eng., 2017
A resource type analysis of the integrated project scheduling and personnel staffing problem.
Ann. Oper. Res., 2017
2016
An exact algorithm for an integrated project staffing problem with a homogeneous workforce.
J. Sched., 2016
A comparative study of Artificial Intelligence methods for project duration forecasting.
Expert Syst. Appl., 2016
Eur. J. Oper. Res., 2016
Payment models and net present value optimization for resource-constrained project scheduling.
Comput. Ind. Eng., 2016
2015
A comparison of the performance of various project control methods using earned value management systems.
Expert Syst. Appl., 2015
Decis. Support Syst., 2015
Hybrid tabu search and a truncated branch-and-bound for the unrelated parallel machine scheduling problem.
Comput. Oper. Res., 2015
Comput. Ind. Eng., 2015
Blended Learning in Project Management - Experiences on Business Games and Case Studies.
Proceedings of the CSEDU 2015, 2015
2014
Analysis of the Integration of the Physician Rostering Problem and the Surgery Scheduling Problem.
J. Medical Syst., 2014
An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances.
Eur. J. Oper. Res., 2014
A hybrid Electromagnetism-like Mechanism/tabu search procedure for the single machine scheduling problem with a maximum lateness objective.
Comput. Ind. Eng., 2014
2013
An Artificial Immune System Based Approach for Solving the Nurse Re-rostering Problem.
Proceedings of the Evolutionary Computation in Combinatorial Optimization, 2013
2012
A hybrid genetic algorithm for the single machine maximum lateness problem with release times and family setups.
Comput. Oper. Res., 2012
2011
Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem.
J. Heuristics, 2011
A hybrid single and dual population search procedure for the job shop scheduling problem.
Eur. J. Oper. Res., 2011
Eur. J. Oper. Res., 2011
Applying a hybrid job shop procedure to a Belgian manufacturing company producing industrial wheels and castors in rubber.
Comput. Ind. Eng., 2011
A Hybrid Dual-Population Genetic Algorithm for the Single Machine Maximum Lateness Problem.
Proceedings of the Evolutionary Computation in Combinatorial Optimization, 2011
2010
Branching strategies in a branch-and-price approach for a multiple objective nurse scheduling problem.
J. Sched., 2010
INFORMS Trans. Educ., 2010
A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem.
Eur. J. Oper. Res., 2010
A hybrid scatter search heuristic for personalized crew rostering in the airline industry.
Eur. J. Oper. Res., 2010
2009
The impact of incorporating nurse-specific characteristics in a cyclical scheduling approach.
J. Oper. Res. Soc., 2009
Eur. J. Oper. Res., 2009
A Genetic Algorithm for Net Present Value Maximization for Resource Constrained Projects.
Proceedings of the Evolutionary Computation in Combinatorial Optimization, 2009
An Artificial Immune System for the Multi-Mode Resource-Constrained Project Scheduling Problem.
Proceedings of the Evolutionary Computation in Combinatorial Optimization, 2009
2008
Diversity in Resource Consumption Patterns and Robustness of Costing Systems to Errors.
Manag. Sci., 2008
An evaluation of the adequacy of project network generators with systematically sampled networks.
Eur. J. Oper. Res., 2008
The impact of various activity assumptions on the lead time and resource utilization of resource-constrained projects.
Comput. Ind. Eng., 2008
Comput. Ind. Eng., 2008
Comparison and hybridization of crossover operators for the nurse scheduling problem.
Ann. Oper. Res., 2008
2007
J. Sched., 2007
A simulation and evaluation of earned value metrics to forecast the project duration.
J. Oper. Res. Soc., 2007
A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem.
Oper. Res., 2007
J. Heuristics, 2007
2006
Eur. J. Oper. Res., 2006
Proceedings of the Computational Science and Its Applications, 2006
Proceedings of the Evolutionary Computation in Combinatorial Optimization, 2006
New Computational Results for the Nurse Scheduling Problem: A Scatter Search Algorithm.
Proceedings of the Evolutionary Computation in Combinatorial Optimization, 2006
2005
New computational results for the discrete time/cost trade-off problem with time-switch constraints.
Eur. J. Oper. Res., 2005
A Bi-population Based Genetic Algorithm for the Resource-Constrained Project Scheduling Problem.
Proceedings of the Computational Science and Its Applications, 2005
The Electromagnetism Meta-heuristic Applied to the Resource-Constrained Project Scheduling Problem.
Proceedings of the Artificial Evolution, 2005
2003
J. Sched., 2003
2002
J. Oper. Res. Soc., 2002
2001
On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints.
Manag. Sci., 2001
An Exact Procedure for the Resource-Constrained Weighted Earliness-Tardiness Project Scheduling Problem.
Ann. Oper. Res., 2001
1998
New computational results on the discrete time/cost trade-off problem in project networks.
J. Oper. Res. Soc., 1998