Konstantinos P. Anagnostopoulos

Affiliations:
  • Democritus University of Thrace, Xanthi, Greece


According to our database1, Konstantinos P. Anagnostopoulos authored at least 15 papers between 2001 and 2019.

Collaborative distances:
  • Dijkstra number2 of five.
  • Erdős number3 of five.

Timeline

Legend:

Book 
In proceedings 
Article 
PhD thesis 
Dataset
Other 

Links

On csauthors.net:

Bibliography

2019
Spatial multicriteria decision support for robust land-use suitability: The case of landfill site selection in Northeastern Greece.
Eur. J. Oper. Res., 2019

2015
Structural properties and interaction energies affecting drug design. An approach combining molecular simulations, statistics, interaction energies and neural networks.
Comput. Biol. Chem., 2015

2014
A particle swarm optimization based hyper-heuristic algorithm for the classic resource constrained project scheduling problem.
Inf. Sci., 2014

2012
Resource-Constrained Critical Path Scheduling by a GRASP-Based Hyperheuristic.
J. Comput. Civ. Eng., 2012

2011
The mean-variance cardinality constrained portfolio optimization problem: An experimental evaluation of five multiobjective evolutionary algorithms.
Expert Syst. Appl., 2011

Multiobjective evolutionary algorithms for complex portfolio optimization problems.
Comput. Manag. Sci., 2011

2010
Land suitability analysis for natural wastewater treatment systems using a new GIS add-in for supporting criterion weight elicitation methods.
Oper. Res., 2010

A portfolio optimization model with three objectives and discrete variables.
Comput. Oper. Res., 2010

Experimental evaluation of simulated annealing algorithms for the time-cost trade-off problem.
Appl. Math. Comput., 2010

A genetic hyperheuristic algorithm for the resource constrained project scheduling problem.
Proceedings of the IEEE Congress on Evolutionary Computation, 2010

2006
An AHP model for construction contractor prequalification.
Oper. Res., 2006

2004
Project management: Epistemological issues and standardization of knowledge.
Oper. Res., 2004

2002
A fast algorithm for time compression in project scheduling.
Oper. Res., 2002

Editorial.
Oper. Res., 2002

2001
Time-cost trade off in cpm networks by simulated annealing.
Oper. Res., 2001


  Loading...