Mario Gnägi

Orcid: 0000-0002-3423-0782

According to our database1, Mario Gnägi authored at least 9 papers between 2015 and 2024.

Collaborative distances:
  • Dijkstra number2 of six.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

Online presence:

On csauthors.net:

Bibliography

2024
MIP-based solution approaches for multi-site resource-constrained project scheduling.
Ann. Oper. Res., June, 2024

Mixed-integer linear programming for project scheduling under various resource constraints.
Eur. J. Oper. Res., 2024

2023
Workload-based Extensions of Mixed-integer Programming Models for Resource-constrained Project Scheduling.
Proceedings of the IEEE International Conference on Industrial Engineering and Engineering Management, 2023

2021
A matheuristic for large-scale capacitated clustering.
Comput. Oper. Res., 2021

2019
Two continuous-time assignment-based models for the multi-mode resource-constrained project scheduling problem.
Comput. Ind. Eng., 2019

A Continuous-Time Mixed-Binary Linear Programming Formulation for the Multi-Site Resource-Constrained Project Scheduling Problem.
Proceedings of the 2019 IEEE International Conference on Industrial Engineering and Engineering Management, 2019

2018
A Continuous-Time Unit-Based MILP Formulation for the Resource-Constrained Project Scheduling Problem.
Proceedings of the 2018 IEEE International Conference on Industrial Engineering and Engineering Management, 2018

A Continuous-Time MILP Formulation for the Multi-Mode Resource-Constrained Project Scheduling Problem.
Proceedings of the 2018 IEEE International Conference on Industrial Engineering and Engineering Management, 2018

2015
On an application of Microsoft Excel's evolutionary solver to the resource-constrained project scheduling problem RCPSP.
Proceedings of the 2015 IEEE International Conference on Industrial Engineering and Engineering Management, 2015


  Loading...