M. Jeya Chandra

According to our database1, M. Jeya Chandra authored at least 4 papers between 1975 and 1995.

Collaborative distances:
  • Dijkstra number2 of four.
  • Erdős number3 of four.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

1995
An approximation analysis for multistage production lines.
Comput. Oper. Res., 1995

1990
A heuristic algorithm to minimize the number of crews allocated in an airlift operation.
Comput. Oper. Res., 1990

1978
An investigation of the effect of product quality on rework manpower during production via simulation.
Proceedings of the 10th conference on Winter simulation, 1978

1975
Approximate Solutions for Some Two-Stage Tandem Queues, Part 1: Individual Arrivals at the Second Stage.
Oper. Res., 1975


  Loading...