M. Selim Akturk
Orcid: 0000-0003-0515-1644
According to our database1,
M. Selim Akturk
authored at least 35 papers
between 1996 and 2018.
Collaborative distances:
Collaborative distances:
Timeline
Legend:
Book In proceedings Article PhD thesis Dataset OtherLinks
On csauthors.net:
Bibliography
2018
Bounds on risk-averse mixed-integer multi-stage stochastic programming problems with mean-CVaR.
Eur. J. Oper. Res., 2018
Comput. Oper. Res., 2018
2017
Flight Network-Based Approach for Integrated Airline Recovery with Cruise Speed Control.
Transp. Sci., 2017
Integrated aircraft-path assignment and robust schedule design with cruise speed control.
Comput. Oper. Res., 2017
2016
Ann. Oper. Res., 2016
2014
2013
Two-machine flowshop scheduling with flexible operations and controllable processing times.
Comput. Oper. Res., 2013
2012
Comput. Oper. Res., 2012
2011
Eur. J. Oper. Res., 2011
Single CNC machine scheduling with controllable processing times to minimize total weighted tardiness.
Comput. Oper. Res., 2011
Design of a Fully Automated Robotic Spot-welding Line.
Proceedings of the ICINCO 2011 - Proceedings of the 8th International Conference on Informatics in Control, Automation and Robotics, Volume 2, Noordwijkerhout, The Netherlands, 28, 2011
2010
J. Sched., 2010
Comput. Oper. Res., 2010
Comput. Oper. Res., 2010
2009
A strong conic quadratic reformulation for machine-job assignment with controllable processing times.
Oper. Res. Lett., 2009
2008
2007
Optimal allocation and processing time decisions on non-identical parallel CNC machines: epsilon-constraint approach.
Eur. J. Oper. Res., 2007
Eur. J. Oper. Res., 2007
Comput. Oper. Res., 2007
Comput. Oper. Res., 2007
Scheduling with tool changes to minimize total completion time under controllable machining conditions.
Comput. Oper. Res., 2007
2006
Eur. J. Oper. Res., 2006
2005
A new bounding mechanism for the CNC machine scheduling problems with controllable processing times.
Eur. J. Oper. Res., 2005
2004
Scheduling with tool changes to minimize total completion time: Basic results and SPT performance.
Eur. J. Oper. Res., 2004
2003
J. Intell. Manuf., 2003
2002
Comput. Oper. Res., 2002
2001
A new dominance rule to minimize total weighted tardiness with unequal release dates.
Eur. J. Oper. Res., 2001
1999
J. Intell. Manuf., 1999
Int. J. Comput. Integr. Manuf., 1999
1998
Comput. Oper. Res., 1998
1996
Comput. Oper. Res., 1996